| 01/07/2019 |
123544469 |
02 |
A2 |
P APPROVED |
01/09/2019 |
|
VILLANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 12/20/2018 |
123154549 |
01 |
A2 |
X SIGNED OFF |
05/29/2019 |
0020199 RA |
BARUJEL |
|
NOT APPLICABLE
|
|
REPLACEMENT / RELOCATION OF 2 WASHERS AND DRYERS IN CELLAR. 2 SPRINKLER HE
|
|
Work on Floor(s): CEL
|
| 09/21/2018 |
123544469 |
01 |
A2 |
X SIGNED OFF |
01/28/2019 |
0031882 RA |
VILLANO |
|
NOT APPLICABLE
|
|
GROUND FLOOR LOBBY RENOVATION. INSTALL NEW FLOOR AND WALL TILES. NO CHANGE
|
|
Work on Floor(s): GRD
|
| 09/18/2018 |
123544441 |
01 |
A2 |
J P/E DISAPPROVED |
09/19/2018 |
0026432 RA |
ZABASAJJ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/27/2018 GROUND FLOOR LOBBY RENOVATION. INSTALL NEW FLOOR
|
|
Work on Floor(s): GRD
|
| 08/15/2018 |
123236774 |
03 |
A2 |
P APPROVED |
08/17/2018 |
|
BARUJEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 07/20/2018 |
123236774 |
02 |
A2 |
P APPROVED |
07/24/2018 |
|
BARUJEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 05/31/2018 |
123236774 |
01 |
A2 |
X SIGNED OFF |
12/07/2018 |
0020199 RA |
BARUJEL |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION TO APT. 1F (1ST FLOOR). PARTITIONS AND PLUMBING. NO C
|
|
Work on Floor(s): 001
|
| 04/25/2018 |
123442603 |
02 |
A2 |
P APPROVED |
05/01/2018 |
|
BARUJEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 04/11/2018 |
123442603 |
01 |
A2 |
X SIGNED OFF |
07/17/2018 |
0020199 RA |
BARUJEL |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION TO APT. 2F (2ND FLOOR). PARTITIONS AND PLUMBING. NO C
|
|
Work on Floor(s): 002
|
| 12/12/2016 |
140228108 |
04 |
A2 |
P APPROVED |
12/15/2016 |
|
CALIENDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 02/04/2016 |
140228108 |
03 |
A2 |
P APPROVED |
03/01/2016 |
|
CALIENDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/08/2015 |
140437070 |
01 |
A2 |
X SIGNED OFF |
09/14/2016 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
HEREWITH FILE ALTERATION TYPE 2 IN ORDER TO FILE SEPARATE APPLICATION FOR
|
|
Work on Floor(s): CEL
|
| 01/07/2015 |
140228108 |
02 |
A2 |
P APPROVED |
01/09/2015 |
|
CALIENDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 07/18/2014 |
140228108 |
01 |
A2 |
X SIGNED OFF |
01/10/2017 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
HEREWITH FILED AN ALTERATION TYPE 2 IN ORDER TO INSTALL NEW BOILER WITH HO
|
|
Work on Floor(s): CEL
|
| 07/18/2014 |
140228073 |
01 |
A2 |
H P/E IN PROCESS |
07/18/2014 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/18/2014 HERE WITH FILED AN ALTERATION TYPE 2 IN ORDER TO
|
|
Work on Floor(s): CEL
|
| 05/02/2014 |
121997205 |
01 |
A2 |
X SIGNED OFF |
08/20/2014 |
0084178 PE |
ALI |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE NEW PARTITION, REPLACE PLUMBING FIXTURES.
|
|
Work on Floor(s): 2ND
|
| 05/02/2014 |
121997214 |
01 |
A2 |
X SIGNED OFF |
08/21/2014 |
0084178 PE |
ALI |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE NEW PARTITION, REPLACE PLUMBING FIXTURES.
|
|
Work on Floor(s): 3RD
|
| 02/26/2014 |
140166950 |
01 |
A2 |
H P/E IN PROCESS |
02/26/2014 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 04/27/2014 HEREWITH FILED AN ALTERATION TYPE 2 IN ORDER TO IN
|
|
Work on Floor(s): CEL
|
| 08/22/2011 |
120801061 |
01 |
A3 |
R PERMIT-ENTIRE |
08/22/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 08/21/2009 |
120138118 |
01 |
A2 |
X SIGNED OFF |
05/20/2010 |
0020199 RA |
MARCELO |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION TO EXISTING BASEMENT APT. NEW PARTITIONS AND PLUMBIN
|
|
Work on Floor(s): BAS
|
| 03/14/2008 |
110100925 |
01 |
A3 |
R PERMIT-ENTIRE |
03/17/2008 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL SIDEWALK SHED A TOTAL OF 50 L.F AT 315 WEST 21ST STREET. DURING RE
|
|
Work on Floor(s): 1
|