| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
04/05/2011 |
110535582 |
PR |
I LAA SIGNED OFF |
06/06/2011 |
MP 002073 |
SKULUDIS |
|
IN APARTMENT 3C ON THE 3RD FLOOR REPLACE TUB WITH SHOWER AND SHOWERBODY.
|
|
Work on Floor(s): 003
|
08/11/2008 |
110234014 |
PR |
I LAA SIGNED OFF |
10/31/2008 |
MP 000491 |
WEXLER |
|
REPLACE ON EXISTING ROUGHING, (1) WATER CLOSET (1) LAV (1) BATHTUB (1) KIT
|
|
Work on Floor(s): 003
|
09/26/2005 |
102381904 |
PR |
I LAA SIGNED OFF |
11/17/2005 |
MP 000657 |
CATANIA |
|
IN APT.#3G ON THE 3RD FL. REPLACE TOILET, TUB & SINK TO EXISTING ROUGHING.
|
|
Work on Floor(s): 003
|
07/15/2003 |
102357245 |
PR |
I LAA SIGNED OFF |
10/25/2005 |
MP 001629 |
COAKLEY |
|
REPLACE EXISITING BATHTUB WITH NEW SHOWER STALL IN APT#6A.
|
|
Work on Floor(s): 006
|
11/22/2002 |
102268779 |
PR |
I LAA SIGNED OFF |
05/22/2004 |
MP 001629 |
COAKLEY |
|
REPLACEMENT OF TUB/SHOWER BODY WITH NEW SHOWER STALL. ROUGHING MODIFICATI
|
|
Work on Floor(s): 005
|