 |  |  |  |  |  |  |  |  |  |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
03/26/2022 |
101259264 |
04 |
A2 |
P APPROVED |
03/29/2022 |
|
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1 thru 16
|
01/28/2022 |
101259264 |
03 |
A2 |
P APPROVED |
02/10/2022 |
|
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1 thru 16
|
01/28/2022 |
101223285 |
02 |
A2 |
P APPROVED |
03/11/2022 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,16
|
01/28/2022 |
100584315 |
02 |
A3 |
P APPROVED |
02/03/2022 |
|
COSTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
11/08/2021 |
101589309 |
02 |
A2 |
P APPROVED |
12/07/2021 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
08/04/2021 |
103565483 |
02 |
A3 |
P APPROVED |
08/12/2021 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
07/30/2020 |
140762360 |
03 |
A2 |
P APPROVED |
01/09/2021 |
|
MILLMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF
|
10/01/2019 |
140805608 |
02 |
A3 |
P APPROVED |
10/07/2019 |
|
O'CONNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
01/09/2019 |
140762360 |
02 |
A2 |
P APPROVED |
01/29/2019 |
|
MILLMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PHASE I, EXTERIOR REPAIRS AT REAR YARD FACA
|
|
Work on Floor(s): FAC,ROF
|
09/24/2018 |
140805608 |
01 |
A3 |
X SIGNED OFF |
12/14/2020 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
STORAGE OF EQUIPMENT, MATERIAL AND DEBRIS UP TO 300 PSF ON TOP OF HEAVY DU
|
|
Work on Floor(s): OSP
|
06/20/2018 |
140777274 |
01 |
A3 |
X SIGNED OFF |
04/19/2021 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION # 140762360
|
|
Work on Floor(s): OSP
|
05/04/2018 |
140762360 |
01 |
A2 |
X SIGNED OFF |
01/27/2021 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
PHASE I, EXTERIOR REPAIRS AT REAR YARD FACADE AS PER THE PLANS FILED.
|
|
Work on Floor(s): FAC,ROF
|
09/19/2017 |
123036641 |
01 |
A2 |
X SIGNED OFF |
11/09/2017 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING TO INSTALL HVAC UNITS AND CONDENSERS IN CELLAR
|
|
Work on Floor(s): CEL
|
09/15/2017 |
140695273 |
01 |
A2 |
D A/P ENTIRE |
09/15/2017 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/14/2017 HEREWITH FILING TO INSTALL HVAC UNITS AND CONDENSE
|
|
Work on Floor(s): CEL
|
09/15/2017 |
140695246 |
01 |
A2 |
D A/P ENTIRE |
09/15/2017 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/14/2017 HEREWITH FILING TO INSTALL HVAC UNITS AND CONDENSE
|
|
Work on Floor(s): CEL
|
01/24/2017 |
122900281 |
01 |
A2 |
X SIGNED OFF |
04/05/2018 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING LOBBY RENOVATION FOR FLOORS 02 THROUGH 16. INCLUDING NEW W
|
|
Work on Floor(s): 001 thru 016
|
11/28/2016 |
140579531 |
01 |
A2 |
D A/P ENTIRE |
11/28/2016 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/28/2016 HEREWITH FILING LOBBY RENOVATION FOR FLOORS 02 TH
|
|
Work on Floor(s): 001 thru 016
|
04/14/2016 |
122417401 |
02 |
A2 |
P APPROVED |
05/17/2016 |
|
COSENTIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
10/06/2015 |
122417401 |
01 |
A2 |
X SIGNED OFF |
12/06/2016 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING TO RENOVATION OF EXISTING ENTRY LOBBY. WORK TO INCLUDE:
|
|
Work on Floor(s): 001
|
08/27/2012 |
121355773 |
01 |
A2 |
X SIGNED OFF |
06/06/2013 |
0029282 RA |
COSENTIN |
|
NOT APPLICABLE
|
|
ALTERATION TYPE II FILED TO COMBINE APT. G2 & G3 INTO ONE APARTMENT. PLUMB
|
|
Work on Floor(s): 001
|
03/22/2012 |
121021955 |
01 |
A2 |
X SIGNED OFF |
10/10/2012 |
0013603 RA |
MEILUS |
|
NOT APPLICABLE
|
|
RENOVATION OF CHIROPRACTIC OFFICE INCLUDING PARTITION WORK AND MINOR VENT
|
|
Work on Floor(s): 1ST
|
07/16/2010 |
120095725 |
02 |
A2 |
D A/P ENTIRE |
12/07/2010 |
|
PETKANAS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/23/2010
|
|
Work on Floor(s): FAC
|
07/02/2009 |
120095725 |
01 |
A2 |
X SIGNED OFF |
12/30/2010 |
0081090 PE |
PETKANAS |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): FAC
|
05/11/2006 |
104428255 |
01 |
A2 |
X SIGNED OFF |
12/21/2010 |
0081090 PE |
PETKANAS |
|
NOT APPLICABLE
|
|
EXTERIOR MASONRY REPAIRS AS PER PLANS.NO SIDEWALK SHED IS NECESSARY
|
|
Work on Floor(s): FAC
|
06/01/2004 |
103794360 |
01 |
A2 |
X SIGNED OFF |
08/10/2005 |
0073602 PE |
Lau |
|
NOT APPLICABLE
|
|
Exterior repairs. Removal and replacement of parapets and balconies. No ch
|
|
Work on Floor(s): 001 thru 017
|
11/14/2003 |
103618131 |
01 |
A2 |
X SIGNED OFF |
06/15/2004 |
0073602 PE |
Lau |
|
NOT APPLICABLE
|
|
Exterior repairs. No change in use, occupancy, or egress.
|
|
Work on Floor(s): 001 thru 017
|
09/18/2003 |
103565483 |
01 |
A3 |
X SIGNED OFF |
08/19/2021 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE 24' DURING FACADE REPAIR.
|
|
Work on Floor(s): GRD
|
02/01/2000 |
102821582 |
01 |
A2 |
X SIGNED OFF |
06/11/2001 |
0012017 RA |
GILBRIDE |
|
NOT APPLICABLE
|
|
INTERIOR PARTITIONS, MECHANICAL DUCTWORK AND PLUMBING WORK ON
|
|
Work on Floor(s): 001
|
10/16/1997 |
101589309 |
01 |
A2 |
X SIGNED OFF |
01/04/2022 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REMOVE EXISTING 5,000 GALLON WRAPPED TANK AND REPLACE ONE NEW 5,000
|
|
Work on Floor(s): CEL
|
07/17/1997 |
101545749 |
01 |
A2 |
P APPROVED |
07/21/1997 |
0017461 RA |
ADAMS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/17/2021 FILING PLUMBING WORK AS PER PLANS FILING HEREWITH
|
|
Work on Floor(s): 001
|
02/14/1997 |
101490129 |
01 |
A2 |
X SIGNED OFF |
11/06/1997 |
0017461 RA |
ADAMS |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF NON-BEARING PARTITIONS O N THE FIRST FLOOR. NO CHANGE IN
|
|
Work on Floor(s): 1
|
04/24/1996 |
101259264 |
02 |
A2 |
P APPROVED |
05/08/1996 |
0017461 RA |
ADAMS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1 thru 16
|
03/19/1996 |
101259264 |
01 |
A2 |
X SIGNED OFF |
05/05/2022 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS IN SELECTED APARTMENTS TO REPLACE THE
|
|
Work on Floor(s): 1 thru 16
|
02/08/1996 |
101245984 |
01 |
A2 |
X SIGNED OFF |
02/23/2001 |
0018183 RA |
BRICE |
|
NOT APPLICABLE
|
|
REPLACE BRICKS FROM GRADE TO ROOF AT THE BUILDING'S NORTHEAST AND SOUTH-
|
|
Work on Floor(s): FAC
|
01/29/1996 |
101223285 |
01 |
A2 |
R PERMIT-ENTIRE |
08/07/1996 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
FILING HERE WITH PLUMBING DRAWINGS FOR PROPOSED DOMESTIC HOT AND COLD
|
|
Work on Floor(s): BAS,16
|
09/18/1995 |
101076666 |
01 |
A3 |
X SIGNED OFF |
08/03/2001 |
|
O'FARREL |
|
NOT APPLICABLE
|
|
INSTALL SHED 125' ON PARK AVE DURING FAC ADE REPAIR. NO CHANGE TO USE EG
|
|
Work on Floor(s): GRD
|
03/05/1993 |
100584315 |
01 |
A3 |
X SIGNED OFF |
02/07/2022 |
0016907 RA |
COSTA |
|
NOT APPLICABLE
|
|
AS PER LL9/74,REMOVE THE HOSES FROM THE HOSE RACKS & INSTALL NEW HOSE &
|
|
Work on Floor(s): 1
|
|
101996084 |
01 |
A2 |
B A/P UNPAID |
02/24/1999 |
|
|
|
NOT APPLICABLE
|