| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/20/2003 |
102768863 |
06 |
A1 |
P APPROVED |
08/26/2004 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 02/03/2003 |
102768863 |
05 |
A1 |
P APPROVED |
02/06/2003 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 06/14/2002 |
102768863 |
04 |
A1 |
P APPROVED |
06/18/2002 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 03/07/2002 |
102768863 |
03 |
A1 |
P APPROVED |
03/15/2002 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 05/01/2001 |
102546345 |
01 |
A3 |
X SIGNED OFF |
04/12/2002 |
|
ZAHASRIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SCAFFOLD 20' LONG BY 38' HIGH DURING
|
|
Work on Floor(s): GRD
|
| 05/01/2001 |
102529934 |
01 |
A3 |
X SIGNED OFF |
04/12/2002 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 20'DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|
| 09/25/2000 |
102777871 |
01 |
A2 |
X SIGNED OFF |
06/25/2002 |
0018459 RA |
VAIL |
|
NOT APPLICABLE
|
|
REMOVAL OF INTERIOR PARTITIONS AND PLUMBING LINES AND FIXTURES.
|
|
Work on Floor(s): CEL,BAS,001,002,003,4
|
| 09/18/2000 |
102768863 |
02 |
A1 |
X SIGNED OFF |
02/09/2005 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
NEW AIR CONDITIONING SYSTEM NEW PLUMBING LINES FIXTURES AND GAS PPING NE
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 09/18/2000 |
102768863 |
01 |
A1 |
X SIGNED OFF |
02/09/2005 |
0018459 RA |
VAIL |
|
NOT APPLICABLE
|
|
CONVERSION FROM MULTIPLE DWELLOING TO SINGLE FAMILY DWELLING. NEW INTERIOR
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 03/20/1996 |
101267807 |
01 |
A2 |
X SIGNED OFF |
11/12/2025 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER. INSTALL (2) GAS HOT WATER HEATERS, NEW GAS SERVICE,
|
|
Work on Floor(s): CEL
|