| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/08/2023 |
102770137 |
04 |
PA |
P APPROVED |
07/05/2023 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 004
|
| 05/05/2023 |
123127213 |
08 |
A2 |
P APPROVED |
05/22/2023 |
|
BASLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 05/05/2023 |
123127213 |
07 |
A2 |
P APPROVED |
05/19/2023 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,002,003,005
|
| 08/02/2019 |
123127213 |
06 |
A2 |
P APPROVED |
08/12/2019 |
|
BASLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION OF EXISTING COMMERCIAL ESTABLISH
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 04/17/2019 |
123403110 |
02 |
A2 |
P APPROVED |
08/09/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 04/09/2019 |
123127213 |
05 |
A2 |
P APPROVED |
08/06/2019 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,002,003,005
|
| 04/09/2019 |
123127213 |
04 |
A2 |
D A/P ENTIRE |
07/11/2019 |
|
BASLER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/09/2019 RENOVATION OF EXISTING COMMERCIAL ESTABLISHMENT I
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 10/09/2018 |
123127213 |
03 |
A2 |
P APPROVED |
10/12/2018 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,002,003,005
|
| 08/20/2018 |
123403110 |
01 |
A2 |
R PERMIT-ENTIRE |
10/22/2018 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 08/20/2018 |
123127213 |
02 |
A2 |
X SIGNED OFF |
04/01/2024 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
MECHANICAL, PLUMBING AND SPRINKLER WORK ASSOCIATED WITH TENANT IMPROVEMENT
|
|
Work on Floor(s): CEL,001,002,003,005
|
| 08/20/2018 |
123127213 |
01 |
A2 |
X SIGNED OFF |
04/01/2024 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING COMMERCIAL ESTABLISHMENT INCLUDING INTERIOR DEMOLIT
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 10/20/2014 |
122161926 |
01 |
A2 |
X SIGNED OFF |
12/24/2014 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF ROOFTOP UNITS. THERE WILL BE NO CHANGE IN USE EGRESS OR
|
|
Work on Floor(s): ROF
|
| 03/19/2012 |
121012723 |
01 |
A2 |
X SIGNED OFF |
12/03/2012 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF THE AIR AIR CONDITIONING UNIT INSTALATION. THERE WILL BE NO
|
|
Work on Floor(s): ROF
|
| 08/29/2011 |
102770137 |
03 |
PA |
P APPROVED |
09/27/2011 |
|
ADJAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 004
|
| 03/10/2010 |
120288036 |
01 |
A1 |
X SIGNED OFF |
11/28/2011 |
0020177 RA |
ADJAH |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO UPDATE BSA APPROVAL ISSUED FOR EXISTING PHYSICAL CULT
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 05/08/2009 |
102770137 |
02 |
PA |
P APPROVED |
07/09/2009 |
0201771 |
ADJAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 004
|
| 02/23/2009 |
110459423 |
02 |
A2 |
X SIGNED OFF |
06/17/2009 |
0066073 PE |
GUTH |
|
NOT APPLICABLE
|
|
MODIFY EXISTING SUPPLY/EXHUAST DUCTWORK AND NEW AIR SUPPLY DUCT;REMOVE EXI
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/23/2009 |
110459423 |
01 |
A2 |
X SIGNED OFF |
06/17/2009 |
0201771 RA |
ADJAH |
|
NOT APPLICABLE
|
|
DEMOLITION AND GENERAL CONSTRUCTION OF INTERIOR RENOVATION OF THE 3RD FLOO
|
|
Work on Floor(s): CEL 001 thru 004
|
| 12/05/2008 |
110292184 |
03 |
A2 |
P APPROVED |
12/08/2008 |
|
GUTH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 07/28/2008 |
110288206 |
01 |
A2 |
R PERMIT-ENTIRE |
09/08/2008 |
0066073 PE |
GUTH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2009 MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS SHO
|
|
Work on Floor(s): 001
|
| 07/25/2008 |
110292184 |
02 |
A2 |
X SIGNED OFF |
05/27/2009 |
0066073 PE |
GUTH |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING IN ASSOCIATION WITH INITIAL FILING.
|
|
Work on Floor(s): 001
|
| 07/25/2008 |
110292184 |
01 |
A2 |
X SIGNED OFF |
05/27/2009 |
0201771 RA |
ADJAH |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING COMMERCIAL SPACE TO INCLUDE MINOR RENOVATION OF LOB
|
|
Work on Floor(s): 001
|
| 07/25/2008 |
110292013 |
01 |
A2 |
X SIGNED OFF |
04/06/2009 |
0066073 PE |
GUTH |
|
NOT APPLICABLE
|
|
MODISFICATION TO SPRINKLER SYSTEMS
|
|
Work on Floor(s): 001
|
| 01/18/2008 |
110074507 |
01 |
A2 |
X SIGNED OFF |
02/13/2008 |
0019868 RA |
SEARAGE |
|
NOT APPLICABLE
|
|
REPLACEMENT OF ROOF MOUNTED AIR CONDITIONING UNIT ON EXISTING ROOF CURB, A
|
|
Work on Floor(s): ROF
|
| 11/06/2002 |
103304443 |
01 |
SG |
X SIGNED OFF |
08/09/2011 |
0020822 RA |
ILL |
|
NOT APPLICABLE
|
|
NON ILLUMINATED NON ADVERTISING DOUBLE FACE PROJECTING ACCESSORY WALL SIGN
|
|
Work on Floor(s): 001
|
| 04/09/2002 |
103134500 |
01 |
A2 |
X SIGNED OFF |
08/03/2011 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALL MASTER CODED IFA. ALL FEES PAID UNDER APPLI. #102896421. NO
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 12/06/2001 |
102897509 |
06 |
A2 |
P APPROVED |
12/07/2001 |
0014690 RA |
STUMER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 1 thru 4
|
| 12/05/2001 |
102770128 |
06 |
A2 |
P APPROVED |
12/17/2001 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
| 12/04/2001 |
102897509 |
05 |
A2 |
P APPROVED |
12/07/2001 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): C, RF 001 thru 004
|
| 12/04/2001 |
102770128 |
05 |
A2 |
P APPROVED |
12/17/2001 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 11/29/2001 |
102009728 |
03 |
A1 |
P APPROVED |
12/10/2001 |
0018176 RA |
DOVELL, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,MEZ,004
|
| 11/05/2001 |
102009728 |
02 |
A1 |
J P/E DISAPPROVED |
11/19/2001 |
0018176 RA |
DOVELL J |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/03/2001
|
|
Work on Floor(s): CEL,001,002,003,MEZ,004
|
| 03/08/2001 |
102770128 |
04 |
A2 |
P APPROVED |
03/19/2001 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 03/07/2001 |
102770128 |
03 |
A2 |
D A/P ENTIRE |
03/07/2001 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/27/2002
|
| 02/05/2001 |
102897509 |
04 |
A2 |
P APPROVED |
02/13/2001 |
0018176 RA |
DOVELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002,003,004
|
| 12/27/2000 |
102933346 |
01 |
A3 |
X SIGNED OFF |
08/05/2011 |
OT |
Hallick |
|
NOT APPLICABLE
|
|
Erect 200' of Heavy Duty Sidewalk Shed 300 psf for protecion during demoli
|
|
Work on Floor(s): 001
|
| 09/27/2000 |
102896403 |
02 |
A2 |
X SIGNED OFF |
04/17/2001 |
0018176 RA |
DOVELL |
|
NOT APPLICABLE
|
|
FILING FOR TEMPOARY FENCE, INSTALLATION ASSOCIATED WITH RELATED DEMO
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/21/2000 |
102770137 |
01 |
PA |
U COMPLETED |
01/16/2002 |
0030312 RA |
BASLER |
|
NOT APPLICABLE
|
|
Work on Floor(s): 002 thru 004
|
| 09/14/2000 |
102770592 |
01 |
A3 |
J P/E DISAPPROVED |
09/19/2000 |
0018176 RA |
DOVELL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/17/2002 FILING FIRE PROTECTION PLAN.
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/12/2000 |
102897509 |
03 |
A2 |
X SIGNED OFF |
06/26/2002 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
HVAC AND PLUMBING MODIFICATIONS AS PER P LANS. NO CHANGE TO USE,EGRESS
|
|
Work on Floor(s): C, RF 001 thru 004
|