| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/10/2018 |
121185010 |
14 |
A1 |
P APPROVED |
09/11/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 04/02/2018 |
121185010 |
13 |
A1 |
P APPROVED |
04/06/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 03/19/2018 |
121185010 |
12 |
A1 |
P APPROVED |
03/23/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 03/12/2018 |
121185010 |
11 |
A1 |
D A/P ENTIRE |
09/24/2018 |
0069888 PE |
OPPENHEI |
|
AMENDED 04/08/2015
|
|
DOC WITHDRAWN 09/26/2018
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 03/12/2018 |
121185010 |
10 |
A1 |
P APPROVED |
03/16/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 01/22/2018 |
121185010 |
09 |
A1 |
P APPROVED |
02/08/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 08/14/2017 |
121185010 |
08 |
A1 |
P APPROVED |
08/23/2017 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 07/05/2017 |
140266593 |
03 |
A2 |
P APPROVED |
07/21/2017 |
|
TENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,0PH 001 thru 003
|
| 06/16/2017 |
121185010 |
07 |
A1 |
P APPROVED |
06/22/2017 |
|
GARTNER |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 05/02/2017 |
121185010 |
06 |
A1 |
P APPROVED |
05/09/2017 |
|
GARTNER |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 11/10/2016 |
121185010 |
05 |
A1 |
P APPROVED |
11/25/2016 |
|
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 06/16/2016 |
140266593 |
02 |
A2 |
P APPROVED |
04/17/2017 |
|
TENG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,0PH 001 thru 003
|
| 06/15/2016 |
121185010 |
04 |
A1 |
P APPROVED |
09/28/2016 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 06/10/2016 |
122795528 |
01 |
A2 |
X SIGNED OFF |
05/01/2018 |
0090884 PE |
SHIM |
|
NOT APPLICABLE
|
|
FILING HEREWITH TEMPORARY BRACING FILING AND SUPPORT OF EXCAVATIONS
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 03/31/2016 |
140477473 |
01 |
A3 |
X SIGNED OFF |
01/24/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 03/31/2016 |
140477464 |
01 |
A3 |
X SIGNED OFF |
01/24/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 10/10/2014 |
140266593 |
01 |
A2 |
X SIGNED OFF |
06/27/2018 |
0076468 PE |
TENG |
|
NOT APPLICABLE
|
|
MODIFICATION/ADDITION OF EXISTING SPRINKLER SYSTEM.
|
|
Work on Floor(s): SUB,CEL,0PH 001 thru 003
|
| 10/02/2014 |
121185010 |
03 |
A1 |
X SIGNED OFF |
10/29/2018 |
0069888 PE |
OPPENHEI |
|
AMENDED 04/08/2015
|
|
STRUCTURAL WORK AS SHOWN ON DRAWINGS
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 10/02/2014 |
121185010 |
02 |
A1 |
X SIGNED OFF |
10/29/2018 |
0076468 PE |
TENG |
|
AMENDED 04/08/2015
|
|
MECHANICAL/PLUMBING WORK AS SHOWN ON DRAWINGS
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|
| 03/20/2014 |
121185010 |
01 |
A1 |
X SIGNED OFF |
10/29/2018 |
0020352 RA |
GARTNER |
|
AMENDED 04/08/2015
|
|
GENERAL CONSTRUCTION ASSOCIATED WITH CHANGE OF OCCUPANCY FROM TWO FAMILY T
|
|
Work on Floor(s): SUB,CEL,PH 001 thru 003
|