 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/10/2018 |
123519594 |
01 |
A3 |
R PERMIT-ENTIRE |
08/20/2018 |
0090913 PE |
PAPAGIAN |
|
NOT APPLICABLE
|
|
STRUCTURAL REPLACEMENT OF JOIST DAMAGE DUE FIRE. ALL AS PER PLANS FILE HER
|
|
Work on Floor(s): 004
|
| 07/03/2018 |
123376266 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/16/2018 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
EMERGENCY REPAIR OF INTERIOR AREAS AFFECTED BY FIRE AND WATER PENETRATION
|
|
Work on Floor(s): 003,004,005
|
| 07/03/2018 |
140781107 |
01 |
A2 |
H P/E IN PROCESS |
07/03/2018 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/03/2018 REPAIR AND REPLACEMENT OF JOIST DAMAGE IN ELECTRI
|
|
Work on Floor(s): 003,004,005
|
| 04/13/2016 |
140482788 |
01 |
A3 |
X SIGNED OFF |
09/22/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 04/13/2016 |
140482779 |
01 |
A3 |
X SIGNED OFF |
09/22/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 06/13/2005 |
104137569 |
01 |
A2 |
X SIGNED OFF |
10/05/2006 |
0011589 RA |
Hess |
|
NOT APPLICABLE
|
|
New enclosure of boiler room. New toilet. Slab replacement. New fan. Relat
|
|
Work on Floor(s): CEL
|