 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/07/2019 |
140814705 |
02 |
A2 |
P APPROVED |
03/18/2019 |
|
LU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 12/20/2018 |
123156351 |
01 |
A2 |
X SIGNED OFF |
03/07/2019 |
0096103 PE |
LU |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION ON 4TH FLOOR. (APARTMENT #4D) CEILING, FLOORI
|
|
Work on Floor(s): 004
|
| 10/26/2018 |
140814705 |
01 |
A2 |
X SIGNED OFF |
03/18/2019 |
0096103 PE |
LU |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION ON 3RD FLOOR. (APARTMENT #3B) CEILING, FLOORI
|
|
Work on Floor(s): 003
|
| 11/26/2017 |
140719364 |
01 |
A2 |
X SIGNED OFF |
03/02/2018 |
0096103 PE |
LU |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR WORK APT#6D @ 6TH FLOOR . CEILING, FLOORING,PARTITION WO
|
|
Work on Floor(s): 006
|
| 05/14/2015 |
140347916 |
01 |
A2 |
R PERMIT-ENTIRE |
07/16/2015 |
0068287 PE |
CHAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 6TH FLOOR(APT#6A). PARTITION WALL AND GENERAL
|
|
Work on Floor(s): 006
|
| 05/12/2015 |
140346944 |
01 |
A2 |
H P/E IN PROCESS |
05/12/2015 |
0068287 PE |
CHAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/14/2015 INTERIOR RENOVATION AT 6TH FLOOR(APT#6A). PARTITI
|
|
Work on Floor(s): 6A
|
| 11/25/2013 |
140138143 |
01 |
A2 |
X SIGNED OFF |
01/15/2014 |
0068287 PE |
CHAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT PARTIAL 5TH FLOOR APT. #5C. FLOORING, CEILING, AND
|
|
Work on Floor(s): 005
|
| 06/16/2011 |
120724751 |
01 |
A2 |
X SIGNED OFF |
12/06/2011 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT PARTIAL 2ND FLOOR APT. #2D. FLOORING, CEILING, AND
|
|
Work on Floor(s): 002
|
| 11/18/2010 |
120164687 |
02 |
A2 |
P APPROVED |
12/21/2010 |
|
TAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 09/30/2010 |
120488524 |
01 |
A2 |
X SIGNED OFF |
12/10/2010 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT PARTIAL 6TH FLOOR APT. #6B. FLOORING, CEILING, AND
|
|
Work on Floor(s): 006
|
| 09/24/2009 |
120164687 |
01 |
A2 |
X SIGNED OFF |
12/23/2010 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT EXIST. 4TH FLOOR (APT #4A). CEILING, FLOOR
|
|
Work on Floor(s): 004
|
| 04/14/2008 |
110147252 |
01 |
A2 |
X SIGNED OFF |
06/22/2009 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT EXIST. 2ND FLOOR APT #2A. CEILING , FLOORI
|
|
Work on Floor(s): 2
|
| 05/14/2007 |
104737705 |
02 |
A2 |
P APPROVED |
05/18/2007 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED INTERIOR RENOVATION AT 5TH FLR. AP
|
|
Work on Floor(s): 005
|
| 04/17/2007 |
104737705 |
01 |
A2 |
X SIGNED OFF |
08/29/2007 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT 5TH FLR. APT. 5D ONLY. CEILING, FLOORING
|
|
Work on Floor(s): 005
|