 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/25/2019 |
123753642 |
01 |
A2 |
J P/E DISAPPROVED |
06/26/2019 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/12/2024 JOB FILED FOR APT E1N INTERIOR RENOVATION AS SHOW
|
|
Work on Floor(s): 001
|
|
123898256 |
01 |
A2 |
A PRE-FILED |
06/05/2019 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/08/2024 JOB FILED FOR APT E1N INTERIOR RENOVATION AS SHOW
|
|
Work on Floor(s): 001,003
|
| 03/09/2015 |
122241421 |
01 |
A2 |
X SIGNED OFF |
11/13/2015 |
0071977 PE |
BOCCIA |
|
NOT APPLICABLE
|
|
FILING FOR NEW REAR MASONRY WALL AND ROOF RESTORATION AS SHOWN ON DRAWINGS
|
|
Work on Floor(s): 1ST,ROF
|
| 01/15/2015 |
122186927 |
01 |
A2 |
R PERMIT-ENTIRE |
05/19/2015 |
0049458 PE |
TUNG |
|
NOT APPLICABLE
|
|
JOB FILED FOR APT W2S INTERIOR RENOVATION AS PLAN SHOWS. NO CHANGE OF USE,
|
|
Work on Floor(s): 002
|
| 08/27/2014 |
121931785 |
01 |
A2 |
R PERMIT-ENTIRE |
05/19/2015 |
0049458 PE |
TUNG |
|
NOT APPLICABLE
|
|
JOB FILED FOR APT E2N, W1S, W3N, W3S INTERIOR RENOVATION AS PLAN SHOWS. NO
|
|
Work on Floor(s): 001 thru 003
|
| 01/27/2014 |
121905402 |
01 |
A2 |
R PERMIT-ENTIRE |
05/08/2017 |
0049458 PE |
TUNG |
|
NOT APPLICABLE
|
|
JOB FILED FOR HALLWAY, LOBBY, FACADE RENOVATION AS PLAN SHOWS. NO CHANGE O
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/15/2013 |
120606139 |
03 |
PA |
P APPROVED |
04/23/2013 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 01/29/2013 |
120606139 |
02 |
PA |
P APPROVED |
02/08/2013 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 12/21/2011 |
120931475 |
01 |
A2 |
X SIGNED OFF |
10/02/2012 |
0028476 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
REPLACE STAGE WITH NEW AND INSTALL STAIRS AT SAME. NO CHANGE IN USE OR OCC
|
|
Work on Floor(s): 001
|
| 07/25/2011 |
120606139 |
01 |
PA |
U COMPLETED |
06/05/2013 |
0028476 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
Work on Floor(s): BAS
|
| 02/24/2004 |
103714820 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/10/2004 |
0076805 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/12/2024 REPLACE GAS BOILER ALL GAS PIPING AND GA S METER
|
|
Work on Floor(s): CEL
|
| 12/09/2003 |
103634630 |
01 |
A2 |
R PERMIT-ENTIRE |
01/30/2004 |
0018233 RA |
Guthartz |
|
NOT APPLICABLE
|
|
Install two new AC units, 20 ton & 10 ton, on the roof. No change in use,
|
|
Work on Floor(s): ROF
|
| 06/04/1998 |
102253277 |
01 |
A2 |
R PERMIT-ENTIRE |
07/07/1998 |
0051094 PE |
Katz |
|
NOT APPLICABLE
|
|
Installation of interior fire alarm and signal system to comply with Local
|
|
Work on Floor(s): CEL,BAS,ROF
|
| 04/14/1998 |
101836382 |
01 |
A1 |
J P/E DISAPPROVED |
04/30/1998 |
0014673 RA |
SCHWARTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/06/2024 NO WORK TO BE DONE. PROPOSED CHANGE OF U SE FROM
|
|
Work on Floor(s): BAS,CEL
|
| 03/31/1992 |
100382774 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/20/1992 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
INSTALL ANSUL SYSTEM IN KITCHEN NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 1
|