FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
06/26/2024 |
123851796 |
17 |
NB |
G PAA FEE DUE |
06/26/2024 |
|
TAN |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
04/02/2024 |
141025646 |
01 |
A3 |
F ASSIGNED TO P/E |
04/03/2024 |
0025376 RA |
TAN |
|
NOT APPLICABLE
|
|
NEW BUILDINGS PAVING PLAN- TOTAL FRONTAGE 50 LINER FEET WITH NEW BUILDING
|
|
Work on Floor(s): OSP
|
03/05/2024 |
123851796 |
16 |
NB |
D A/P ENTIRE |
03/06/2024 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROO 001 thru 025
|
10/12/2023 |
123851796 |
15 |
NB |
P APPROVED |
12/04/2023 |
|
TAN |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED 20 STORY ADDITION ON EXISTING 5 S
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
07/05/2023 |
123851796 |
14 |
NB |
J P/E DISAPPROVED |
09/20/2023 |
0093795 PE |
XIA |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 025
|
01/04/2023 |
123851796 |
13 |
NB |
J P/E DISAPPROVED |
04/25/2023 |
0093795 PE |
XIA |
|
AMENDED 10/27/2022
|
|
DOC WITHDRAWN 09/26/2023
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
11/10/2022 |
123851796 |
12 |
NB |
P APPROVED |
03/08/2023 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROO 001 thru 025
|
08/17/2022 |
123851796 |
11 |
NB |
P APPROVED |
11/01/2022 |
0025376 RA |
TAN |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
03/11/2021 |
123851796 |
10 |
NB |
P APPROVED |
03/16/2021 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROO 001 thru 025
|
11/06/2020 |
123851796 |
09 |
NB |
P APPROVED |
12/03/2020 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SUB,CEL,ROO 001 thru 025
|
11/06/2020 |
123851796 |
08 |
NB |
P APPROVED |
12/03/2020 |
|
POON |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
10/01/2020 |
140960397 |
01 |
A2 |
R PERMIT-ENTIRE |
11/23/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF MOBILE MINI CRANE DURING NB CONSTRUCTION (BIS # 123851796
|
|
Work on Floor(s): RF 007 thru 025
|
07/28/2020 |
123851796 |
07 |
NB |
P APPROVED |
08/06/2020 |
0076468 PE |
TENG |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 025
|
07/07/2020 |
123851796 |
06 |
NB |
P APPROVED |
08/11/2020 |
0016481 RA |
POON |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01 FILED HEREWITH TO ERECT 25 STORY NEW BUILDI
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
06/05/2020 |
140908757 |
01 |
A3 |
R PERMIT-ENTIRE |
06/25/2020 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUAL TEMPORARY PERSONAL/MATERIAL HOIST FOR WORKER ACCESS D
|
|
Work on Floor(s): OSP
|
05/18/2020 |
123851796 |
05 |
NB |
P APPROVED |
06/15/2020 |
0016481 RA |
POON |
|
AMENDED 10/27/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,BAS,ROF 001 thru 025
|
09/12/2019 |
123140145 |
03 |
A2 |
P APPROVED |
09/13/2019 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING,
|
|
Work on Floor(s): CEL 001 thru 005
|
09/12/2019 |
123140127 |
03 |
A2 |
P APPROVED |
09/13/2019 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING,
|
|
Work on Floor(s): CEL 001 thru 005
|
05/28/2019 |
123851796 |
04 |
NB |
R PERMIT-ENTIRE |
10/10/2019 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
SUBSEQUENT FIING IS FOR SUPPORT OF EXCAVATION.
|
|
Work on Floor(s): SUB,SEL,ROF 001 thru 025
|
05/28/2019 |
123851796 |
03 |
NB |
R PERMIT-ENTIRE |
10/10/2019 |
0074354 PE |
WANG |
|
AMENDED 10/27/2022
|
|
SUBSEQUENT FIOING IS FOR TH E STRUCTURAL AND FOUNDATION WORK.
|
|
Work on Floor(s): SUB,CEL,ROO 001 thru 025
|
05/28/2019 |
123851796 |
02 |
NB |
R PERMIT-ENTIRE |
05/01/2023 |
0076468 PE |
TENG |
|
AMENDED 10/27/2022
|
|
SUBSEQUENT FIING IS BEING FILED FOR THE MECHANICL AND PLUMBING WORK.
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 025
|
05/17/2019 |
123851796 |
01 |
NB |
R PERMIT-ENTIRE |
08/13/2024 |
0025376 RA |
TAN |
Y |
AMENDED 10/27/2022
|
|
PROPOSED 20 STORY ADDITION ON EXISTING 5 STORY BUILDING AND CONVERT TO HO
|
|
Work on Floor(s): CEL,ROF 001 thru 025
|
04/24/2019 |
123851885 |
01 |
A2 |
R PERMIT-ENTIRE |
05/08/2019 |
0016481 RA |
POON |
|
NOT APPLICABLE
|
|
ALTERATION TYPE II FOR UNDERGROUND PLUMBING WORK AT THE SUBJECT PREMISE FO
|
|
Work on Floor(s): UDG
|
02/21/2019 |
123140127 |
02 |
A2 |
P APPROVED |
03/29/2019 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING
|
|
Work on Floor(s): CEL 001 thru 005
|
02/21/2019 |
123140145 |
02 |
A2 |
P APPROVED |
04/05/2019 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ALTERATION TYPE II FILING FOR UNDERPINNING
|
|
Work on Floor(s): CEL 001 thru 005
|
09/13/2018 |
123140145 |
01 |
A2 |
X SIGNED OFF |
11/06/2020 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
ALTERATION TYPE II FILING FOR UNDERPINNING,EXCAVATION AND FOUNDATIION & RE
|
|
Work on Floor(s): CEL 001 thru 005
|
02/02/2018 |
123140127 |
01 |
A2 |
X SIGNED OFF |
11/23/2020 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
ALTERATION TYPE II FILING FOR UNDERPINNING,EXCV
|
|
Work on Floor(s): CEL 001 thru 005
|
09/28/2017 |
140700711 |
01 |
A3 |
R PERMIT-ENTIRE |
10/02/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
09/28/2017 |
140700677 |
01 |
A3 |
R PERMIT-ENTIRE |
10/02/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
09/12/2017 |
123353325 |
01 |
A2 |
J P/E DISAPPROVED |
07/15/2022 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
PARTIAL DEMOLITION OF AN EXISTING FIVE (5) STORY BUILDING. WORK INCLUDES T
|
|
Work on Floor(s): CEL,FAC,ROF 001 thru 005
|
09/12/2017 |
123353316 |
01 |
A2 |
D A/P ENTIRE |
09/12/2017 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/24/2018 PARTIAL DEMOLITION OF AN EXISTING FOUR (4) STORY
|
|
Work on Floor(s): CEL,FAC,ROF 001 thru 004
|
07/24/2017 |
140663128 |
01 |
A3 |
J P/E DISAPPROVED |
07/26/2017 |
0016481 RA |
POON |
|
NOT APPLICABLE
|
|
HEREWITH FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW MIXED USE
|
|
Work on Floor(s): OSP
|
06/26/2017 |
140661068 |
01 |
A3 |
R PERMIT-ENTIRE |
06/24/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
06/26/2017 |
140661059 |
01 |
A3 |
R PERMIT-ENTIRE |
06/18/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
06/21/2017 |
140658321 |
01 |
A2 |
R PERMIT-ENTIRE |
12/13/2017 |
0087378 PE |
WANG |
|
NOT APPLICABLE
|
|
REMOVE GYPSUM BOARD OF EXISTING NON-LOAD-BEARING WALL ON CEL, 1ST THRU. 5T
|
|
Work on Floor(s): CEL 001 thru 004
|
05/12/2017 |
121190996 |
05 |
NB |
J P/E DISAPPROVED |
08/04/2017 |
0016481 RA |
POON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT MECHANICAL AND PLUMBIN
|
|
Work on Floor(s): SUB,CEL,TOW,ROF 001 thru 025
|
05/09/2017 |
140639664 |
01 |
A3 |
X SIGNED OFF |
05/08/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
05/06/2017 |
140638941 |
01 |
A3 |
X SIGNED OFF |
05/09/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
05/04/2017 |
121190996 |
04 |
NB |
P APPROVED |
08/30/2017 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT FOUNDATION WORK IN CON
|
|
Work on Floor(s): SUB,CEL,OSP
|
05/04/2017 |
121190996 |
03 |
NB |
J P/E DISAPPROVED |
08/04/2017 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/24/2018 HEREWITH FILING SUBSEQUENT STRUCTURAL WORK IN CON
|
|
Work on Floor(s): SUB,CEL,ROF,TOW 001 thru 025
|