| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/21/2023 |
123444978 |
07 |
A1 |
P APPROVED |
03/23/2023 |
|
CETRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 006
|
| 10/12/2022 |
123444978 |
06 |
A1 |
P APPROVED |
10/20/2022 |
|
CETRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 006
|
| 02/12/2020 |
123547322 |
06 |
A2 |
P APPROVED |
02/13/2020 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 006
|
| 12/03/2019 |
123547322 |
05 |
A2 |
P APPROVED |
12/05/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 006
|
| 11/19/2019 |
123548651 |
02 |
A2 |
P APPROVED |
05/21/2020 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT 001 thru 006
|
| 09/03/2019 |
123444978 |
05 |
A1 |
P APPROVED |
11/18/2019 |
|
CETRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 006
|
| 08/12/2019 |
123426499 |
05 |
A2 |
P APPROVED |
10/07/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 08/12/2019 |
123547322 |
04 |
A2 |
P APPROVED |
11/12/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 006
|
| 08/12/2019 |
123444978 |
04 |
A1 |
P APPROVED |
12/02/2019 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 05/23/2019 |
140850149 |
01 |
A2 |
X SIGNED OFF |
06/01/2020 |
0053541 PE |
HAHN |
|
NOT APPLICABLE
|
|
FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION
|
|
Work on Floor(s): CEL,002
|
| 05/02/2019 |
123426499 |
04 |
A2 |
P APPROVED |
05/17/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 12/20/2018 |
123154843 |
01 |
A2 |
X SIGNED OFF |
11/18/2019 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
PROPOSE TO INSTALL NEW BOILER AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHA
|
|
Work on Floor(s): CEL
|
| 09/20/2018 |
123547322 |
03 |
A2 |
X SIGNED OFF |
07/09/2020 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS O
|
|
Work on Floor(s): CEL 001 thru 006
|
| 09/20/2018 |
123547322 |
02 |
A2 |
X SIGNED OFF |
07/09/2020 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUCTWORK.INSTALLATION OF FIXTURES AND PIPING AS SHOWN ON
|
|
Work on Floor(s): CEL 001 thru 006
|
| 09/20/2018 |
123547322 |
01 |
A2 |
X SIGNED OFF |
07/09/2020 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS INCLUSIVE OF INSTALLATION OF PARTITIONS, CEILINGS, DO
|
|
Work on Floor(s): CEL 001 thru 006
|
| 08/27/2018 |
122451890 |
02 |
A2 |
P APPROVED |
07/26/2019 |
|
VARGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MANUAL/AUTOMATIC SMOKE/HEAT/CO DETECTION SP
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 006
|
| 08/27/2018 |
123548651 |
01 |
A2 |
X SIGNED OFF |
09/18/2020 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HERE
|
|
Work on Floor(s): CEL,ATT 001 thru 006
|
| 08/16/2018 |
123426480 |
03 |
A2 |
P APPROVED |
01/23/2019 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 DEMOLISH INTERIOR PARTITIONS, CEILINGS, FLO
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/18/2018 |
123550745 |
01 |
A2 |
X SIGNED OFF |
11/20/2019 |
0084628 PE |
ALLEN |
|
NOT APPLICABLE
|
|
PROPOSE TO INSTALL MOCK UP STRUCTURE AS SHOWN ON DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): ROF
|
| 04/17/2018 |
123444978 |
03 |
A1 |
R PERMIT-ENTIRE |
03/26/2019 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALL DUCTWORK.INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/17/2018 |
123444978 |
02 |
A1 |
R PERMIT-ENTIRE |
11/29/2018 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): CEL 001 thru 006
|
| 04/04/2018 |
123426499 |
03 |
A2 |
X SIGNED OFF |
09/18/2020 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK INCLUSIVE OF FRAMING AS SHOWN ON DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): CEL 001 thru 006
|
| 04/04/2018 |
123426499 |
02 |
A2 |
X SIGNED OFF |
09/18/2020 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUCTWORK. INSTALLATION OF PLUMBING FIXTURES AND PIPING. NO
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/04/2018 |
123426499 |
01 |
A2 |
X SIGNED OFF |
09/18/2020 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF PARTITIONS, CEILINGS AND DOORS. NO CHANGE TO USE, EGRESS O
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/04/2018 |
123426480 |
02 |
A2 |
X SIGNED OFF |
11/22/2019 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
REMOVE EXISTING DUCTWORK AND DIFFUSERS. REMOVE EXISTING PLUMBING FIXTURES
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/04/2018 |
123426480 |
01 |
A2 |
X SIGNED OFF |
11/22/2019 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
DEMOLISH INTERIOR PARTITIONS, CEILINGS, FLOORS & DOORS AS SHOWN ON DRAWING
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 03/30/2018 |
123444978 |
01 |
A1 |
R PERMIT-ENTIRE |
03/26/2019 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
PROPOSE TO CHANGE USE AND OCCUPANCY FROM OFFICES TO RETAIL,GALLERY AND
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 006
|
| 12/05/2017 |
123142688 |
01 |
A2 |
X SIGNED OFF |
08/13/2018 |
0052081 PE |
ZINGHER |
|
NOT APPLICABLE
|
|
PROPOSE TO REPLACE EXISTING LIFT IN KIND AS SHOWN ON DRAWINGS FILED HEREWI
|
|
Work on Floor(s): 001
|
| 10/17/2017 |
122380119 |
05 |
A1 |
P APPROVED |
10/19/2017 |
|
SHANNON |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 07/02/2026 PROPOSE TO CHANGE USE ON CELLAR, 1ST & 2ND FLOORS
|
|
Work on Floor(s): CEL,001,002
|
| 09/13/2017 |
122970268 |
02 |
A2 |
P APPROVED |
09/19/2017 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/01/2017 |
122976262 |
04 |
A2 |
P APPROVED |
09/11/2017 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 07/14/2017 |
122976262 |
03 |
A2 |
P APPROVED |
07/28/2017 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/09/2017 |
140639600 |
01 |
A3 |
X SIGNED OFF |
05/23/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 01/17/2017 |
122963739 |
02 |
A2 |
X SIGNED OFF |
12/28/2017 |
0915191 PE |
REDMOND |
|
NOT APPLICABLE
|
|
INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNIT AS SHOWN ON DRAWINGS F
|
|
Work on Floor(s): CEL
|
| 01/17/2017 |
122963739 |
01 |
A2 |
X SIGNED OFF |
12/28/2017 |
0016198 RA |
MOUDIS |
|
NOT APPLICABLE
|
|
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON
|
|
Work on Floor(s): CEL
|
| 01/11/2017 |
122976262 |
02 |
A2 |
P APPROVED |
01/13/2017 |
|
REDMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/20/2016 |
122976262 |
01 |
A2 |
X SIGNED OFF |
12/20/2017 |
0915191 PE |
REDMOND |
|
NOT APPLICABLE
|
|
REMOVE, REPLACE AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SH
|
|
Work on Floor(s): CEL
|
| 12/13/2016 |
122969653 |
01 |
A2 |
J P/E DISAPPROVED |
05/30/2017 |
0915191 PE |
REDMOND |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/25/2017 MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM A
|
|
Work on Floor(s): CEL
|
| 12/13/2016 |
122970268 |
01 |
A2 |
X SIGNED OFF |
12/11/2017 |
0915191 PE |
REDMOND |
|
NOT APPLICABLE
|
|
INSTALL STANDPIPE FIXTURES AND PIPING . REMOVE AND INSTALL NEW SPRINKLER H
|
|
Work on Floor(s): CEL
|
| 12/13/2016 |
122970464 |
01 |
A2 |
X SIGNED OFF |
07/25/2018 |
0915191 PE |
REDMOND |
|
NOT APPLICABLE
|
|
INSTALL BOILERS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): CEL
|