| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/15/2017 |
140695086 |
01 |
A3 |
X SIGNED OFF |
12/06/2018 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL COMPL
|
|
Work on Floor(s): OSP
|
| 09/12/2017 |
140693499 |
01 |
A3 |
R PERMIT-ENTIRE |
09/13/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 11/12/2015 |
122609622 |
01 |
A2 |
X SIGNED OFF |
01/11/2017 |
0045101 PE |
COPELAND |
|
NOT APPLICABLE
|
|
NEW BACK FLOW PREVENTER WITH ASSOCIATED VALVES AND PIPING AS SHOWN ON PLAN
|
|
Work on Floor(s): CEL
|
| 11/19/2014 |
122200536 |
01 |
A2 |
R PERMIT-ENTIRE |
11/24/2014 |
0028264 RA |
HILL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF LOBBY TO INCLUDE A NEW FRONT ENTRANCE AS SHOWN ON P
|
|
Work on Floor(s): 001
|
| 05/02/2007 |
104753081 |
01 |
A3 |
X SIGNED OFF |
11/16/2009 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 170 LINEAR FEET BY 80 FEET HIGH TUBULAR STEEL SCAFFOLD
|
|
Work on Floor(s): 001
|
| 05/02/2007 |
104753072 |
01 |
A3 |
X SIGNED OFF |
11/16/2009 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 85 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED,PER DRAWINGS,
|
|
Work on Floor(s): 001
|
| 04/05/2007 |
104723809 |
01 |
A2 |
X SIGNED OFF |
04/11/2008 |
0026022 RA |
BERGER |
|
NOT APPLICABLE
|
|
HEREBY FILING FACADE REPAIRS AT NORTH AND SOUTH ELEVATIONS INCLUDING FACEB
|
|
Work on Floor(s): 001 thru 006
|