 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/04/2013 |
120658430 |
05 |
A1 |
P APPROVED |
03/07/2016 |
|
WANTA |
|
GRANTED 08/25/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,PEN
|
| 04/02/2012 |
120658430 |
04 |
A1 |
P APPROVED |
04/16/2012 |
0698681 PE |
BENDIX |
|
GRANTED 08/25/2011
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 004,PEN
|
| 12/16/2011 |
120927630 |
01 |
A3 |
X SIGNED OFF |
04/29/2013 |
0023945 RA |
MAHLER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 002 thru 004
|
| 10/31/2011 |
120879291 |
01 |
A3 |
R PERMIT-ENTIRE |
12/15/2011 |
0023945 RA |
MAHLER |
Y |
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED PER PLANS. NO CHANGE IN USE,
|
|
Work on Floor(s): GRD
|
| 04/28/2011 |
120658430 |
01 |
A1 |
R PERMIT-ENTIRE |
04/16/2013 |
0016635 RA |
WANTA |
|
GRANTED 08/25/2011
|
|
RENOVATION OF 4TH FLOOR WALK-UP APARTMENT. WORK TO INCLUDE ADDITION OF
|
|
Work on Floor(s): 004,PEN
|
| 04/28/2011 |
120658430 |
03 |
A1 |
R PERMIT-ENTIRE |
09/19/2011 |
0045682 PE |
SCHMITT |
|
GRANTED 08/25/2011
|
|
Work on Floor(s): 004,PEN
|
| 04/28/2011 |
120658430 |
02 |
A1 |
R PERMIT-ENTIRE |
12/23/2011 |
0698681 PE |
BENDIX |
|
GRANTED 08/25/2011
|
|
Work on Floor(s): 004,PEN
|
| 06/16/2010 |
120384663 |
01 |
A2 |
X SIGNED OFF |
08/11/2011 |
0022011 RA |
DAVIES |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF 3RD FLOOR APARTMENT. NO CHANGE IN USE, EGRESS OR OC
|
|
Work on Floor(s): 003
|
| 03/23/2007 |
104708096 |
01 |
A3 |
X SIGNED OFF |
05/14/2014 |
0080123 PE |
ALTAF |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 07/20/1998 |
101900374 |
01 |
A2 |
X SIGNED OFF |
07/10/2013 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND BURNER.
|
|
Work on Floor(s): CEL
|