| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
09/17/2018 |
140803646 |
PR |
I LAA SIGNED OFF |
11/26/2018 |
MP 001638 |
MEIMAROG |
|
IN APARTMENT 16E ON THE 16TH FLOOR WE WILL CAP/REMOVE ONE STOVE. ADDITIONA
|
|
Work on Floor(s): 016
|
06/13/2018 |
140774883 |
PR |
E LAA FILED |
06/13/2018 |
MP 001399 |
JARKOW |
|
IN APT #11B ON THE 11TH FLOOR REPLACE TO EXISTING ROUGHING (1)KITCHEN SINK
|
|
Work on Floor(s): 011
|
02/09/2018 |
140738879 |
PR |
I LAA SIGNED OFF |
02/22/2018 |
MP 002298 |
AIELLO |
|
IN APT 12K ON THE 12TH FLOOR REPLACE (1)TOILET, (1)FLUSHOMETER, (1)VANITY
|
|
Work on Floor(s): 012
|
09/05/2017 |
122592051 |
PR |
E LAA FILED |
09/08/2017 |
OBI 001509 |
BENDJOUY |
|
EWN14057 EMERGENCY INSTALLATION OF TEMPORARY #2 OIL, 1500 GAL MOBILE OIL T
|
|
Work on Floor(s): OSP
|
05/20/2017 |
140645675 |
PR |
E LAA FILED |
05/20/2017 |
MP 002213 |
SMITH |
|
JOB WITHDRAWN 05 24 2019
|
|
Work on Floor(s): 017
|
05/04/2017 |
122328105 |
PR |
I LAA SIGNED OFF |
01/24/2018 |
OBI 001509 |
BENDJOUY |
|
EWN#13411 EMERGENCY INSTALLATION OF TEMPORARY MOBILE BOILER- 1 CLEAVERBROO
|
|
Work on Floor(s): OSP
|
04/04/2017 |
140625722 |
PR |
I LAA SIGNED OFF |
04/11/2017 |
MP 001354 |
QUATTLAN |
|
IN CELLAR REPLACE APPROXIMATELY 20 FEET OF 6" SANITARY BUILDING DRAIN PIPI
|
|
Work on Floor(s): CEL
|
09/11/2014 |
140252492 |
PR |
I LAA SIGNED OFF |
09/25/2014 |
MP 001671 |
TROMBETT |
|
IN APARTMENT 8M ON THE 8TH FLOOR REPLACE 1 TOILET, 1 SINK AND 1 TUB ALL ON
|
|
Work on Floor(s): 8TH
|
11/15/2013 |
140135609 |
PR |
I LAA SIGNED OFF |
03/15/2019 |
MP 001983 |
LEWIS |
|
IN APT 7E ON THE 7TH FLOOR REPLACE ON EXISTING ROUGHING (1) TUB, (1) TOILE
|
|
Work on Floor(s): 007
|
05/20/2013 |
140080631 |
PR |
I LAA SIGNED OFF |
11/01/2013 |
MP 001354 |
QUATTLAN |
|
INSTALL (1) 6" WILKINS 475 IN CELLAR PUMP ROOM MEA# 468-99-M & (1) 4" WIL
|
|
Work on Floor(s): CEL
|
06/16/2010 |
110512507 |
PR |
E LAA FILED |
06/28/2010 |
MP 000678 |
RUDERMAN |
|
IN APT 4M ON 4FL REPLACE TUB W/SHOWER.
|
|
Work on Floor(s): 004
|
05/10/2008 |
103883754 |
PR |
I LAA SIGNED OFF |
10/09/2008 |
MP 001947 |
CURATOLA |
|
REPLACE(1)TOILET, BASIN. REMOVE TUB & INSTALL SHOWER.EXP. ALSO
|
|
Work on Floor(s): 017
|
10/14/2003 |
102303124 |
PR |
I LAA SIGNED OFF |
12/03/2003 |
MP 001556 |
MARK |
|
REPLACEMENT EXISTING BATHTUB IN EXISTING ROUGHING IN 5TH FLOOR,APT 5J
|
|
Work on Floor(s): 005
|
09/19/2003 |
102301901 |
PR |
I LAA SIGNED OFF |
08/24/2022 |
MP 000620 |
KRAUS |
|
ALL THE FOLLOWING WORK IS TO BE DONE IN APT 15A MSTR BATH ROUGHING FOR BOT
|
|
Work on Floor(s): 015
|
09/04/2001 |
102147240 |
PR |
I LAA SIGNED OFF |
01/03/2002 |
MP 001375 |
MINARIK |
|
FURNISH LABOR AND MATERIAL AND INSTALL NEW PLUMBING FIXTURES ON EXISTING R
|
|
Work on Floor(s): 018
|
06/24/1996 |
101318771 |
PR |
E LAA FILED |
06/24/1996 |
MP 001199 |
ALEXANDE |
|
REMOVE AND REPLACE EXISTING 1 WATER CLOSET, 1 LAVATORY , 1 TUB AND 1 KITCH
|