07/28/2025 |
121205105 |
19 |
NB |
D A/P ENTIRE |
07/31/2025 |
0015649 RA |
LEWIS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
10/21/2024 |
121205105 |
18 |
NB |
P APPROVED |
10/28/2024 |
|
LEWIS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
07/07/2023 |
121205105 |
17 |
NB |
P APPROVED |
07/17/2023 |
0015649 RA |
GOTTESDI |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
06/13/2023 |
121205105 |
16 |
NB |
P APPROVED |
07/17/2023 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
07/28/2022 |
123686528 |
05 |
A3 |
P APPROVED |
08/22/2022 |
|
DEAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
02/01/2022 |
121205105 |
15 |
NB |
P APPROVED |
02/08/2022 |
|
GOTTESDI |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
01/13/2022 |
123686528 |
04 |
A3 |
P APPROVED |
01/19/2022 |
|
DEAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
11/05/2021 |
141006033 |
01 |
A2 |
P APPROVED |
11/05/2021 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/31/2024 HERWITH FILING OCCUPANT PROTECTION PLAN IN CONJUN
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
10/19/2021 |
121205105 |
14 |
NB |
P APPROVED |
10/20/2021 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
10/04/2021 |
121205105 |
13 |
NB |
P APPROVED |
10/20/2021 |
0082265 PE |
WONG |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
10/04/2021 |
121205105 |
12 |
NB |
P APPROVED |
11/08/2021 |
0082265 PE |
WONG |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
09/23/2021 |
121205105 |
11 |
NB |
P APPROVED |
09/24/2021 |
|
GOTTESDI |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
09/16/2021 |
123686528 |
03 |
A3 |
P APPROVED |
09/23/2021 |
|
DEAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
08/19/2021 |
121205105 |
10 |
NB |
P APPROVED |
08/26/2021 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
07/06/2021 |
121205105 |
09 |
NB |
P APPROVED |
07/14/2021 |
|
GOTTESDI |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
04/29/2021 |
121205105 |
08 |
NB |
P APPROVED |
05/25/2021 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/15/2021 |
140915160 |
03 |
A3 |
P APPROVED |
03/16/2021 |
|
PERDEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
10/29/2020 |
140889019 |
03 |
A3 |
P APPROVED |
11/02/2020 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
08/05/2020 |
140915160 |
02 |
A3 |
P APPROVED |
08/20/2020 |
|
PERDEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
07/17/2020 |
140889019 |
02 |
A3 |
P APPROVED |
07/24/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
07/01/2020 |
140915160 |
01 |
A3 |
X SIGNED OFF |
01/29/2024 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. TEMPORARY
|
|
Work on Floor(s): OSP
|
06/29/2020 |
140899507 |
01 |
A2 |
X SIGNED OFF |
11/20/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF ULMA MATERIAL PLATFORM AS PER PLANS FILED HEREWITH
|
|
Work on Floor(s): 002
|
06/22/2020 |
140916070 |
01 |
A3 |
X SIGNED OFF |
01/13/2023 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTIE
|
|
Work on Floor(s): OSP
|
06/18/2020 |
140914964 |
01 |
A3 |
H P/E IN PROCESS |
06/18/2020 |
0101795 PE |
KETCHO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/18/2020 INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS P
|
|
Work on Floor(s): OSP
|
05/14/2020 |
140891391 |
01 |
A2 |
X SIGNED OFF |
11/20/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
05/06/2020 |
140900513 |
01 |
A3 |
X SIGNED OFF |
01/18/2023 |
0089761 PE |
DETERNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION AND USAGE OF MONORAIL SYSTEM AS PER DRAWINGS. MONORAIL SYSTEM
|
|
Work on Floor(s): 012
|
04/21/2020 |
140891408 |
01 |
A2 |
X SIGNED OFF |
11/20/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF X-CLIMB SYSTEM AS PER PLANS FILED HEREWITH. NO CHA
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/24/2020 |
121205105 |
07 |
NB |
P APPROVED |
04/14/2020 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/21/2020 |
123686528 |
02 |
A3 |
P APPROVED |
06/15/2020 |
0087122 PE |
DEAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/19/2020 |
121205105 |
06 |
NB |
P APPROVED |
04/14/2020 |
|
GOTTESDI |
|
AMENDED 10/28/2024
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/16/2020 |
140891355 |
01 |
A2 |
H P/E IN PROCESS |
03/16/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2020 INSTALLATION AND USE OF X-CLIMB SYSTEM AS PER PLA
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/16/2020 |
140891346 |
01 |
A2 |
H P/E IN PROCESS |
03/16/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/16/2020 INSTALLATION AND USE OF MINI CRANE AS PER PLANS F
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
03/11/2020 |
140890622 |
01 |
A2 |
X SIGNED OFF |
11/20/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): ROF,CEL 001 thru 012
|
02/27/2020 |
140889019 |
01 |
A3 |
X SIGNED OFF |
12/15/2021 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NE
|
|
Work on Floor(s): OSP
|
06/27/2019 |
123774736 |
01 |
A2 |
X SIGNED OFF |
07/19/2021 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR INSTALLATION OF TEMPORARY DRY FIRE STANDPIPE RISER D
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
06/12/2019 |
121205105 |
05 |
NB |
R PERMIT-ENTIRE |
05/13/2020 |
0058375 PE |
MASS |
|
AMENDED 10/28/2024
|
|
INSTALLATION OF MECHANICAL DUCTWORK AND A/C UNITS. INSTALLATION OF PLUMBI
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
06/12/2019 |
121205105 |
04 |
NB |
R PERMIT-ENTIRE |
05/13/2020 |
0090694 PE |
CERMAK |
|
AMENDED 10/28/2024
|
|
FILED HEREWITH SUPPORT OF EXCAVATION FOR NEW OFFICE BUILDING.
|
|
Work on Floor(s): OSP
|
06/12/2019 |
121205105 |
03 |
NB |
R PERMIT-ENTIRE |
05/13/2020 |
0082265 PE |
WONG |
|
AMENDED 10/28/2024
|
|
FILED HEREWITH FOUNDATION AND FOOTING DRAWINGS FOR NEW OFFICE BUILDING.
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
06/12/2019 |
121205105 |
02 |
NB |
R PERMIT-ENTIRE |
05/13/2020 |
0082265 PE |
WONG |
|
AMENDED 10/28/2024
|
|
INSTALLATION OF STRUCTURAL COLUMNS AND BEAMS AS SHOWN ON DRAWINGS FILED
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
06/10/2019 |
140853510 |
01 |
A2 |
D A/P ENTIRE |
06/10/2019 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/10/2019 APPLICATION FILED FOR INSTALLATION OF TEMPORARY D
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|