Premises: 319 WEST 35 STREET MANHATTAN BIN: 1013572    Block: 759    Lot: 29

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
06/26/2024 123851796 17 NB G PAA FEE DUE 06/26/2024 TAN AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 025

04/02/2024 141025646 01 A3 F ASSIGNED TO P/E 04/03/2024 0025376 RA TAN NOT APPLICABLE
 NEW BUILDINGS PAVING PLAN- TOTAL FRONTAGE 50 LINER FEET WITH NEW BUILDING
 Work on Floor(s): OSP

03/05/2024 123851796 16 NB D A/P ENTIRE 03/06/2024 0074354 PE WANG AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): SUB,CEL,ROO 001 thru 025

10/12/2023 123851796 15 NB P APPROVED 12/04/2023 TAN AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01 PROPOSED 20 STORY ADDITION ON EXISTING 5 S
 Work on Floor(s): CEL,ROF 001 thru 025

07/05/2023 123851796 14 NB J P/E DISAPPROVED 09/20/2023 0093795 PE XIA AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 025

01/04/2023 123851796 13 NB J P/E DISAPPROVED 04/25/2023 0093795 PE XIA AMENDED 10/27/2022
 DOC WITHDRAWN 09/26/2023
 Work on Floor(s): CEL,ROF 001 thru 025

11/10/2022 123851796 12 NB P APPROVED 03/08/2023 0074354 PE WANG AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): SUB,CEL,ROO 001 thru 025

08/17/2022 123851796 11 NB P APPROVED 11/01/2022 0025376 RA TAN AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 025

03/11/2021 123851796 10 NB P APPROVED 03/16/2021 0074354 PE WANG AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): SUB,CEL,ROO 001 thru 025

11/06/2020 123851796 09 NB P APPROVED 12/03/2020 0074354 PE WANG AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): SUB,CEL,ROO 001 thru 025

11/06/2020 123851796 08 NB P APPROVED 12/03/2020 POON AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 025

10/01/2020 140960397 01 A2 R PERMIT-ENTIRE 11/23/2020 0090372 PE ZDANCEWI NOT APPLICABLE
 INSTALLATION OF MOBILE MINI CRANE DURING NB CONSTRUCTION (BIS # 123851796
 Work on Floor(s): RF 007 thru 025

07/28/2020 123851796 07 NB P APPROVED 08/06/2020 0076468 PE TENG AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 025

07/07/2020 123851796 06 NB P APPROVED 08/11/2020 0016481 RA POON AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01 FILED HEREWITH TO ERECT 25 STORY NEW BUILDI
 Work on Floor(s): CEL,ROF 001 thru 025

06/05/2020 140908757 01 A3 R PERMIT-ENTIRE 06/25/2020 0084781 PE O'CONNOR NOT APPLICABLE
 INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST FOR WORKER ACCESS D
 Work on Floor(s): OSP

05/18/2020 123851796 05 NB P APPROVED 06/15/2020 0016481 RA POON AMENDED 10/27/2022
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,BAS,ROF 001 thru 025

09/12/2019 123140145 03 A2 P APPROVED 09/13/2019 WANG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING,
 Work on Floor(s): CEL 001 thru 005

09/12/2019 123140127 03 A2 P APPROVED 09/13/2019 WANG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING,
 Work on Floor(s): CEL 001 thru 005

05/28/2019 123851796 04 NB R PERMIT-ENTIRE 10/10/2019 0074354 PE WANG AMENDED 10/27/2022
 SUBSEQUENT FIING IS FOR SUPPORT OF EXCAVATION.
 Work on Floor(s): SUB,SEL,ROF 001 thru 025

05/28/2019 123851796 03 NB R PERMIT-ENTIRE 10/10/2019 0074354 PE WANG AMENDED 10/27/2022
 SUBSEQUENT FIOING IS FOR TH E STRUCTURAL AND FOUNDATION WORK.
 Work on Floor(s): SUB,CEL,ROO 001 thru 025

05/28/2019 123851796 02 NB R PERMIT-ENTIRE 05/01/2023 0076468 PE TENG AMENDED 10/27/2022
 SUBSEQUENT FIING IS BEING FILED FOR THE MECHANICL AND PLUMBING WORK.
 Work on Floor(s): SUB,CEL,ROF 001 thru 025

05/17/2019 123851796 01 NB R PERMIT-ENTIRE 08/13/2024 0025376 RA TAN Y AMENDED 10/27/2022
 PROPOSED 20 STORY ADDITION ON EXISTING 5 STORY BUILDING AND CONVERT TO HO
 Work on Floor(s): CEL,ROF 001 thru 025

04/24/2019 123851885 01 A2 R PERMIT-ENTIRE 05/08/2019 0016481 RA POON NOT APPLICABLE
 ALTERATION TYPE II FOR UNDERGROUND PLUMBING WORK AT THE SUBJECT PREMISE FO
 Work on Floor(s): UDG

02/21/2019 123140127 02 A2 P APPROVED 03/29/2019 WANG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING
 Work on Floor(s): CEL 001 thru 005

02/21/2019 123140145 02 A2 P APPROVED 04/05/2019 WANG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING
 Work on Floor(s): CEL 001 thru 005

09/13/2018 123140145 01 A2 X SIGNED OFF 11/06/2020 0074354 PE WANG NOT APPLICABLE
 ALTERATION TYPE II FILING FOR UNDERPINNING,EXCAVATION AND FOUNDATIION & RE
 Work on Floor(s): CEL 001 thru 005

02/02/2018 123140127 01 A2 X SIGNED OFF 11/23/2020 0074354 PE WANG NOT APPLICABLE
 ALTERATION TYPE II FILING FOR UNDERPINNING,EXCV
 Work on Floor(s): CEL 001 thru 005

09/28/2017 140700711 01 A3 R PERMIT-ENTIRE 10/02/2017 0090372 PE ZDANCEWI NOT APPLICABLE
 INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
 Work on Floor(s): OSP

09/28/2017 140700677 01 A3 R PERMIT-ENTIRE 10/02/2017 0090372 PE ZDANCEWI NOT APPLICABLE
 INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
 Work on Floor(s): OSP

09/12/2017 123353325 01 A2 J P/E DISAPPROVED 07/15/2022 0074354 PE WANG NOT APPLICABLE
 PARTIAL DEMOLITION OF AN EXISTING FIVE (5) STORY BUILDING. WORK INCLUDES T
 Work on Floor(s): CEL,FAC,ROF 001 thru 005

09/12/2017 123353316 01 A2 D A/P ENTIRE 09/12/2017 0074354 PE WANG NOT APPLICABLE
 JOB WITHDRAWN 12/24/2018 PARTIAL DEMOLITION OF AN EXISTING FOUR (4) STORY
 Work on Floor(s): CEL,FAC,ROF 001 thru 004

07/24/2017 140663128 01 A3 J P/E DISAPPROVED 07/26/2017 0016481 RA POON NOT APPLICABLE
 HEREWITH FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW MIXED USE
 Work on Floor(s): OSP

06/26/2017 140661068 01 A3 R PERMIT-ENTIRE 06/24/2020 0090372 PE ZDANCEWI NOT APPLICABLE
 INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
 Work on Floor(s): OSP

06/26/2017 140661059 01 A3 R PERMIT-ENTIRE 06/18/2020 0090372 PE ZDANCEWI NOT APPLICABLE
 INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
 Work on Floor(s): OSP

06/21/2017 140658321 01 A2 R PERMIT-ENTIRE 12/13/2017 0087378 PE WANG NOT APPLICABLE
 REMOVE GYPSUM BOARD OF EXISTING NON-LOAD-BEARING WALL ON CEL, 1ST THRU. 5T
 Work on Floor(s): CEL 001 thru 004

05/12/2017 121190996 05 NB J P/E DISAPPROVED 08/04/2017 0016481 RA POON NOT APPLICABLE
 DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT MECHANICAL AND PLUMBIN
 Work on Floor(s): SUB,CEL,TOW,ROF 001 thru 025

05/09/2017 140639664 01 A3 X SIGNED OFF 05/08/2018 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
 Work on Floor(s): OSP

05/06/2017 140638941 01 A3 X SIGNED OFF 05/09/2018 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
 Work on Floor(s): OSP

05/04/2017 121190996 04 NB P APPROVED 08/30/2017 0074354 PE WANG NOT APPLICABLE
 DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT FOUNDATION WORK IN CON
 Work on Floor(s): SUB,CEL,OSP

05/04/2017 121190996 03 NB J P/E DISAPPROVED 08/04/2017 0074354 PE WANG NOT APPLICABLE
 DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT STRUCTURAL WORK IN CON
 Work on Floor(s): SUB,CEL,ROF,TOW 001 thru 025