FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
10/02/2020 |
123480982 |
05 |
A2 |
P APPROVED |
10/05/2020 |
|
BERMAN |
|
GRANTED 07/18/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 002
|
12/26/2019 |
123480982 |
04 |
A2 |
P APPROVED |
01/06/2020 |
|
ZIRINO |
|
GRANTED 07/18/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 002
|
07/30/2019 |
140862421 |
01 |
A3 |
X SIGNED OFF |
08/05/2020 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
SHORING SYSTEM PROPOSED INSTALLATION OF SHORING SYSTEM AS PER PLAN. NO CH
|
|
Work on Floor(s): OSP
|
01/24/2019 |
123480982 |
01 |
A2 |
R PERMIT-ENTIRE |
10/05/2020 |
0036223 RA |
BERMAN |
|
GRANTED 07/18/2019
|
|
ARCHITECTURAL WORK FOR BASEMENT, 1ST AND 2ND FLOOR. HORIZONTAL ENLARGEMENT
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 002
|
01/24/2019 |
123480982 |
03 |
A2 |
R PERMIT-ENTIRE |
10/24/2019 |
0090312 PE |
ZIRINO |
|
GRANTED 07/18/2019
|
|
MECHANICAL AND PLUMBING WORK PER PLANS FILED. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 002
|
01/24/2019 |
123480982 |
02 |
A2 |
R PERMIT-ENTIRE |
09/20/2019 |
0084636 PE |
GREGG |
|
GRANTED 07/18/2019
|
|
STRUCTURAL WORK FOR HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION. NO CHA
|
|
Work on Floor(s): BAS,ROF 001 thru 002
|
12/06/2018 |
123439485 |
01 |
A2 |
X SIGNED OFF |
02/13/2020 |
0036223 RA |
BERMAN |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION WORK AND FRAMING. NO CHANGE IN USE EGRESS OR OCCUPANCY
|
|
Work on Floor(s): BAS 001 thru 002
|
02/04/2011 |
120600536 |
01 |
A2 |
X SIGNED OFF |
10/11/2011 |
0011690 RA |
ATTICK |
|
NOT APPLICABLE
|
|
RENOVATE APT 4F INCLUDING KITCHEN AND BATH NO CHANGE TO USE OCCUPANCY
|
|
Work on Floor(s): 004
|
02/10/2003 |
103367606 |
01 |
A3 |
R PERMIT-ENTIRE |
12/08/2003 |
|
ZAHARIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED, 24', DURING FACADE REPAIR.
|
|
Work on Floor(s): GRD
|
09/30/2002 |
103275377 |
01 |
A2 |
R PERMIT-ENTIRE |
02/25/2005 |
0017098 RA |
NELLIGAN |
|
NOT APPLICABLE
|
|
BUILDING EXTERIOR RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 005
|
05/26/2000 |
102633018 |
04 |
A1 |
P APPROVED |
03/01/2001 |
0068239 PE |
DONOLLI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/15/2014 INSTALL NEW PLUMBING FIXTURES AND PIPING AS SHOWN
|
|
Work on Floor(s): CEL,BAS,1
|
05/26/2000 |
102633018 |
03 |
A1 |
P APPROVED |
03/01/2001 |
0068239 PE |
DONOLLI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/15/2014 INSTALL NEW MECHANICAL EQUIPMENT PIPING AND DUCTW
|
|
Work on Floor(s): CEL,BAS,1
|
05/26/2000 |
102633018 |
02 |
A1 |
P APPROVED |
03/01/2001 |
0067391 PE |
HAGE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/15/2014 CONSTRUCT NEW ADDITION AT REAR OF BUILDING AT CEL
|
|
Work on Floor(s): CEL,BAS,1
|
05/26/2000 |
102633018 |
01 |
A1 |
P APPROVED |
03/01/2001 |
0017096 RA |
Nelligan |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/15/2014 Construct new rear addition at cellar, basement a
|
|
Work on Floor(s): CEL,BAS,001
|
12/01/1998 |
102194279 |
01 |
A2 |
X SIGNED OFF |
02/23/2000 |
0071083 PE |
SALAM |
|
NOT APPLICABLE
|
|
RELOCATION CHIMNEY EXHAUST PIPES
|
|
Work on Floor(s): ROF
|
06/19/1998 |
101826785 |
01 |
A1 |
P APPROVED |
09/01/2000 |
0018876 RA |
BERGER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/04/2014 NO WORK TO BE PERFORMED. THIS APPLICATION IS FILE
|
|
Work on Floor(s): BAS 001 thru 004
|
06/20/1994 |
100817528 |
01 |
A1 |
X SIGNED OFF |
08/10/2001 |
0066969 PE |
ZORAKHSH |
|
NOT APPLICABLE
|
|
CONVERSION OF BASEMENT FLOOR TO STORE BY ELEMINATING SHOWER &
|
|
Work on Floor(s): BNM,1FL
|