| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/07/2017 |
122729896 |
02 |
A2 |
P APPROVED |
08/23/2017 |
|
ACHESON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/06/2020
|
|
Work on Floor(s): FAC
|
| 01/04/2017 |
122986260 |
01 |
A3 |
X SIGNED OFF |
09/26/2018 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLD 23' LONG BY 75' HIGH DURING FACADE
|
|
Work on Floor(s): OSP
|
| 01/04/2017 |
122986251 |
01 |
A3 |
X SIGNED OFF |
09/26/2018 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 29' LONG BY 10' WIDE BY 12' HIGH
|
|
Work on Floor(s): OSP
|
| 01/04/2017 |
122986279 |
01 |
A3 |
X SIGNED OFF |
09/26/2018 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF MATERIAL HOIST DURING FACADE RESTORATION. HOIST TO COMPLY
|
|
Work on Floor(s): OSP
|
| 04/13/2016 |
122729896 |
01 |
A2 |
R PERMIT-ENTIRE |
05/17/2017 |
0015257 RA |
ACHESON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/06/2020 FACADE RESTORATION AS PER PLANS FILED HEREWITH. N
|
|
Work on Floor(s): FAC
|
| 11/15/2010 |
120532263 |
01 |
A3 |
X SIGNED OFF |
03/20/2014 |
0082098 PE |
ABOUZID |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 22LF OF PIPE SCAFFOLD FOR REMEDIAL REPAIR WORK. T
|
|
Work on Floor(s): FAC
|
| 09/28/2010 |
120486107 |
01 |
A2 |
J P/E DISAPPROVED |
10/14/2010 |
0077618 PE |
KLEINSMI |
|
NOT APPLICABLE
|
|
EXTERIOR RESTORATION CONSISTING OF BROWNSTONE FASCIA REMOVAL AND APPLICATI
|
|
Work on Floor(s): EXT
|
| 04/02/2010 |
120306980 |
01 |
A3 |
X SIGNED OFF |
07/25/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 31 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 08/24/1999 |
102462407 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/24/1999 |
0053541 PE |
Hahn |
|
NOT APPLICABLE
|
|
Install fire suppression system, as shown on plan.
|
|
Work on Floor(s): 001
|