 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/04/2017 |
140638102 |
01 |
A2 |
X SIGNED OFF |
02/23/2018 |
0083189 PE |
HUANG |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT 4TH FLOOR. (APT. #4E) CEILING, FLOORING,
|
|
Work on Floor(s): 004
|
| 10/20/2010 |
120507317 |
01 |
A2 |
X SIGNED OFF |
12/10/2010 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 5TH FLOOR (APT.5W). PARTITION WALL AND GENERAL
|
|
Work on Floor(s): 005
|
| 06/17/2010 |
120385145 |
01 |
A2 |
X SIGNED OFF |
09/29/2010 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 5TH FLOOR (APT.5E). PARTITION WALL AND GENERAL
|
|
Work on Floor(s): 005
|
| 04/22/2010 |
120338232 |
01 |
A2 |
X SIGNED OFF |
06/07/2010 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 1ST FLOOR(APT.1R) AND 3RD FLOOR (APT.3W). PARTITION
|
|
Work on Floor(s): 001,003
|
| 10/19/2009 |
120181793 |
01 |
A2 |
X SIGNED OFF |
12/18/2009 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 2ND FLOOR(APT#2R). PARTITION WALL AND GENERAL
|
|
Work on Floor(s): 002
|
| 05/21/2009 |
120044889 |
01 |
A2 |
X SIGNED OFF |
10/13/2009 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT 3RD FLOOR(APT#3E). PARTITION WALL AND GENERAL
|
|
Work on Floor(s): 3RD
|
| 11/22/1994 |
100948441 |
01 |
A2 |
R PERMIT-ENTIRE |
12/15/1994 |
0045488 PE |
GRYNBAL |
|
NOT APPLICABLE
|
|
REPLACE OIL FIRED BOILER & BURNER IN EXI ST'G BOILER ROOM IN CELLAR. NO
|
|
Work on Floor(s): CEL
|