 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/10/2020 |
140989287 |
01 |
A2 |
X SIGNED OFF |
03/02/2022 |
0001953 RA |
GOLDBLUM |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF EXISTING ACCESSORY FACULTY OFFICES AND
|
|
Work on Floor(s): 008
|
| 09/10/2018 |
110206081 |
02 |
A1 |
P APPROVED |
09/11/2018 |
|
CAMINITI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 4
|
| 12/07/2017 |
103477284 |
02 |
PA |
P APPROVED |
09/11/2018 |
|
YAKAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/14/2017 |
140647879 |
02 |
A3 |
P APPROVED |
09/15/2017 |
|
SIQECA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 018
|
| 06/30/2017 |
140663315 |
01 |
A3 |
X SIGNED OFF |
06/27/2018 |
0080263 PE |
SAVALIA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS
|
|
Work on Floor(s): FAC
|
| 06/01/2017 |
140650409 |
01 |
A3 |
P APPROVED |
06/05/2017 |
0080263 PE |
SAVALIA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/12/2018 "FACADE SSP FILED IN CONJUNCTION WITH APPLICATION
|
|
Work on Floor(s): 001 thru 018
|
| 05/31/2017 |
140647879 |
01 |
A3 |
X SIGNED OFF |
06/01/2018 |
0090354 PE |
SIQECA |
|
NOT APPLICABLE
|
|
REPAIR OF PROPERTY EXTERIOR FACADE.
|
|
Work on Floor(s): 001 thru 018
|
| 02/28/2017 |
140610934 |
01 |
A3 |
X SIGNED OFF |
06/05/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 06/05/2013 |
121641946 |
01 |
A2 |
X SIGNED OFF |
06/21/2016 |
0038964 PE |
GREEN |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): 012,013,016,021
|
| 04/26/2013 |
121602783 |
01 |
A3 |
X SIGNED OFF |
04/21/2017 |
0079152 PE |
SYDORUK |
|
NOT APPLICABLE
|
|
ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING. NO CHANGE IN USE, EGRESS
|
|
Work on Floor(s): 001
|
| 02/06/2013 |
121526081 |
01 |
A2 |
P APPROVED |
02/06/2013 |
0028990 RA |
UYO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/11/2017 INSTALLATION OF A WLL MOUNTED SPLIT AC UNIT FOR A
|
|
Work on Floor(s): 012
|
| 02/06/2013 |
121526072 |
01 |
A2 |
X SIGNED OFF |
04/09/2013 |
0028990 RA |
UYO |
|
NOT APPLICABLE
|
|
INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PE
|
|
Work on Floor(s): 012
|
| 02/06/2013 |
121527197 |
01 |
A2 |
X SIGNED OFF |
09/23/2013 |
0028990 RA |
UYO |
|
NOT APPLICABLE
|
|
MODIFICATION OF CLASS E FIRE ALARM SYSTEM
|
|
Work on Floor(s): 012
|
| 06/09/2011 |
120705013 |
02 |
A2 |
X SIGNED OFF |
06/09/2017 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR PLUMBING AND MECHANICAL WORK AS PER PLANS. NO CHANGE I
|
|
Work on Floor(s): 5TH
|
| 05/26/2011 |
120702249 |
02 |
A2 |
R PERMIT-ENTIRE |
06/17/2011 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR PLUMBING AND MECHANICAL WORK AS PER PLANS. NO CHANGE I
|
|
Work on Floor(s): 5TH
|
| 05/26/2011 |
120705013 |
01 |
A2 |
X SIGNED OFF |
06/09/2017 |
0021668 RA |
MICHAEL |
|
NOT APPLICABLE
|
|
HEREWITH FILLING THE PARTIAL INTERIOR RENOVATION AT THE LOCATION 215 LEXIN
|
|
Work on Floor(s): 5TH
|
| 05/26/2011 |
120700884 |
01 |
A2 |
X SIGNED OFF |
11/14/2012 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR A MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM AS PE
|
|
Work on Floor(s): 5TH
|
| 05/26/2011 |
120702249 |
01 |
A2 |
R PERMIT-ENTIRE |
06/17/2011 |
0021668 RA |
WYETZNER |
|
NOT APPLICABLE
|
|
HEREWITH FILLING THE PARTIAL INTERIOR RENOVATION AT THE LOCATION 215 LEXIN
|
|
Work on Floor(s): 5TH
|
| 04/22/2011 |
120647906 |
02 |
A2 |
P APPROVED |
04/22/2011 |
|
BURKE-VI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 5TH
|
| 04/01/2011 |
120647906 |
01 |
A2 |
X SIGNED OFF |
04/21/2017 |
0018200 RA |
BURKE-VI |
|
NOT APPLICABLE
|
|
HEREWITH FILING DEMOLITION OF NON LOAD BEARING PARTITIONS FOR INTERIOR
|
|
Work on Floor(s): 5TH
|
| 10/19/2010 |
120482511 |
01 |
A2 |
X SIGNED OFF |
04/21/2017 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
HEREWITH FILING MECHANICAL DUCT WORK AS PER PLANS FILED HEREWITH. NO CHAN
|
|
Work on Floor(s): 006
|
| 10/08/2010 |
120491002 |
01 |
A2 |
X SIGNED OFF |
12/04/2012 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
HEREWITH FILING MODIFICATION TO EXISTING FIRE ALARM SYSTEM - YESHIVA UNIVE
|
|
Work on Floor(s): 006
|
| 06/28/2010 |
120394554 |
01 |
A2 |
X SIGNED OFF |
11/18/2010 |
0066773 PE |
MAZOR |
|
NOT APPLICABLE
|
|
FACADE REPAIR
|
|
Work on Floor(s): FAC
|
| 06/17/2010 |
120208756 |
02 |
A3 |
P APPROVED |
06/18/2010 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 272 LF OF HEAVY DUTY SIDEWA
|
|
Work on Floor(s): OSP
|
| 04/08/2010 |
120315480 |
01 |
A2 |
X SIGNED OFF |
07/30/2010 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW HVAC SYSTEM FOR 6TH FLOOR IT ROOM. NO CHANGE TO USE EG
|
|
Work on Floor(s): 006
|
| 01/14/2010 |
120245984 |
01 |
A2 |
X SIGNED OFF |
04/21/2017 |
0012325 RA |
SEGAL |
|
NOT APPLICABLE
|
|
HEREWITH FILING MINOR DEMOLITION OF INTERIOR PARTITIONS IN CONJUNCTION WIT
|
|
Work on Floor(s): 006
|
| 12/21/2009 |
120227897 |
02 |
A2 |
X SIGNED OFF |
08/05/2010 |
0073054 PE |
BOSCO |
|
NOT APPLICABLE
|
|
HEREWITH FILING MECHANICAL APPLICATION OF AN INTERIOR RENOVATION TO THE SI
|
|
Work on Floor(s): 006
|
| 12/21/2009 |
120227897 |
01 |
A2 |
X SIGNED OFF |
08/05/2010 |
0012325 RA |
SEGAL |
|
NOT APPLICABLE
|
|
HEREWITH FILING AN INTERIOR RENOVATION TO THE SIXTH FLOOR'S NORTHEAST CORN
|
|
Work on Floor(s): 006
|
| 11/23/2009 |
120208756 |
01 |
A3 |
X SIGNED OFF |
05/02/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 272 LF OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION
|
|
Work on Floor(s): OSP
|
| 09/24/2009 |
120163982 |
01 |
A2 |
X SIGNED OFF |
09/12/2012 |
0054147 PE |
ESTIN |
|
NOT APPLICABLE
|
|
REPLACEMENT OF FIRE COMMAND STATION AS PER SUBMITTED DRAWINGS NO CHANGE IN
|
|
Work on Floor(s): 001
|
| 06/30/2009 |
120093139 |
01 |
A2 |
X SIGNED OFF |
07/26/2011 |
0012325 RA |
SEGAL |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INTERIOR RENOVATION TO THE 6TH FLOOR AND TO CHANGE SOM
|
|
Work on Floor(s): 004,005,006
|
| 06/18/2008 |
110206081 |
01 |
A1 |
X SIGNED OFF |
09/19/2018 |
0012462 RA |
CAMINITI |
|
NOT APPLICABLE
|
|
HEREWITH FILING ALTERATION TYPE I TO CHANGE USE OF 4TH FLOOR FROM "OFFICES
|
|
Work on Floor(s): 4
|
| 05/12/2008 |
110168737 |
01 |
A2 |
X SIGNED OFF |
09/05/2008 |
0012325 RA |
SEGAL |
|
NOT APPLICABLE
|
|
HEREWITH FILING INTERIOR RENOVATION OF 4TH FLOOR. DEMOLISH AND INSTALL NE
|
|
Work on Floor(s): 004
|
| 03/06/2008 |
110107287 |
01 |
A2 |
X SIGNED OFF |
04/20/2010 |
0024921 RA |
SNYDER |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELAT
|
|
Work on Floor(s): 013,014
|
| 02/20/2007 |
104452183 |
01 |
A2 |
X SIGNED OFF |
08/10/2010 |
0054147 PE |
ESTIN |
|
NOT APPLICABLE
|
|
ADDITIONS TO EXISTING FIRE ALARM AS PERSUBMITTED DRAWINGS NO CHANGE IN
|
|
Work on Floor(s): 012
|
| 09/18/2006 |
104481428 |
02 |
A2 |
P APPROVED |
09/22/2006 |
0052592 PE |
KAUFMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/09/2006 |
104514367 |
01 |
A2 |
X SIGNED OFF |
07/08/2010 |
0080457 PE |
Wladyka |
|
NOT APPLICABLE
|
|
Addition of HVAC unit for printer room
|
|
Work on Floor(s): CEL
|
| 06/30/2006 |
104481428 |
01 |
A2 |
X SIGNED OFF |
06/18/2010 |
0052592 PE |
KAUFMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF BACKFLOW PREVENTORDEVICES AT EXISTING WATER
|
|
Work on Floor(s): CEL
|
| 06/12/2006 |
104451246 |
01 |
A2 |
X SIGNED OFF |
03/02/2007 |
0066773 PE |
MAZOR |
|
NOT APPLICABLE
|
|
FACADE REPAIRNO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): ROF 001 thru 018
|
| 06/12/2006 |
104275222 |
02 |
SG |
P APPROVED |
06/28/2006 |
0059161 PE |
Lewis |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|