| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/14/2018 |
123533658 |
02 |
A2 |
X SIGNED OFF |
04/16/2021 |
0067163 PE |
GORLIN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCIATED WITH THE TEMPORARY INSTALLATIONS IN THE THEATER
|
|
Work on Floor(s): 001
|
| 09/14/2018 |
123533658 |
01 |
A2 |
X SIGNED OFF |
04/16/2021 |
0012761 RA |
RUBIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF THE TEMPORARY PLATFORM AND TEMPORARY STAGE EXTENSION FOR T
|
|
Work on Floor(s): 001,MEZ
|
| 06/03/2016 |
122713705 |
02 |
A2 |
X SIGNED OFF |
10/20/2016 |
0067163 PE |
GORLIN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCIATED WITH THE TEMPORARY INSTALLATIONS IN THE THEATER
|
|
Work on Floor(s): 001
|
| 06/03/2016 |
122713705 |
01 |
A2 |
X SIGNED OFF |
10/20/2016 |
0012761 RA |
RUBIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF THE TEMPORARY PLATFORM FOR THE RUN OF THE EVENT. INSTALLAT
|
|
Work on Floor(s): 001,MEZ
|
| 09/12/2002 |
103262194 |
01 |
A2 |
X SIGNED OFF |
03/11/2003 |
0008355 RA |
Hardy |
|
NOT APPLICABLE
|
|
Renovationof existing conditions for installation of new ADA seating. Ther
|
|
Work on Floor(s): 001
|
| 08/27/1999 |
102249005 |
01 |
A2 |
R PERMIT-ENTIRE |
09/27/1999 |
0071502 PE |
FISHER |
|
NOT APPLICABLE
|
|
PROPOSE TO REPLACE THE EXISTING SMOKE DETECTION AND STAGE EMERGENCY/
|
|
Work on Floor(s): CEL,1
|
| 05/10/1999 |
102097561 |
01 |
A2 |
B A/P UNPAID |
05/10/1999 |
0024793 RA |
LEE |
|
NOT APPLICABLE
|
|
INSTALLATION OF WATER COOLING TOWER ON ROOF.
|
|
Work on Floor(s): 001 ROF
|
| 08/22/1995 |
101115286 |
01 |
A2 |
X SIGNED OFF |
06/13/1996 |
0010297 RA |
MELVIN |
|
NOT APPLICABLE
|
|
ROOFING INSTALLATION AS PER DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPAN
|
|
Work on Floor(s): ROF
|