| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/02/2025 |
123394086 |
19 |
A1 |
P APPROVED |
10/06/2025 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 12/19/2024 |
123394086 |
18 |
A1 |
P APPROVED |
12/27/2024 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 10/24/2024 |
123394086 |
17 |
A1 |
P APPROVED |
10/25/2024 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 09/16/2024 |
123394086 |
16 |
A1 |
P APPROVED |
10/09/2024 |
|
ALLEN |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 003
|
| 09/05/2024 |
123394086 |
15 |
A1 |
P APPROVED |
09/23/2024 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 07/16/2024 |
123394086 |
14 |
A1 |
P APPROVED |
07/18/2024 |
|
ALLEN |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 003
|
| 01/26/2024 |
123394086 |
13 |
A1 |
P APPROVED |
02/01/2024 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 07/28/2023 |
123394086 |
12 |
A1 |
P APPROVED |
08/17/2023 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 02/22/2023 |
123394086 |
11 |
A1 |
P APPROVED |
03/02/2023 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 07/15/2022 |
123394086 |
10 |
A1 |
P APPROVED |
07/25/2022 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 06/17/2022 |
123394086 |
09 |
A1 |
P APPROVED |
07/07/2022 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 06/23/2021 |
123394086 |
08 |
A1 |
P APPROVED |
06/25/2021 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 05/27/2021 |
123394086 |
07 |
A1 |
P APPROVED |
06/03/2021 |
0065067 PE |
GILSANZ |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,BAS,OSP,ROF 001 thru 003
|
| 05/27/2021 |
123394086 |
06 |
A1 |
P APPROVED |
06/03/2021 |
0065067 PE |
GILSANZ |
|
AMENDED 08/09/2018
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF
|
| 05/24/2021 |
123394086 |
05 |
A1 |
G PAA FEE DUE |
05/24/2021 |
0065067 PE |
GILSANZ |
|
AMENDED 08/09/2018
|
|
DOC WITHDRAWN 05/24/2021
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF
|
| 11/30/2018 |
123394086 |
02 |
A1 |
X SIGNED OFF |
12/02/2025 |
0065067 PE |
GILSANZ |
|
AMENDED 08/09/2018
|
|
STRUCTURAL WORK ASSOCIATED WITH COMBINATION OF BUILDINGS 75 AND 77 JANE ST
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF
|
| 10/29/2018 |
123394086 |
04 |
A1 |
X SIGNED OFF |
12/02/2025 |
0065067 PE |
GILSANZ |
|
AMENDED 08/09/2018
|
|
SUPPORT OF EXCAVATION; UNDERPINNING; SHORING/BRACING ASSOCIATED WITH RENOV
|
|
Work on Floor(s): CEL,BAS,OSP,ROF 001 thru 003
|
| 05/17/2018 |
123394086 |
03 |
A1 |
X SIGNED OFF |
12/02/2025 |
0065067 PE |
VELTRE |
|
AMENDED 08/09/2018
|
|
MECHANICAL, PLUMBING AND SPRINKLER WORK ASSOCIATED WITH COMBINATION OF BUI
|
|
Work on Floor(s): 1-3,CEL,BAS,ROF,OSP
|
| 05/17/2018 |
123394086 |
01 |
A1 |
X SIGNED OFF |
12/02/2025 |
0019999 RA |
ALLEN |
|
AMENDED 08/09/2018
|
|
GUT RENOVATION AND CONVERSION OF EXISTING 4-FAMILY BUILDING AT 77 JANE ST.
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 003
|
| 04/01/2016 |
120384440 |
07 |
A1 |
P APPROVED |
04/14/2016 |
0036871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/17/2014 |
121872517 |
01 |
A3 |
X SIGNED OFF |
01/29/2015 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
| 03/03/2014 |
120384440 |
06 |
A1 |
P APPROVED |
03/05/2014 |
|
ALLEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 02/20/2014 |
121905974 |
01 |
A3 |
X SIGNED OFF |
01/22/2015 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF 30 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 01/13/2014 |
120384440 |
05 |
A1 |
P APPROVED |
03/05/2014 |
0036871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 07/15/2013 |
121470540 |
02 |
A2 |
P APPROVED |
05/22/2014 |
|
SAGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,BAS
|
| 12/26/2012 |
121470540 |
01 |
A2 |
X SIGNED OFF |
06/16/2014 |
0017736 RA |
SAGE |
|
NOT APPLICABLE
|
|
SHORING SEQUENCING @ FRONT COURT EXCAVATION AND FRONT COURT AND STOOP CONC
|
|
Work on Floor(s): 001,BAS
|
| 03/22/2012 |
121016211 |
01 |
A2 |
X SIGNED OFF |
09/16/2015 |
0031558 RA |
MELONE |
|
NOT APPLICABLE
|
|
INSTALL FOUR (4) FIREBOXES AND CHIMNEY FLUES AS SPECIFIED IN THE DRAWINGS
|
|
Work on Floor(s): BAS,ROF 001 thru 004
|
| 12/14/2011 |
120384440 |
04 |
A1 |
P APPROVED |
02/10/2012 |
0036871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/15/2011 |
120792669 |
01 |
A2 |
X SIGNED OFF |
03/20/2015 |
0060234 PE |
CAMBOURA |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK TO INCLUDE SHORING IN THE BACKYARD OF A SINGLE-FAMILY BUIL
|
|
Work on Floor(s): OSP
|
| 03/22/2011 |
120639274 |
01 |
A2 |
X SIGNED OFF |
07/30/2015 |
0060234 PE |
CAMBOURA |
|
NOT APPLICABLE
|
|
UNDERPINNING OF EXISTING EAST & WEST WALLS AT REAR OF BUILDING AND SUPPORT
|
|
Work on Floor(s): CEL
|
| 08/27/2010 |
120456489 |
01 |
A3 |
X SIGNED OFF |
01/22/2015 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): OSP
|
| 08/26/2010 |
120384440 |
03 |
A1 |
X SIGNED OFF |
08/11/2017 |
0052369 PE |
ANASTOS |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK ASSOCIATED WITH BUILDING RENOVATION FOR SINGLE FAMILY USE.
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/26/2010 |
120384440 |
02 |
A1 |
X SIGNED OFF |
08/11/2017 |
0036871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
MECHANICAL & PLUMBING WORK ASSOCIATED WITH BUILDING RENOVATION FOR SINGLE
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/04/2010 |
120351671 |
02 |
A2 |
P APPROVED |
08/09/2010 |
|
ANASTOS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/17/2010 |
120384440 |
01 |
A1 |
X SIGNED OFF |
08/11/2017 |
0019999 RA |
ALLEN |
|
NOT APPLICABLE
|
|
RENOVATION OF ENTIRE BUILDING TO CONVERT FROM MULTIPLE DWELLING TO SINGLE
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 05/13/2010 |
120351671 |
01 |
A2 |
X SIGNED OFF |
07/30/2015 |
0052369 PE |
ANASTOS |
|
NOT APPLICABLE
|
|
INTERIOR STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. WORK FILED
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/22/2010 |
120298793 |
01 |
A3 |
X SIGNED OFF |
01/22/2015 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD WILL NOT BE TIED INTO
|
|
Work on Floor(s): OSP
|
| 03/19/2010 |
120294582 |
01 |
A3 |
X SIGNED OFF |
01/22/2015 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF 21 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 12/11/2008 |
104744305 |
04 |
A2 |
P APPROVED |
12/17/2008 |
|
PEASLEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001
|
| 09/23/2008 |
104744305 |
03 |
A2 |
P APPROVED |
10/10/2008 |
|
PEASLEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001
|