| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/24/2024 |
122226527 |
02 |
A2 |
P APPROVED |
04/25/2024 |
0030065 RA |
GLASGOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/03/2023 |
123079131 |
06 |
A1 |
D A/P ENTIRE |
01/11/2023 |
0073130 PE |
MCHUGH |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/11/2023
|
|
Work on Floor(s): 008,009
|
| 12/29/2022 |
123079131 |
05 |
A1 |
P APPROVED |
08/23/2023 |
|
SU-TOM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008,009
|
| 11/22/2022 |
123079131 |
04 |
A1 |
J P/E DISAPPROVED |
11/29/2022 |
0036465 RA |
SU-TOM |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/21/2022
|
|
Work on Floor(s): 008,009
|
| 07/28/2021 |
122133299 |
02 |
A2 |
P APPROVED |
10/07/2021 |
0080474 PE |
BERMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/07/2023
|
|
Work on Floor(s): 9TH
|
| 09/21/2020 |
123812543 |
05 |
A2 |
P APPROVED |
09/24/2020 |
|
QUINTANI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 017,018
|
| 02/28/2020 |
123753223 |
02 |
A2 |
P APPROVED |
03/02/2020 |
|
QUINTANI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017,018
|
| 02/28/2020 |
123812570 |
02 |
A2 |
P APPROVED |
03/02/2020 |
|
QUINTANI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017
|
| 10/09/2019 |
123812552 |
03 |
A2 |
P APPROVED |
10/15/2019 |
0018563 RA |
SWEERS I |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017
|
| 10/01/2019 |
123888962 |
01 |
A2 |
X SIGNED OFF |
09/21/2020 |
0020369 RA |
GIUSEFFI |
|
NOT APPLICABLE
|
|
ARCHITECTURAL ALTERATIONS AT 16TH FLOOR SPACE (FT PARTNERS) AS INDICATED O
|
|
Work on Floor(s): 016
|
| 09/26/2019 |
123812543 |
04 |
A2 |
P APPROVED |
10/15/2019 |
0018563 RA |
SWEERS I |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017,018
|
| 09/19/2019 |
123746045 |
01 |
A2 |
X SIGNED OFF |
12/08/2020 |
0055159 PE |
O'CONNEL |
|
NOT APPLICABLE
|
|
INTERIOR NON-STRUCTURAL DEMOLITION ON THE 1ST FLOOR; RELATED WORK AS PER P
|
|
Work on Floor(s): 001
|
| 06/24/2019 |
123812552 |
01 |
A2 |
X SIGNED OFF |
10/20/2020 |
0018563 RA |
SWEERS I |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATION TO PART OF 17TH FLOOR SUB-TENANT SPACE (LENOX) A
|
|
Work on Floor(s): 017
|
| 06/24/2019 |
123812570 |
01 |
A2 |
X SIGNED OFF |
10/22/2020 |
0085879 PE |
QUINTANI |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATION ON PART OF 17TH FLOOR SUB-TENANT SPACE (LENOX) AS
|
|
Work on Floor(s): 017
|
| 06/24/2019 |
123753223 |
01 |
A2 |
X SIGNED OFF |
11/12/2020 |
0085879 PE |
QUINTANI |
|
NOT APPLICABLE
|
|
MODIFICATION TO SPRINKLER SYSTEM AT 17TH AND 18TH FLOOR (MASS MUTUAL) AS
|
|
Work on Floor(s): 017,018
|
| 06/24/2019 |
123812543 |
03 |
A2 |
X SIGNED OFF |
10/22/2020 |
0072030 PE |
FALCONER |
|
NOT APPLICABLE
|
|
STRUCTURAL MODIFICATIONS AT 17TH AND 18TH FLOORS AS INDICATED ON DRAWINGS.
|
|
Work on Floor(s): 017,018
|
| 06/24/2019 |
123812543 |
02 |
A2 |
X SIGNED OFF |
10/22/2020 |
0085879 PE |
QUINTANI |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO MECHANICAL AND PLUMBING SYSTEMS AT THE 17TH AND 18TH FLOO
|
|
Work on Floor(s): 017,018
|
| 06/24/2019 |
123812543 |
01 |
A2 |
X SIGNED OFF |
10/22/2020 |
0018563 RA |
SWEERS I |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS FOR TENANT FIT OUT (MASS MUTUAL) AT THE 17TH AND 18TH
|
|
Work on Floor(s): 017,018
|
| 06/24/2019 |
123812552 |
02 |
A2 |
X SIGNED OFF |
10/20/2020 |
0085879 PE |
QUINTANI |
|
NOT APPLICABLE
|
|
MINOR MECHANICAL AND PLUMBING MODIFICATIONS ON 17TH FLOOR SUB-TENANT SPACE
|
|
Work on Floor(s): 017
|
| 06/07/2019 |
123898210 |
01 |
A2 |
X SIGNED OFF |
11/18/2019 |
0057887 PE |
GOLDSTEI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION (LOOP) ON THE 17TH FLO
|
|
Work on Floor(s): 017
|
| 05/20/2019 |
123762883 |
01 |
A2 |
X SIGNED OFF |
09/25/2019 |
0028860 RA |
FOGARTY |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS TO 41ST FLOOR (PREBUILD REMODEL) AS INDICATED ON DRAW
|
|
Work on Floor(s): 041
|
| 05/06/2019 |
123760518 |
01 |
A2 |
X SIGNED OFF |
12/27/2019 |
0013250 RA |
DELIA |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF NON-LOAD-BEARING PARTITIONS AT 17TH FLOOR AS INDICA
|
|
Work on Floor(s): 017
|
| 04/09/2019 |
123837642 |
01 |
A2 |
X SIGNED OFF |
12/20/2019 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
SPRINKLER SYSTEM MODIFICATIONS TO 18TH FLOOR CORE RESTROOMS WITH RELATED W
|
|
Work on Floor(s): 018
|
| 04/04/2019 |
123714953 |
01 |
A2 |
X SIGNED OFF |
01/15/2020 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON THE 18TH FLOOR (C
|
|
Work on Floor(s): 018
|
| 04/04/2019 |
123836947 |
01 |
A2 |
X SIGNED OFF |
09/24/2019 |
0028557 RA |
GUO |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION ALTERATIONS TO 18TH FLOOR CORE RESTROOMS WITH RELATED
|
|
Work on Floor(s): 018
|
| 04/04/2019 |
123836947 |
02 |
A2 |
X SIGNED OFF |
09/24/2019 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING ALTERATIONS TO 18TH FLOOR CORE RESTROOMS WITH RELA
|
|
Work on Floor(s): 018
|
| 02/28/2019 |
123852713 |
01 |
A2 |
X SIGNED OFF |
09/19/2019 |
0057887 PE |
GOLDSTEI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SPRINKLER PROTECTION (LOOP) ON THE 18TH FLOOR WI
|
|
Work on Floor(s): 018
|
| 02/20/2019 |
123679796 |
01 |
A2 |
X SIGNED OFF |
11/26/2019 |
0072030 PE |
FALCONER |
|
NOT APPLICABLE
|
|
STRUCTURAL ALTERATIONS FOR SLAB INFILL AND RELATED WORK BETWEEN 16TH AND 1
|
|
Work on Floor(s): 016,017
|
| 02/06/2019 |
123666988 |
01 |
A2 |
X SIGNED OFF |
11/10/2020 |
0028860 RA |
FOGARTY |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS FOR SLAB INFILL AND RELATED WORK BETWEEN 22ND AND 23R
|
|
Work on Floor(s): 022,023
|
| 02/06/2019 |
123666988 |
02 |
A2 |
X SIGNED OFF |
11/10/2020 |
0072030 PE |
FALCONER |
|
NOT APPLICABLE
|
|
STRUCTURAL ALTERATIONS FOR SLAB INFILL BETWEEN 22ND AND 23RD FLOORS AS IND
|
|
Work on Floor(s): 022,023
|
| 01/31/2019 |
123668307 |
01 |
A2 |
X SIGNED OFF |
10/18/2019 |
0013250 RA |
DELIA |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF NON-LOAD-BEARING PARTITIONS AND PLUMBING FIXTURES O
|
|
Work on Floor(s): 018
|
| 12/24/2018 |
123295558 |
03 |
PA |
P APPROVED |
09/25/2023 |
0036465 RA |
SU-TOM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008,009
|
| 12/19/2018 |
123595671 |
02 |
A2 |
P APPROVED |
12/27/2018 |
|
FORD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 023
|
| 12/17/2018 |
123295558 |
02 |
PA |
P APPROVED |
04/23/2019 |
|
SU-TOM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008,009
|
| 12/06/2018 |
123408641 |
01 |
A2 |
X SIGNED OFF |
06/05/2019 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON 23RD FLOOR CORE
|
|
Work on Floor(s): 023
|
| 12/05/2018 |
123595680 |
01 |
A2 |
X SIGNED OFF |
10/25/2019 |
0028860 RA |
FOGARTY |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS TO CORE RESTROOMS, PUBLIC CORRIDOR AND TENANT SPACES
|
|
Work on Floor(s): 023
|
| 12/05/2018 |
123595671 |
01 |
A2 |
X SIGNED OFF |
06/04/2019 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATIONS TO CORE RESTROOMS, PUBLIC CORRIDOR AND TENANT SPAC
|
|
Work on Floor(s): 023
|
| 12/05/2018 |
123595680 |
02 |
A2 |
X SIGNED OFF |
10/25/2019 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO MECHANICAL AND PLUMBING SYSTEMS ON THE 23RD FLOOR AS INDI
|
|
Work on Floor(s): 023
|
| 10/31/2018 |
123369158 |
02 |
A2 |
X SIGNED OFF |
06/08/2021 |
0071504 PE |
FORD |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO MECHANICAL AND PLUMBING SYSTEMS ON THE 24TH FLOOR AS PER
|
|
Work on Floor(s): 024
|
| 10/31/2018 |
123369158 |
01 |
A2 |
X SIGNED OFF |
06/08/2021 |
0022226 RA |
LANZELOT |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR ALTERATIONS TO 24TH FLOOR SPACE (ERICSSON) AS PER PLANS
|
|
Work on Floor(s): 024
|