FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
11/12/2024 |
123842538 |
08 |
A1 |
G PAA FEE DUE |
11/12/2024 |
0036004 RA |
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
06/01/2023 |
123842538 |
07 |
A1 |
P APPROVED |
06/29/2023 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
09/12/2022 |
123842538 |
06 |
A1 |
P APPROVED |
10/19/2022 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
05/05/2022 |
123842538 |
05 |
A1 |
P APPROVED |
05/16/2022 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
02/03/2022 |
140970117 |
05 |
A3 |
P APPROVED |
02/04/2022 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
01/28/2022 |
123842538 |
04 |
A1 |
P APPROVED |
02/04/2022 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
01/25/2022 |
123865772 |
02 |
A2 |
P APPROVED |
02/02/2022 |
|
BURNS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): LOB
|
11/19/2021 |
140970117 |
04 |
A3 |
P APPROVED |
11/24/2021 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
07/27/2021 |
140970117 |
03 |
A3 |
P APPROVED |
07/29/2021 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
06/23/2021 |
140899650 |
03 |
A2 |
P APPROVED |
07/21/2021 |
|
BURNS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING FOR GENERAL CONSTRUCTION MODIFICATIO
|
|
Work on Floor(s): FAC,CEL,GRD,002
|
06/10/2021 |
141002607 |
02 |
A2 |
P APPROVED |
06/15/2021 |
|
LOKE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 018 thru 019
|
05/27/2021 |
141002607 |
01 |
A2 |
R PERMIT-ENTIRE |
05/28/2021 |
0075541 PE |
LOKE |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF A SPYDER CRANE AS PER PLANS SUBMITTED. SPYDER CRA
|
|
Work on Floor(s): 018 thru 019
|
04/13/2021 |
140907008 |
02 |
A2 |
D A/P ENTIRE |
06/28/2021 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 007
|
03/15/2021 |
140999392 |
01 |
A3 |
X SIGNED OFF |
11/16/2022 |
0036004 RA |
BURNS |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR MARQUEE MODIFICATIONS AS PER PLANS FILED HEREWITH. N
|
|
Work on Floor(s): OSP,LOB
|
03/08/2021 |
140903681 |
02 |
A2 |
J P/E DISAPPROVED |
03/25/2021 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/20/2022 FILING FOR MECHANICAL MODIFICATIONS TO THE CELLAR
|
|
Work on Floor(s): CEL,001
|
01/19/2021 |
123728555 |
02 |
A2 |
L P/E PAA $ PENDIN |
01/22/2021 |
|
BURNS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/31/2022 FILING FOR GENERAL CONSTRUCTION MODIFICATIONS ON
|
|
Work on Floor(s): CEL,001,003
|
01/19/2021 |
140898143 |
03 |
A2 |
P APPROVED |
01/26/2021 |
|
LILKER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/14/2021 FILING FOR MECHANICAL MODIFICATIONS TO THE 4TH F
|
|
Work on Floor(s): 004
|
01/13/2021 |
123702449 |
02 |
A2 |
P APPROVED |
03/18/2021 |
|
BURNS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
01/04/2021 |
140892078 |
03 |
A2 |
P APPROVED |
01/12/2021 |
|
JUHASZ |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/14/2021 FILING FOR GENERAL CONSTRUCTION MODIFICATIONS TO
|
|
Work on Floor(s): 004
|
12/21/2020 |
140991693 |
01 |
A3 |
X SIGNED OFF |
02/06/2023 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
ROOF PROTECTION PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLAN. NO
|
|
Work on Floor(s): OSP
|
11/17/2020 |
140970117 |
02 |
A3 |
P APPROVED |
11/23/2020 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF SINGLE 7360 LBS CAPACITY PE
|
|
Work on Floor(s): OSP
|
10/23/2020 |
140970117 |
01 |
A3 |
X SIGNED OFF |
04/04/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SINGLE 7360 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING B
|
|
Work on Floor(s): OSP
|
10/13/2020 |
140965285 |
01 |
A3 |
X SIGNED OFF |
12/13/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
VERTICAL NETTING PROPOSED INSTALLATION OF VERTICAL NETTING AS PER PLAN. N
|
|
Work on Floor(s): OSP
|
09/28/2020 |
140898143 |
02 |
A2 |
P APPROVED |
10/13/2020 |
|
LILKER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/14/2021 FILING FOR MECHANICAL MODIFICATIONS TO THE 1ST, A
|
|
Work on Floor(s): 001,004
|
09/24/2020 |
140892078 |
02 |
A2 |
P APPROVED |
10/14/2020 |
|
JUHASZ |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/14/2021 FILING FOR GENERAL CONSTRUCTION MODIFICATIONS TO
|
|
Work on Floor(s): 001,004
|
09/23/2020 |
123842538 |
03 |
A1 |
P APPROVED |
09/23/2020 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
08/27/2020 |
123865754 |
02 |
A2 |
P APPROVED |
09/18/2020 |
|
BURNS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 012
|
08/20/2020 |
123842538 |
02 |
A1 |
P APPROVED |
09/10/2020 |
|
BURNS |
|
GRANTED 07/24/2020
|
|
POST APPROVAL AMENDMENT FOR 01 GENERAL CONSTRUCTION MODIFICATIONS RELATED
|
|
Work on Floor(s): CEL 001 thru 017
|
08/18/2020 |
140940463 |
01 |
A2 |
H P/E IN PROCESS |
08/18/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/16/2020 FILING FOR CANTILEVERED WORKING PLATFORM ON 18TH F
|
|
Work on Floor(s): OSP
|
08/18/2020 |
140940454 |
01 |
A2 |
H P/E IN PROCESS |
08/18/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/18/2020 FILING FOR CANTILEVERED WORKING PLATFORM ON 18TH
|
|
Work on Floor(s): OSP
|
07/09/2020 |
140899650 |
02 |
A2 |
P APPROVED |
08/11/2020 |
|
BURNS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,GRD,002
|
06/02/2020 |
140907008 |
01 |
A2 |
P APPROVED |
06/02/2020 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
FILING OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH ALT-I 123842538
|
|
Work on Floor(s): CEL 001 thru 007
|
05/26/2020 |
140903752 |
01 |
A2 |
X SIGNED OFF |
11/29/2022 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
FILING FOR MECHANICAL MODIFICATIONS TO INCLUDE DUCTWORK TO THE GROUND FLOO
|
|
Work on Floor(s): 001
|
06/26/2020 |
140903681 |
01 |
A2 |
X SIGNED OFF |
12/21/2022 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
FILING FOR MECHANICAL MODIFICATIONS TO THE GROUND FLOOR FACADE AS PER PLAN
|
|
Work on Floor(s): 001
|
05/19/2020 |
140898143 |
01 |
A2 |
P APPROVED |
05/28/2020 |
0060859 PE |
LILKER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/14/2021 FILING FOR MECHANICAL MODIFICATIONS TO THE 4TH F
|
|
Work on Floor(s): 004
|
05/08/2020 |
140899650 |
01 |
A2 |
R PERMIT-ENTIRE |
11/13/2020 |
0036004 RA |
BURNS |
|
NOT APPLICABLE
|
|
FILING FOR GENERAL CONSTRUCTION MODIFICATIONS TO INCLUDE STOREFRONT RENOVA
|
|
Work on Floor(s): FAC,CEL,GRD,002
|
05/04/2020 |
140899972 |
01 |
A2 |
D A/P ENTIRE |
05/04/2020 |
0072050 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/13/2020 FILING FOR MECHANICAL MODIFICATIONS TO THE 1ST FL
|
|
Work on Floor(s): 001
|
03/19/2020 |
140892078 |
01 |
A2 |
P APPROVED |
03/26/2020 |
0027535 RA |
JUHASZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/14/2021 FILING FOR GENERAL CONSTRUCTION MODIFICATIONS TO
|
|
Work on Floor(s): 004
|
03/18/2020 |
140892087 |
01 |
A2 |
H P/E IN PROCESS |
03/18/2020 |
0060859 PE |
LILKER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/27/2020 FILING FOR MECHANICAL MODIFICATIONS TO THE 1ST, 2
|
|
Work on Floor(s): 001,002,007
|
02/19/2020 |
123842538 |
01 |
A1 |
R PERMIT-ENTIRE |
09/16/2021 |
0036004 RA |
BURNS |
|
GRANTED 07/24/2020
|
|
GENERAL CONSTRUCTION MODIFICATIONS RELATED TO THE DOCUMENTATION OF EXISTIN
|
|
Work on Floor(s): CEL 001 thru 017
|