 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/30/2019 |
122426375 |
03 |
A2 |
P APPROVED |
01/02/2020 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 10/28/2019 |
123773103 |
02 |
A2 |
D A/P ENTIRE |
01/14/2021 |
|
BARAK |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/26/2021
|
|
Work on Floor(s): 002
|
| 09/24/2019 |
123773103 |
01 |
A2 |
P APPROVED |
09/27/2019 |
0038345 RA |
BARAK |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/26/2021 APPLICATION FILED FOR ROOF TERRACE CONSTRUCTION @
|
|
Work on Floor(s): 002
|
| 03/29/2019 |
123061328 |
10 |
A2 |
P APPROVED |
04/04/2019 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 02/21/2019 |
123061328 |
09 |
A2 |
P APPROVED |
02/25/2019 |
0063991 PE |
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 02/05/2019 |
123061328 |
08 |
A2 |
P APPROVED |
02/11/2019 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 02/05/2019 |
123061328 |
07 |
A2 |
G PAA FEE DUE |
02/05/2019 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/05/2019
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 01/14/2019 |
123061328 |
06 |
A2 |
P APPROVED |
01/16/2019 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 07/24/2018 |
123061328 |
05 |
A2 |
P APPROVED |
08/06/2018 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF APT 1A, 1B,2A,2B, 3A
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 05/21/2018 |
123061328 |
04 |
A2 |
P APPROVED |
06/26/2018 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF APT 1A, 1B,2A,2B, 3A
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 07/25/2017 |
123061328 |
03 |
A2 |
P APPROVED |
07/27/2017 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF APT 1A, 1C, 2A,2B,2C
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 07/05/2017 |
123061328 |
02 |
A2 |
P APPROVED |
07/21/2017 |
|
TARANTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004
|
| 03/31/2017 |
123061328 |
01 |
A2 |
R PERMIT-ENTIRE |
04/04/2019 |
0063991 PE |
TARANTIN |
Y |
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT 1A, 1B,2A,2B, 3A, 4A, 4B, 5A, 5B. COMBINE APTS
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 12/08/2016 |
122426375 |
02 |
A2 |
P APPROVED |
12/13/2016 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/05/2015 |
122426375 |
01 |
A2 |
X SIGNED OFF |
11/12/2020 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER (NYC BOILER NO. MD41921-01).
|
|
Work on Floor(s): CEL
|
| 07/07/2010 |
120406300 |
01 |
A2 |
X SIGNED OFF |
03/09/2011 |
0026528 RA |
SHAH |
|
NOT APPLICABLE
|
|
CLOSET PARTITION CHANGES AND REPLACE OLD PLUMBING FIXTURES WITH NEW AS PER
|
|
Work on Floor(s): 001
|