11/04/2024 |
121190200 |
42 |
NB |
P APPROVED |
11/07/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|
09/27/2024 |
141023595 |
03 |
A3 |
P APPROVED |
10/01/2024 |
|
DETERNOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017 thru 038
|
09/26/2024 |
141026495 |
01 |
A2 |
R PERMIT-ENTIRE |
09/27/2024 |
0089761 PE |
DETERNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION DESIGN AND USAGE OF MINI-CRANE AS PER DRAWINGS. MANUFACTURER'
|
|
Work on Floor(s): 016
|
09/26/2024 |
121190200 |
41 |
NB |
P APPROVED |
10/02/2024 |
|
RUSSO |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
09/20/2024 |
141021828 |
05 |
A2 |
P APPROVED |
09/23/2024 |
|
DIALBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
08/29/2024 |
124041090 |
01 |
SI |
U COMPLETED |
10/10/2024 |
0020741 RA |
RUSSO |
|
NOT APPLICABLE
|
|
SUBDIVISION APPLICATION FOR THE APPORTIONMENT BETWEEN LOT 45 AND LOT 52.
|
07/22/2024 |
121190200 |
40 |
NB |
P APPROVED |
08/08/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|
07/22/2024 |
121190200 |
39 |
NB |
P APPROVED |
08/08/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
07/16/2024 |
121190200 |
38 |
NB |
P APPROVED |
08/08/2024 |
|
RUSSO |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
07/08/2024 |
141026020 |
01 |
A3 |
P APPROVED |
08/15/2024 |
0020741 RA |
RUSSO |
|
NOT APPLICABLE
|
|
THE PLANS SHOW THE PROPOSED MARQUEE #2 AS THE PART OF THE NB PERMITTED NO.
|
|
Work on Floor(s): 001,002,OG
|
07/08/2024 |
141026011 |
01 |
A3 |
P APPROVED |
08/15/2024 |
0020741 RA |
RUSSO |
|
NOT APPLICABLE
|
|
THE PLANS SHOW THE PROPOSED MARQUEE #1 AS THE PART OF THE NB PERMITTED NO.
|
|
Work on Floor(s): 001,002,OG
|
06/06/2024 |
140859514 |
05 |
A3 |
G PAA FEE DUE |
06/06/2024 |
|
CHARLESW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
05/29/2024 |
124040359 |
01 |
SC |
U COMPLETED |
06/26/2024 |
0020741 RA |
RUSSO |
|
NOT APPLICABLE
|
|
CONDO SUBDIVISION APPLICATION (SI) IN CONJUNCTION WITH THE NB #121190200.
|
04/30/2024 |
141025842 |
01 |
A3 |
R PERMIT-ENTIRE |
05/01/2024 |
0089761 PE |
DETERNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION DESIGN AND USAGE OF HOISTING SYSTEM WITH SUSP. SCAFFOLD SYSTE
|
|
Work on Floor(s): TOH
|
04/05/2024 |
121190200 |
37 |
NB |
P APPROVED |
04/23/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
04/05/2024 |
121190200 |
36 |
NB |
P APPROVED |
04/23/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|
04/05/2024 |
121190200 |
35 |
NB |
P APPROVED |
04/23/2024 |
0093540 PE |
SULLIVAN |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
04/04/2024 |
121190200 |
34 |
NB |
P APPROVED |
04/29/2024 |
|
RUSSO |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
02/06/2024 |
141021828 |
04 |
A2 |
P APPROVED |
02/07/2024 |
|
DIALBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
01/22/2024 |
141020721 |
03 |
A2 |
P APPROVED |
01/23/2024 |
|
DETERNOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 040
|
12/20/2023 |
121190200 |
33 |
NB |
P APPROVED |
01/02/2024 |
0093540 PE |
SULLIVAN |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
12/20/2023 |
121190200 |
32 |
NB |
P APPROVED |
01/12/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
12/20/2023 |
121190200 |
31 |
NB |
P APPROVED |
01/12/2024 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|
12/19/2023 |
121190200 |
30 |
NB |
P APPROVED |
01/02/2024 |
|
RUSSO |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
11/17/2023 |
140840311 |
05 |
A3 |
P APPROVED |
11/28/2023 |
|
CHARLESW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
11/08/2023 |
141021828 |
03 |
A2 |
P APPROVED |
11/15/2023 |
|
DIALBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
11/01/2023 |
141021828 |
02 |
A2 |
P APPROVED |
11/02/2023 |
|
DIALBERT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
10/24/2023 |
141020721 |
02 |
A2 |
P APPROVED |
10/25/2023 |
|
DETERNOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 035
|
09/06/2023 |
141024497 |
01 |
A3 |
X SIGNED OFF |
02/16/2024 |
0089761 PE |
DETERNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION DESIGN AND USAGE OF MONORAIL SYSTEM WITH SUSP. SCAFFOLD SYSTE
|
|
Work on Floor(s): 017
|
08/04/2023 |
140550776 |
03 |
A2 |
P APPROVED |
08/17/2023 |
|
OSKWAREK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 041
|
07/19/2023 |
121190200 |
29 |
NB |
P APPROVED |
07/25/2023 |
0093540 PE |
SULLIVAN |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): UDG,SC1,CEL
|
07/17/2023 |
141023595 |
02 |
A3 |
P APPROVED |
08/07/2023 |
|
DETERNOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017 thru 038
|
07/03/2023 |
121190200 |
28 |
NB |
P APPROVED |
07/25/2023 |
0093540 PE |
SULLIVAN |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
07/03/2023 |
121190200 |
27 |
NB |
P APPROVED |
07/24/2023 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|
07/03/2023 |
121190200 |
26 |
NB |
P APPROVED |
07/27/2023 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
07/03/2023 |
121190200 |
25 |
NB |
P APPROVED |
07/25/2023 |
|
RUSSO |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
06/01/2023 |
141023595 |
01 |
A3 |
R PERMIT-ENTIRE |
06/05/2023 |
0089761 PE |
DETERNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION DESIGN AND USAGE OF MONORAIL SYSTEM WITH SUSPENDED SCAFFOLD S
|
|
Work on Floor(s): 017 thru 038
|
03/22/2023 |
121190200 |
24 |
NB |
P APPROVED |
04/07/2023 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 06
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
03/22/2023 |
121190200 |
23 |
NB |
P APPROVED |
04/03/2023 |
0093540 PE |
SULLIVAN |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): SUB,CEL,MZ1,ROF 001 thru 039
|
03/21/2023 |
121190200 |
22 |
NB |
P APPROVED |
04/11/2023 |
0072169 PE |
OSKWAREK |
|
AMENDED 04/04/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROF,MZ1 001 thru 039
|