FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
07/09/2021 |
140991746 |
02 |
A2 |
P APPROVED |
07/18/2021 |
|
LEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 014
|
01/04/2021 |
140991746 |
01 |
A2 |
X SIGNED OFF |
07/13/2023 |
0035061 RA |
LEE |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLAN TO RENOVATE APARTMENT UNIT#14CD. REMOVAL AND INSTALLATI
|
|
Work on Floor(s): 014
|
12/16/2020 |
140991719 |
01 |
A2 |
H P/E IN PROCESS |
12/16/2020 |
0035061 RA |
LEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/16/2020 HEREWITH FILE PLAN TO RENOVATE APARTMENT UNIT#14C
|
|
Work on Floor(s): 014
|
08/27/2019 |
140530977 |
02 |
A3 |
P APPROVED |
08/29/2019 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
08/15/2019 |
104097282 |
04 |
A2 |
P APPROVED |
08/20/2019 |
0020773 RA |
CONNERS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
08/01/2019 |
104097282 |
03 |
A2 |
P APPROVED |
08/01/2019 |
|
CONNERS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
07/16/2019 |
104097282 |
02 |
A2 |
P APPROVED |
07/30/2019 |
0020773 RA |
CONNERS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION OF EXISTING APARTMENT AT 11 FLOO
|
|
Work on Floor(s): 011
|
03/13/2019 |
123717941 |
01 |
A3 |
J P/E DISAPPROVED |
03/13/2019 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2019 PROPOSED BETA MAX MATERIAL HOIST INSTALLATION ON
|
|
Work on Floor(s): PEN 016 thru 017
|
03/12/2019 |
123185695 |
02 |
A2 |
P APPROVED |
03/14/2019 |
|
GERMAIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
03/11/2019 |
140834300 |
02 |
A3 |
P APPROVED |
04/05/2019 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN 016 thru 017
|
02/25/2019 |
140834300 |
01 |
A3 |
R PERMIT-ENTIRE |
04/08/2019 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED BETA MAX MATERIAL HOIST INSTALLATION ON 16/17TH FLOOR PENTHOUSE S
|
|
Work on Floor(s): PEN 016 thru 017
|
04/05/2018 |
122707115 |
02 |
A2 |
P APPROVED |
05/11/2018 |
|
ROUSHAKE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 007
|
11/27/2017 |
123185695 |
01 |
A2 |
X SIGNED OFF |
03/18/2019 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOIER. REPLAC
|
|
Work on Floor(s): CEL,OSP
|
11/09/2017 |
123258250 |
01 |
A3 |
R PERMIT-ENTIRE |
11/13/2018 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED SUPPORTED SCAFFOLD INSTALLATION ON VARIOUS FACADES AND SETBACKS F
|
|
Work on Floor(s): EXT
|
04/12/2017 |
123038729 |
01 |
A3 |
P APPROVED |
04/12/2017 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE 2ND SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #:
|
|
Work on Floor(s): EXT
|
08/03/2016 |
140530977 |
01 |
A3 |
R PERMIT-ENTIRE |
07/01/2020 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF.
|
|
Work on Floor(s): OSP
|
06/16/2016 |
122804581 |
01 |
A3 |
P APPROVED |
06/21/2016 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 122717
|
|
Work on Floor(s): EXT
|
05/09/2016 |
122717079 |
01 |
A2 |
X SIGNED OFF |
10/29/2020 |
0048838 PE |
MERRITT |
|
NOT APPLICABLE
|
|
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): 0PH,ROF 014 thru 016
|
03/31/2016 |
122707115 |
01 |
A2 |
R PERMIT-ENTIRE |
05/18/2016 |
0030221 RA |
ROUSHAKE |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 7D, GENERAL CONSTRUCTION TO INCLUDE R
|
|
Work on Floor(s): 007
|
05/22/2015 |
122411309 |
01 |
A2 |
X SIGNED OFF |
01/12/2016 |
0075316 PE |
SCHNALL |
|
NOT APPLICABLE
|
|
RENOVATE APARTMENT 12C/D, THE COMBINATION OF APARTMENTS COMPLIES WITH ALL
|
|
Work on Floor(s): 012
|
02/02/2015 |
122187418 |
03 |
A2 |
P APPROVED |
02/03/2015 |
0638711 PE |
IRWIN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/16/2017 PER PLAN EXAMINER OBJECTIONS, HEREWITH FILE SUBS
|
|
Work on Floor(s): CEL,BAS
|
11/17/2014 |
122187418 |
02 |
A2 |
P APPROVED |
02/03/2015 |
0638711 PE |
IRWIN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/16/2017 HEREWITH FILE MECHANICAL PLANS FOR THE INSTALLATI
|
|
Work on Floor(s): CEL,BAS
|
11/17/2014 |
122187418 |
01 |
A2 |
P APPROVED |
02/03/2015 |
0019999 RA |
ALLEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/16/2017 HEREWITH FILE PLANS TO RENOVATE THE CELLAR SPACE,
|
|
Work on Floor(s): CEL,BAS
|
09/22/2014 |
122126154 |
01 |
A2 |
P APPROVED |
11/26/2014 |
0034412 RA |
CHENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/02/2015 RENOVATION OF APARTMENT 4H. NO CHANGE OF USE, OCC
|
|
Work on Floor(s): 004
|
10/18/2013 |
120736409 |
02 |
A2 |
P APPROVED |
12/17/2013 |
|
CANTON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN 001 thru 016
|
08/23/2013 |
121461373 |
04 |
A2 |
P APPROVED |
08/26/2013 |
|
SCHMITT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 013
|
08/23/2013 |
121461373 |
03 |
A2 |
P APPROVED |
08/23/2013 |
|
SCHMITT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 013
|
07/30/2013 |
121461373 |
02 |
A2 |
P APPROVED |
07/31/2013 |
|
SCHMITT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 013
|
07/09/2013 |
121643187 |
01 |
A2 |
P APPROVED |
12/23/2013 |
0082481 PE |
TAHA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/29/2018 INSTALLATION OF SPRINKLER AND GAS PIPING AS PER P
|
|
Work on Floor(s): CEL
|
07/08/2013 |
121706289 |
01 |
A3 |
X SIGNED OFF |
09/04/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF 185 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
01/10/2013 |
121074390 |
02 |
A2 |
P APPROVED |
01/22/2013 |
|
PORTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
12/14/2012 |
121461373 |
01 |
A2 |
X SIGNED OFF |
05/05/2014 |
0017742 RA |
SCHMITT |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APT# 14A ON 13TH FLOOR. RELOCATION OF BATH
|
|
Work on Floor(s): 013
|
05/10/2012 |
121074390 |
01 |
A2 |
R PERMIT-ENTIRE |
06/28/2012 |
0015595 RA |
PORTER |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT 8D,GENERAL CONSTRUCTION AND PLUMBING WORK
|
|
Work on Floor(s): 008
|
07/20/2011 |
120778257 |
01 |
A3 |
R PERMIT-ENTIRE |
07/21/2011 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001
|
06/24/2011 |
120736409 |
01 |
A2 |
X SIGNED OFF |
03/24/2014 |
0046441 PE |
CANTON |
|
NOT APPLICABLE
|
|
MISCELLANEOUS FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): PEN 001 thru 016
|
03/01/2011 |
120483565 |
02 |
A3 |
P APPROVED |
03/03/2011 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
09/24/2010 |
120483565 |
01 |
A3 |
X SIGNED OFF |
09/06/2013 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 185'LONG AS PER
|
|
Work on Floor(s): OSP
|
07/28/2010 |
120306560 |
02 |
A2 |
P APPROVED |
08/06/2010 |
|
JOHNSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
05/13/2010 |
110388394 |
03 |
A2 |
P APPROVED |
05/17/2010 |
|
JOHNSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
04/01/2010 |
120306560 |
01 |
A2 |
X SIGNED OFF |
10/16/2013 |
0029342 RA |
JOHNSON |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT #9G ON THE 9TH FLOOR. ARCHITECTURAL AN
|
|
Work on Floor(s): 009
|