 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/13/2021 |
122821704 |
10 |
A1 |
P APPROVED |
05/14/2021 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/25/2021 |
122821704 |
09 |
A1 |
P APPROVED |
03/29/2021 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 12/17/2020 |
122821704 |
08 |
A1 |
P APPROVED |
01/19/2021 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 08/13/2020 |
122821704 |
07 |
A1 |
P APPROVED |
08/28/2020 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 06/29/2020 |
140614342 |
02 |
A3 |
P APPROVED |
08/04/2020 |
|
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/30/2019 |
122821704 |
06 |
A1 |
P APPROVED |
06/27/2019 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 04/01/2019 |
140628667 |
02 |
A3 |
P APPROVED |
04/02/2019 |
|
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/10/2018 |
122821704 |
05 |
A1 |
P APPROVED |
12/10/2018 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/12/2018 |
123467079 |
01 |
A2 |
X SIGNED OFF |
10/13/2020 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR A NEW TEMPORARY LOOP SPRINKLER SYSTEM DURING CONSTRUCT
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 06/27/2018 |
140779281 |
01 |
A2 |
X SIGNED OFF |
09/18/2020 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR THE INSTALLATION OF A NEW SPRINKLER SYSTEM IN CONJUNCT
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/07/2018 |
140746227 |
01 |
A2 |
D A/P ENTIRE |
03/07/2018 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/06/2018 HEREWITH FILING FOR THE INSTALLATION OF A SPRINKLE
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 03/07/2018 |
140746156 |
01 |
A2 |
D A/P ENTIRE |
03/07/2018 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/07/2018 HEREWITH FILING FOR THE INSTALLATION OF A SPRINKL
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 07/27/2017 |
122821704 |
04 |
A1 |
P APPROVED |
07/31/2017 |
|
BARLOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 HEREWITH RE-FILING A NEW APPLICATION TO DUP
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 04/11/2017 |
140628667 |
01 |
A3 |
X SIGNED OFF |
11/01/2019 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPL
|
|
Work on Floor(s): OSP
|
| 03/07/2017 |
140614342 |
01 |
A3 |
X SIGNED OFF |
08/06/2020 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): OSP
|
| 03/07/2017 |
140614315 |
01 |
A3 |
H P/E IN PROCESS |
03/07/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/06/2017 INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR INSPEC
|
|
Work on Floor(s): OSP
|
| 03/07/2017 |
140613646 |
01 |
A3 |
X SIGNED OFF |
08/16/2023 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 09/22/2016 |
122821704 |
03 |
A1 |
X SIGNED OFF |
12/14/2023 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
HEREWITH FILING MECHANICAL AND PLUMBING WORK AS PER PLANS SUBMITTED.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/22/2016 |
122821704 |
02 |
A1 |
X SIGNED OFF |
12/14/2023 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING STRUCTURAL WORK THROUGHOUT, AS PER PLANS SUBMITTED.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 08/30/2016 |
122821704 |
01 |
A1 |
X SIGNED OFF |
12/14/2023 |
0025757 RA |
BARLOW |
|
NOT APPLICABLE
|
|
HEREWITH RE-FILING A NEW APPLICATION TO DUPLICATE APPROVAL UNDER ALT 1
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 07/01/2013 |
120828961 |
03 |
A1 |
P APPROVED |
08/27/2013 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/21/2020 HEREWITH FILING MECHANICAL AND PLUMBING WORK AS P
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 07/01/2013 |
120828961 |
02 |
A1 |
P APPROVED |
08/27/2013 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/21/2020 HEREWITH FILING STRUCTURAL WORK THROUGHOUT, AS PE
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/16/2011 |
120828961 |
01 |
A1 |
P APPROVED |
08/27/2013 |
0025757 RA |
BARLOW |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/21/2020 HEREWITH FILING TO CONVERT AN EXISTING MULTIPLE D
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 09/02/2008 |
110226069 |
02 |
A2 |
P APPROVED |
11/06/2008 |
|
TURNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 08/04/2008 |
110226069 |
01 |
A2 |
X SIGNED OFF |
02/10/2009 |
0016162 RA |
TURNER |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 5A INCLUDING NEW PARTITIONS AND PLUMBING. NO CHANG
|
|
Work on Floor(s): 005
|
| 05/15/2008 |
104910955 |
02 |
A2 |
P APPROVED |
05/22/2008 |
|
Turner |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 10/01/2007 |
104910955 |
01 |
A2 |
X SIGNED OFF |
09/04/2008 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
General construction to include new partitions and plumbing for apartment
|
|
Work on Floor(s): 004
|
| 03/28/2007 |
104707248 |
01 |
A2 |
X SIGNED OFF |
12/20/2007 |
0016162 RA |
Turner |
|
NOT APPLICABLE
|
|
General construction to include new partitions. Replacing new fixtures on
|
|
Work on Floor(s): 002
|