 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/02/2017 |
140635748 |
01 |
A3 |
R PERMIT-ENTIRE |
05/12/2017 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 04/25/2017 |
140632965 |
01 |
A3 |
R PERMIT-ENTIRE |
05/01/2017 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 04/21/2017 |
140632947 |
01 |
A3 |
H P/E IN PROCESS |
04/21/2017 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/28/2017 PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD
|
|
Work on Floor(s): OSP
|
| 11/03/2016 |
122935379 |
01 |
A2 |
X SIGNED OFF |
06/07/2019 |
0028990 RA |
UYO |
|
NOT APPLICABLE
|
|
MASONRY FACADE WORK, WOOD DOOR REPLACEMENT AND AREAWAY WORK AS PER PLANS.
|
|
Work on Floor(s): 001 thru 006
|
| 06/21/2016 |
122810716 |
01 |
A2 |
R PERMIT-ENTIRE |
06/21/2016 |
0026392 RA |
GUARDIA |
|
NOT APPLICABLE
|
|
REMOVE AND CAP 2 WASHING MACHINES/RELATED HOT AND COLD WATER PIPING AND 2
|
|
Work on Floor(s): CEL
|
| 06/10/2009 |
120053976 |
01 |
A2 |
X SIGNED OFF |
10/28/2009 |
0011222 RA |
COHAN, R |
|
NOT APPLICABLE
|
|
HEREBY REQUESTING TO PERFORM REQUIRED ROUTINE FACADE WORK CONSISTING OF BR
|
|
Work on Floor(s): FAC
|
| 10/02/2007 |
104914256 |
01 |
A3 |
R PERMIT-ENTIRE |
09/24/2008 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 42' DURING FACADE REPAIR. NO CH
|
|
Work on Floor(s): 001
|
| 12/09/1994 |
100953158 |
01 |
A3 |
X SIGNED OFF |
01/26/1995 |
0204781 RA |
LEDER-LU |
|
NOT APPLICABLE
|
|
APPAILC. SUBMITTED FOR APPROVAL FOR THE INSTALLATION OF A REAR COURTYARD
|
|
Work on Floor(s): 1
|