| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
04/20/2011 |
110537385 |
PR |
I LAA SIGNED OFF |
05/24/2011 |
MP 000220 |
GANGI |
|
REMOVE HOT WATER BOILER & REPLACE WITH NEW AO SMITH 75 GALLON HWH MODEL#FC
|
|
Work on Floor(s): 007
|
09/11/2009 |
110274603 |
PR |
I LAA SIGNED OFF |
02/08/2010 |
MP 000220 |
GANGI |
|
REPLACE APPROX 55' X 4" BLK PIPE FROM EX'G MAIN GAS VALVE ON HOUSE SIDE OF
|
|
Work on Floor(s): CEL
|
07/17/2009 |
110271269 |
PR |
I LAA SIGNED OFF |
01/22/2010 |
MP 000220 |
GANGI |
|
TEST EXISTING GAS TO EXISTING BOILERS ON 2ND,5TH,6TH & 11 FLS. NO PIPING.
|
|
Work on Floor(s): 002,005,006,011
|
07/11/2005 |
102376135 |
PR |
I LAA SIGNED OFF |
03/14/2006 |
MP 011863 |
BRENNER |
|
INSTALL (1) ONE 3" RPZ DEVICE IN EXISTING DOMESTIC WATER SERVICE. 3" WATTS
|
|
Work on Floor(s): CEL
|
05/30/2002 |
102261393 |
PR |
I LAA SIGNED OFF |
06/17/2002 |
MP 008241 |
ISER |
|
INSTALL NEW GAS METER AND GAS PIPING FOR PROCESS BOILER USED FOR PRESSING
|
|
Work on Floor(s): 003
|