| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/25/2024 |
121501008 |
03 |
PA |
P APPROVED |
05/07/2024 |
0015015 RA |
NICHOLSO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
| 09/23/2021 |
123906531 |
01 |
SC |
U COMPLETED |
01/13/2022 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 29 INTO FIVE (5) CONDO
|
|
Work on Floor(s): ENT
|
| 06/28/2021 |
123534504 |
14 |
A1 |
P APPROVED |
07/01/2021 |
|
BASLER |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003,ROF 014 thru 018
|
| 04/23/2021 |
123534504 |
13 |
A1 |
P APPROVED |
04/28/2021 |
|
BASLER |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003,ROF 014 thru 019
|
| 12/03/2020 |
123534504 |
12 |
A1 |
P APPROVED |
12/16/2020 |
0059357 PE |
MAYBAUM |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,017,018,019,ROF
|
| 11/09/2020 |
123401201 |
04 |
A2 |
P APPROVED |
12/02/2020 |
|
MAYBAUM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 015,017
|
| 09/15/2020 |
123534504 |
11 |
A1 |
P APPROVED |
09/28/2020 |
0059357 PE |
MAYBAUM |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,017,018,019,ROF
|
| 09/08/2020 |
123534504 |
10 |
A1 |
P APPROVED |
10/28/2020 |
0074933 PE |
DESIMONE |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 015 thru 018
|
| 09/08/2020 |
123534504 |
09 |
A1 |
P APPROVED |
10/07/2020 |
|
BASLER |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, 003,ROF 014 thru 019
|
| 08/15/2020 |
123509453 |
04 |
A2 |
P APPROVED |
09/01/2020 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/06/2020
|
|
Work on Floor(s): SUB,CEL
|
| 06/24/2020 |
123554386 |
03 |
A2 |
P APPROVED |
08/24/2020 |
|
VENDITTI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 015,016,017,018
|
| 06/01/2020 |
123776967 |
02 |
A2 |
P APPROVED |
06/05/2020 |
|
LOGIUDIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017,018
|
| 04/08/2020 |
123534504 |
08 |
A1 |
P APPROVED |
05/20/2020 |
0059357 PE |
MAYBAUM |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,017,018,019,ROF
|
| 02/22/2020 |
123534504 |
07 |
A1 |
P APPROVED |
03/04/2020 |
|
BASLER |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, 003,ROF 014 thru 019
|
| 01/22/2020 |
123534504 |
06 |
A1 |
P APPROVED |
01/27/2020 |
0059357 PE |
MAYBAUM |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,017,018,019,ROF
|
| 12/18/2019 |
140881268 |
01 |
A3 |
X SIGNED OFF |
04/21/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. HVAC EQUIPMENT SH
|
|
Work on Floor(s): 017,018
|
| 12/05/2019 |
140818952 |
03 |
A3 |
P APPROVED |
12/06/2019 |
|
HERNANDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/25/2019 |
140878806 |
01 |
A3 |
X SIGNED OFF |
04/21/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY T
|
|
Work on Floor(s): 018
|
| 11/08/2019 |
140876746 |
01 |
A3 |
P APPROVED |
11/08/2019 |
0070576 PE |
SHOAF |
|
NOT APPLICABLE
|
|
FACADE SSP FILED IN CONJUNCTION WITH APPLICATION 123802484. LOGISTICS PLAN
|
|
Work on Floor(s): OSP
|
| 08/08/2019 |
123802484 |
01 |
A2 |
X SIGNED OFF |
06/30/2021 |
0082778 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
EXTERIOR WORK AS SHOWN ON PLANS.
|
|
Work on Floor(s): OSP 001 thru 017
|
| 08/05/2019 |
123534504 |
05 |
A1 |
P APPROVED |
08/26/2019 |
|
BASLER |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, 003,ROF 014 thru 019
|
| 07/26/2019 |
123799470 |
01 |
A2 |
X SIGNED OFF |
10/29/2020 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE DEMOLITION OF PARTITIONS AND FINISHES IN
|
|
Work on Floor(s): 012 thru 016
|
| 07/26/2019 |
123821463 |
01 |
A2 |
X SIGNED OFF |
06/07/2021 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE DEMOLITION OF PARTITIONS AND FINISHES IN
|
|
Work on Floor(s): 008 thru 011
|
| 07/19/2019 |
123880425 |
01 |
A2 |
X SIGNED OFF |
06/07/2021 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE DEMOLITION OF PARTITIONS AND FINISHES IN
|
|
Work on Floor(s): 004 thru 007
|
| 07/18/2019 |
123880434 |
01 |
A2 |
X SIGNED OFF |
09/15/2020 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE DEMOLITION OF PARTITIONS AND FINISHES IN
|
|
Work on Floor(s): 003
|
| 07/10/2019 |
123534504 |
04 |
A1 |
P APPROVED |
07/29/2019 |
0059357 PE |
MAYBAUM |
|
GRANTED 02/28/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,017,018,019,ROF
|
| 06/28/2019 |
123776967 |
01 |
A2 |
X SIGNED OFF |
10/02/2020 |
0076191 PE |
LOGIUDIC |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR THE INSTALLATION OF A SPRINKLER TEMP LOOP. (17TH FLOOR
|
|
Work on Floor(s): 017,018
|
| 06/25/2019 |
140856713 |
01 |
A3 |
X SIGNED OFF |
04/21/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY
|
|
Work on Floor(s): 017
|
| 06/07/2019 |
121617884 |
02 |
A3 |
D A/P ENTIRE |
06/10/2019 |
|
VENDITTI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 016 thru 019
|
| 06/05/2019 |
140818952 |
02 |
A3 |
P APPROVED |
06/13/2019 |
|
HERNANDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/28/2019 |
140840008 |
01 |
A3 |
P APPROVED |
03/28/2019 |
0087830 PE |
PUERTA |
|
NOT APPLICABLE
|
|
TENANT PROTECTION PLAN FILED IN CONJUNCTION WITH NEW YORK CITY DEPORTMENT
|
|
Work on Floor(s): ROF 001 thru 018
|
| 03/28/2019 |
123732880 |
01 |
A2 |
X SIGNED OFF |
08/19/2020 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK REQUIRED FOR REINFORCEMENT OF ELEVATOR HOIST AS SHOWN. NO
|
|
Work on Floor(s): 015,016,017
|
| 01/31/2019 |
123509453 |
01 |
A2 |
R PERMIT-ENTIRE |
06/20/2019 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/06/2020 GENERAL CONSTRUCTION TO INCLUDE DEMOLITION OF PAR
|
|
Work on Floor(s): SUB,CEL
|
| 01/31/2019 |
123509453 |
03 |
A2 |
R PERMIT-ENTIRE |
06/20/2019 |
0059357 PE |
MAYBAUM |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/06/2020 MECHANICAL AND PLUMBING FOR IN CONJUNCTION WITH I
|
|
Work on Floor(s): SUB,CEL
|
| 01/31/2019 |
123509453 |
02 |
A2 |
R PERMIT-ENTIRE |
05/30/2019 |
0074933 PE |
DESIMONE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/06/2020 STRUCTURAL WORK IN CONJUNCTION WITH INITIAL FILI
|
|
Work on Floor(s): SUB,CEL
|
| 12/17/2018 |
123554386 |
02 |
A2 |
X SIGNED OFF |
11/18/2020 |
0088933 PE |
VENDITTI |
|
NOT APPLICABLE
|
|
STANDPIPE WORK IN CONJUNCTION WITH ALT 1# 123534504.
|
|
Work on Floor(s): 015 thru 018
|
| 11/20/2018 |
123408758 |
01 |
A2 |
X SIGNED OFF |
07/27/2021 |
0088933 PE |
VENDITTI |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM, 3,15,16,17,18,RO
|
|
Work on Floor(s): ROF,003 015 thru 018
|
| 11/20/2018 |
123554386 |
01 |
A2 |
X SIGNED OFF |
11/18/2020 |
0088933 PE |
VENDITTI |
|
NOT APPLICABLE
|
|
MODIFICATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH ALT-1
|
|
Work on Floor(s): 015,016,017,018
|
| 11/20/2018 |
140818952 |
01 |
A3 |
X SIGNED OFF |
04/21/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SINGLE 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST INCLUDIN
|
|
Work on Floor(s): OSP
|
| 11/15/2018 |
123534504 |
01 |
A1 |
X SIGNED OFF |
03/22/2023 |
0030312 RA |
BASLER |
|
GRANTED 02/28/2019
|
|
APPLICATION FILED FOR ENLARGEMENT GENERAL RENOVATION OF EXISTING HOTEL. G
|
|
Work on Floor(s): 003,ROF 014 thru 018
|