| 10/22/2021 |
103645478 |
07 |
A2 |
P APPROVED |
10/22/2021 |
0091060 PE |
NGUYEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 005
|
| 03/17/2021 |
103648607 |
02 |
A2 |
P APPROVED |
03/17/2021 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/11/2020 |
103652174 |
02 |
A2 |
P APPROVED |
02/11/2020 |
|
SAKHAMUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/11/2019 |
103652174 |
01 |
A2 |
X SIGNED OFF |
04/24/2023 |
0097462 PE |
SAKHAMUR |
|
NOT APPLICABLE
|
|
FILLING FOR SUPPORT OF EXCAVATION TO SECURE THE WORK AREA AT PS 116M ASSOC
|
|
Work on Floor(s): OSP
|
| 09/11/2019 |
103652165 |
01 |
A3 |
X SIGNED OFF |
02/06/2023 |
0097462 PE |
SAKHAMUR |
|
NOT APPLICABLE
|
|
FILING FOR TEMPORARY CONSTRUCTION FENCE PERMIT ON BEHALF OF BUILDING OWNER
|
|
Work on Floor(s): OSP
|
| 02/06/2019 |
103651255 |
01 |
A2 |
X SIGNED OFF |
05/04/2023 |
0021391 RA |
BERGER |
|
NOT APPLICABLE
|
|
AREAWWAY WALL REPLACEMENT AND REPAIR.
|
|
Work on Floor(s): CEL,OSP
|
| 08/04/2017 |
104212585 |
01 |
A3 |
X SIGNED OFF |
12/15/2021 |
0029242 RA |
RYMAN |
|
NOT APPLICABLE
|
|
M116 - FIELD HEREWITH IS A FIRE PROTECTION PLAN
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 07/20/2017 |
104212567 |
01 |
A2 |
X SIGNED OFF |
12/15/2021 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
PS116M - INSTALLATION OF CARBON MONOXIDE DETECTION SYSTEM WITH CENTRAL OFF
|
|
Work on Floor(s): CEL,001
|
| 06/24/2016 |
103644781 |
02 |
A2 |
P APPROVED |
06/24/2016 |
|
DESROCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MODIFICATION TO EXISTING FIRE ALARM SYSTEM.
|
|
Work on Floor(s): 004
|
| 01/26/2016 |
103645478 |
06 |
A2 |
P APPROVED |
01/26/2016 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): OSP,CEL,001,ROF
|
| 01/21/2016 |
103645478 |
05 |
A2 |
P APPROVED |
01/21/2016 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): OSP,CEL,001,ROF
|
| 11/03/2015 |
103648607 |
01 |
A2 |
X SIGNED OFF |
12/15/2021 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REFILING OF DOB JOB NO. 103646690 TO INSTALL TEMPORARY METAL CHIMNEY AND
|
|
Work on Floor(s): OSP
|
| 09/20/2014 |
102275182 |
03 |
PA |
P APPROVED |
09/20/2014 |
0017944 RA |
RILEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/19/2014 |
103646869 |
01 |
A3 |
X SIGNED OFF |
09/13/2019 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
FILING APPLICATION ON CONTRACTOR'S BEHALF FOR 20 LF OF CONCRETE JERSEY BAR
|
|
Work on Floor(s): OSP
|
| 08/20/2014 |
103646690 |
01 |
A2 |
X SIGNED OFF |
12/06/2021 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY METAL CHIMNEY AND TEMPORARY FUEL STORAGE TANK FOR TEMPOR
|
|
Work on Floor(s): OSP
|
| 05/07/2014 |
103644754 |
04 |
A2 |
P APPROVED |
05/07/2014 |
|
RILEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ASSOCIATED REMOVALS AND REINSTALLATION OF C
|
|
Work on Floor(s): CEL,ROF
|
| 01/08/2014 |
103645478 |
01 |
A2 |
X SIGNED OFF |
03/15/2022 |
0091060 PE |
NGUYEN |
|
NOT APPLICABLE
|
|
P.S. 116 - M :REMOVE,REPLACE 2 BOILERS,BOILER & CHEMICAL FEED,ELECT.UNIT H
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 005
|
| 01/08/2014 |
103645478 |
04 |
A2 |
X SIGNED OFF |
03/15/2022 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
P.S.116-M:CAP,REMOVE EXIST.2 LP GAS SERVICE & ASSOCIATED PIPING,INSTALL NE
|
|
Work on Floor(s): OSP,CEL,001,ROF
|
| 01/08/2014 |
103645478 |
03 |
A2 |
X SIGNED OFF |
03/15/2022 |
0069970 PE |
GO |
|
NOT APPLICABLE
|
|
P.S.116-M:INSTALL REINFORCED CONCRETE PADS FOR EQUIPMENTS,INSTALL STEEL ST
|
|
Work on Floor(s): OSP,CEL,001,ROF
|
| 01/08/2014 |
103645478 |
02 |
A2 |
X SIGNED OFF |
03/15/2022 |
0022384 RA |
TEPLITSK |
|
NOT APPLICABLE
|
|
P.S.116-M : INSTALL CONSTRUCTION FENCES, REPLACE STEEL STAIRS, REPLACE EXI
|
|
Work on Floor(s): OSP,CEL
|
| 09/26/2013 |
103644781 |
01 |
A2 |
X SIGNED OFF |
06/19/2017 |
0065346 PE |
DESROCHE |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING FIRE ALARM SYSTEM.
|
|
Work on Floor(s): 004
|
| 09/25/2013 |
103644754 |
03 |
A2 |
X SIGNED OFF |
04/22/2020 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
DUNNAGE FOR NEW CONDENSING UNIT AT LOWER ROOF
|
|
Work on Floor(s): CEL,ROF
|
| 09/25/2013 |
103644754 |
02 |
A2 |
X SIGNED OFF |
04/22/2020 |
0065346 PE |
DESROCHE |
|
NOT APPLICABLE
|
|
NEW AIR CONDITIONING EQUIPMENT (CONDENSER AND COOLING COILS) FOR EXISTING
|
|
Work on Floor(s): CEL,ROF
|
| 09/25/2013 |
103644754 |
01 |
A2 |
X SIGNED OFF |
04/22/2020 |
0017944 RA |
RILEY |
|
NOT APPLICABLE
|
|
ASSOCIATED REMOVALS AND REINSTALLATION OF CEILING PANELS, LIGHTING AT EXIS
|
|
Work on Floor(s): CEL,ROF
|
| 07/12/2013 |
103640124 |
04 |
A2 |
P APPROVED |
07/12/2013 |
|
BUTTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/20/2012 |
103640124 |
03 |
A2 |
P APPROVED |
01/20/2012 |
|
BUTTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/16/2011 |
103640124 |
02 |
A2 |
P APPROVED |
09/16/2011 |
|
BUTTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 OT - PLAYGROUND REDEVELOPMENT: REPLACE PORT
|
|
Work on Floor(s): OSP
|
| 03/30/2011 |
103640124 |
01 |
A2 |
X SIGNED OFF |
07/22/2014 |
0010035 RA |
BUTTER |
|
NOT APPLICABLE
|
|
OT - PLAYGROUND REDEVELOPMENT: REPLACE PORTIONS OF PAVEMENT AND SAFETY
|
|
Work on Floor(s): OSP
|
| 03/03/2009 |
110465773 |
01 |
A2 |
J P/E DISAPPROVED |
03/03/2009 |
0011801 RA |
ROBINSON |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FILING FOR INSTALLATION OF CONDENSING UNITS FOR CAFETE
|
|
Work on Floor(s): ROF,CEL
|
| 01/21/2009 |
102275182 |
02 |
PA |
P APPROVED |
01/21/2009 |
|
MOZUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/04/2007 |
102416547 |
01 |
A2 |
X SIGNED OFF |
08/18/2011 |
0046092 PE |
GASSMAN |
|
NOT APPLICABLE
|
|
PS116 NEW FA FULLY SUPERVISED, MICROPROCESSOR BASED, MULTIPROCESSING SYS
|
|
Work on Floor(s): BAS 001 thru 005
|
| 05/02/2003 |
102275182 |
01 |
PA |
U COMPLETED |
02/23/2009 |
0017944 RA |
RILEY |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL
|
| 02/26/2003 |
101415577 |
01 |
A2 |
R PERMIT-ENTIRE |
02/26/2003 |
0579851 PE |
MALTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2007 P.S. 116M; PROPOSED INSTALLATION OF SMOKE DETECTI
|
|
Work on Floor(s): CEL 001 thru 005
|
| 07/05/2001 |
102500606 |
01 |
A3 |
R PERMIT-ENTIRE |
03/28/2003 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SCAFFOLD 24' LONG BY 120' HIGH DURING
|
|
Work on Floor(s): GRD
|
| 07/05/2001 |
102500599 |
01 |
A3 |
R PERMIT-ENTIRE |
03/28/2002 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 436' DURING FACADE REPAIR.
|
|
Work on Floor(s): GRD
|
| 04/23/2001 |
102534651 |
01 |
A3 |
R PERMIT-ENTIRE |
03/24/2003 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 515' DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|
| 04/09/2001 |
102524092 |
01 |
A3 |
R PERMIT-ENTIRE |
04/17/2001 |
|
BUTTNER |
|
NOT APPLICABLE
|
|
INSTALALTION OF A HEAVY DUTY SHED 42' DURING FACADE REPAIR. NO
|
|
Work on Floor(s): GRD
|
| 12/27/2000 |
102121491 |
01 |
A2 |
X SIGNED OFF |
01/14/2011 |
0011338 RA |
MONTOYA |
|
NOT APPLICABLE
|
|
PS116 EXTERIOR MODERNIZATION INCLUDING MASONRY REPAIRS, ROOF REPLACEMEN
|
|
Work on Floor(s): 001 thru 005
|
| 11/09/2000 |
101760952 |
01 |
A2 |
R PERMIT-ENTIRE |
11/09/2000 |
0578951 PE |
MALTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/05/2008 PS116 LEGALIZING THE INTERIOR FIREALARM SYSTEM IN
|
|
Work on Floor(s): CEL 001 thru 003
|
| 06/11/1999 |
102164925 |
01 |
A3 |
R PERMIT-ENTIRE |
06/16/1999 |
|
BUTTNER |
|
NOT APPLICABLE
|
|
INSTALLATIONOF A FHEAVY DUTY SHED 218' DURING EMERGENCY REPAIR. NO
|
|
Work on Floor(s): GRD
|