![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B373938 | ||
| NO JOBS FOUND WITH YOUR CRITERIA | ||
| Premises: 148 SOUTH 4 STREET BROOKLYN | BIN: 3063442 Block: 2444 Lot: 18 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 152 S 4 ST | Census Tract: 549 | Health Area: 0500 | |
| SIDEWALK | Admin Area: B - BROOKLYN | Inspection Area: B | ||
| BROOKLYN, NY 11211 | Community Board: 301 | |||
| DOB Cross Street(s): BEDFORD AVENUE, DRIGGS AVENUE | |||
| Status: C - JOB IS SIGNED OFF 12/21/2015 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/24/2013 12:10 PM | |
| Application Entered: 10/24/2013 | Job Start Date: 10/24/2013 | ||
| Last Change: 12/21/2015 | Job End Date: 11/24/2013 | ||
| Appointment Status: | |||
| Last Inspection By: ASHMAN, K. On 12/01/2015 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012335 | Licensee Name: | TROADIO MENENDEZ | |
| Firm: | 004119 | Firm Name: | AURORA ELECL CONTG INC | |
| Firm Phone: | 718-237-2527 | Firm Address: | 1640 CENTRE STREET RIDGEWOOD NY 11385 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: MIXED USE-8 | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ISAAC ADLER | ||||||
| Owner Business Name: | SILVERCUP SCAFFOLDING | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 3 | 1 | ||||||||||
| Buildings Total | 3 | 1 | ||||||||||
| Total Units : 4 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 06/16/2015 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALLED LIGHTING AND GENERAL WIRING FOR SIDEWALK SHED. | |||
|
|
| *NO JOBS FOUND WITH YOUR CRITERIA |