FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
12/08/2016 |
120296928 |
11 |
A1 |
P APPROVED |
12/28/2016 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,MEZ,SUB 001 thru 004
|
10/23/2015 |
120296928 |
10 |
A1 |
P APPROVED |
11/23/2015 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,MEZ,SUB 001 thru 004
|
08/25/2015 |
120296928 |
09 |
A1 |
P APPROVED |
08/31/2015 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
06/02/2015 |
140355684 |
01 |
A3 |
X SIGNED OFF |
09/02/2016 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
06/02/2015 |
140355675 |
01 |
A3 |
X SIGNED OFF |
09/02/2016 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
05/21/2015 |
120296928 |
08 |
A1 |
P APPROVED |
05/26/2015 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
05/16/2015 |
120570195 |
03 |
A2 |
P APPROVED |
05/20/2015 |
|
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,SUB 001 thru 004
|
01/16/2015 |
120296928 |
07 |
A1 |
P APPROVED |
01/22/2015 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
01/12/2015 |
140299763 |
01 |
A3 |
X SIGNED OFF |
09/16/2015 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLDING (STAIR TOWER) ON THE BACK OF THE BLDG AS
|
|
Work on Floor(s): GRD
|
12/04/2014 |
120570195 |
02 |
A2 |
P APPROVED |
01/12/2015 |
|
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,SUB 001 thru 004
|
11/13/2014 |
120296928 |
06 |
A1 |
P APPROVED |
11/21/2014 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
08/20/2014 |
120651810 |
02 |
A3 |
P APPROVED |
08/22/2014 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
10/31/2013 |
121829646 |
01 |
A3 |
X SIGNED OFF |
10/18/2016 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
ERECT TEMPORARY PIPE SCAFFOLD AS PER PLANS, WORK SHALL COMPLY WITH 2008 BU
|
|
Work on Floor(s): OSP
|
10/02/2013 |
140120624 |
01 |
A3 |
X SIGNED OFF |
03/12/2014 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
07/17/2013 |
121584945 |
01 |
A3 |
X SIGNED OFF |
12/19/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 40 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
05/16/2013 |
120296928 |
05 |
A1 |
P APPROVED |
05/29/2013 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
12/07/2012 |
121453872 |
01 |
A3 |
P APPROVED |
12/07/2012 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/24/2016 INSTALL TEMPORARY HANGING PLATFORM (FROM 1ST FLOO
|
|
Work on Floor(s): BAS,001
|
08/17/2012 |
121158898 |
02 |
A3 |
P APPROVED |
08/20/2012 |
|
MCERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
07/19/2012 |
121158898 |
01 |
A3 |
X SIGNED OFF |
06/09/2015 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY SCAFFOLDING AT REAR OF BUILDING. NO CHANGE TO USE, EGRES
|
|
Work on Floor(s): OSP
|
04/05/2011 |
120651810 |
01 |
A3 |
X SIGNED OFF |
09/09/2015 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLYWOOD FENCE AS PER PLAN FOR NEW BUILDING AT 23 GRAMERCY
|
|
Work on Floor(s): OSP
|
01/14/2011 |
120570195 |
01 |
A2 |
X SIGNED OFF |
07/11/2016 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER SYSTEM THROUGHOUT WITH NEW SPRINKLER WATER SERVICE. NO C
|
|
Work on Floor(s): CEL,BAS,ROF,SUB 001 thru 004
|
12/13/2010 |
120555880 |
01 |
A3 |
X SIGNED OFF |
03/22/2011 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS AT REAR OF BUILDING. SCAFFOLD SHA
|
|
Work on Floor(s): OSP
|
10/15/2010 |
120500635 |
01 |
A2 |
X SIGNED OFF |
06/23/2016 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
SUBMIT PARTIAL DEMOLITION PLANS SHOWING TEMPORARY SHORING. NO CHANGE TO US
|
|
Work on Floor(s): BAS,ROF,CEL,SUB 001 thru 004
|
08/05/2010 |
120296928 |
04 |
A1 |
X SIGNED OFF |
05/15/2017 |
0060149 PE |
BECHT |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK PER PLANS THROUGHOUT THE BUILDING.
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
08/05/2010 |
120296928 |
03 |
A1 |
X SIGNED OFF |
05/15/2017 |
0081283 PE |
VOLPE |
|
NOT APPLICABLE
|
|
UNDERPINNING AND SHEETING DESIGN RELATED TO RENOVATION AND CONVERSION OF T
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
07/22/2010 |
120296928 |
02 |
A1 |
X SIGNED OFF |
05/15/2017 |
0062869 PE |
DALLAND |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK RELATED TO THE RENOVATION AND CONVERSION THROUGHOUT THE
|
|
Work on Floor(s): BAS,CEL,MEZ,ROF,SUB 001 thru 004
|
03/23/2010 |
120296928 |
01 |
A1 |
X SIGNED OFF |
05/15/2017 |
0019949 RA |
HARRIS |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING OFFICE BUILDING AND RESTORATION THROUGHOUT TO CONVE
|
|
Work on Floor(s): CEL,BAS,ROF,MEZ,SUB 001 thru 004
|
04/24/2008 |
110192130 |
01 |
A2 |
X SIGNED OFF |
11/09/2016 |
0019949 RA |
HARRIS |
|
NOT APPLICABLE
|
|
MINOR INTERIOR PARTITION AND PLUMBING REMOVAL AS PER PLAN. THERE IS NO CH
|
|
Work on Floor(s): 1, 2, 3, 4
|
11/05/1999 |
102670780 |
01 |
A2 |
P APPROVED |
01/06/2000 |
0028283 PE |
HILL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/01/2016 REPLACEMENT OF 7 1/2 AIR CONDITIONING UN IT WITH
|
|
Work on Floor(s): ROF
|
06/01/1994 |
100821817 |
01 |
A2 |
X SIGNED OFF |
02/12/2016 |
0045488 PE |
GRYNBAL |
|
NOT APPLICABLE
|
|
REPLACE GAS FIRED BOILER WITH NEW GAS BOILER & INTEGRAL BURNER. INSTAL
|
|
Work on Floor(s): CEL
|