| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 02/09/2015 |
140309814 |
PR |
I LAA SIGNED OFF |
07/22/2015 |
MP 001286 |
PESCATOR |
|
IN CELL, RUN 50' OF NEW 2" BLK PIPE GAS LINE FROM EXISTING SERVICE BEFORE
|
|
Work on Floor(s): CEL
|
| 10/10/2014 |
140266263 |
PR |
E LAA FILED |
10/10/2014 |
OBI 001509 |
BENDJOUY |
|
INSTALLATION OF A TEMPORARY 2,000 GALLON OIL TANK, IN FRONT OF BUILDING, T
|
|
Work on Floor(s): OSP
|
| 09/18/2014 |
140255818 |
PR |
E LAA FILED |
09/18/2014 |
OBI 001509 |
BENDJOUY |
|
CHANGE GRADE OF FUEL FROM #6 OIL TO #2 OIL. WE WILL REMOVE THE PRE-HEATER
|
|
Work on Floor(s): BAS
|
| 04/28/2014 |
140191450 |
PR |
E LAA FILED |
04/28/2014 |
MP 001839 |
MCMILLAN |
|
FILE LAA TO INSTALL GAS PIPING APPROXIMATELY 120 FEET OF 1 1/4" BLACK PIPE
|
|
Work on Floor(s): 6TH
|
| 06/19/2013 |
121644989 |
PR |
E LAA FILED |
07/03/2013 |
OBI 004201 |
BERGE |
|
CHANGE GRADE OF FUEL FROM #6 TO #4. NO CHANGE IN FIRING RATE. A PRE-HEATE
|
|
Work on Floor(s): CEL
|
| 08/24/1992 |
100539696 |
PR |
I LAA SIGNED OFF |
09/17/1992 |
MP 011863 |
BRENNER |
|
REPLACE LEAKING SECTIONS OF GAS PIPING IN BST.& ROOF. UPON COMPLETION
|
|
Work on Floor(s): BST, RO,F
|