| 01/03/2012 |
120080893 |
16 |
A2 |
P APPROVED |
04/25/2012 |
|
HUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 01/04/2011 |
120080893 |
15 |
A2 |
P APPROVED |
01/12/2011 |
|
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 10/12/2010 |
120080893 |
14 |
A2 |
P APPROVED |
10/15/2010 |
|
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 09/29/2010 |
120080893 |
13 |
A2 |
P APPROVED |
10/06/2010 |
|
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 09/27/2010 |
120080893 |
12 |
A2 |
P APPROVED |
09/28/2010 |
|
HUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 09/22/2010 |
120304679 |
04 |
A1 |
P APPROVED |
09/24/2010 |
0052024 PE |
TAUBERER |
|
GRANTED 06/23/2010
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 03/29/2010 |
120304679 |
03 |
A1 |
X SIGNED OFF |
09/25/2012 |
0052024 PE |
TAUBERER |
|
GRANTED 06/23/2010
|
|
SHORING, BRACING, EXCAVATION AND UNDERPINNING WITH THE ADDITION OF A CELLA
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 03/29/2010 |
120304679 |
02 |
A1 |
X SIGNED OFF |
09/25/2012 |
0052024 PE |
TAUBERER |
|
GRANTED 06/23/2010
|
|
STRUCTURAL WORK IN CONJUNCTION WITH THE ADDITION OF A CELLAR AND CHANGE OF
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 03/29/2010 |
120304679 |
01 |
A1 |
X SIGNED OFF |
09/25/2012 |
0017011 RA |
HUT |
|
GRANTED 06/23/2010
|
|
ADDITION OF A CELLAR AND CHANGE OF EGRESS IN A TWO FAMILY DWELLING.
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 01/05/2010 |
120080893 |
11 |
A2 |
P APPROVED |
01/11/2010 |
|
IRWIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 01/05/2010 |
120080893 |
10 |
A2 |
P APPROVED |
01/11/2010 |
|
OPPENHEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 01/05/2010 |
120080893 |
09 |
A2 |
P APPROVED |
01/11/2010 |
|
HUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 11/10/2009 |
120137930 |
02 |
A3 |
P APPROVED |
11/12/2009 |
|
ALTAF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/14/2009 |
120080893 |
08 |
A2 |
P APPROVED |
09/18/2009 |
|
HUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 08/21/2009 |
120137930 |
01 |
A3 |
X SIGNED OFF |
11/29/2011 |
0080123 PE |
ALTAF |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD ON TOP OF SHED AS PER PLAN AT 247 WEST 4 STREET. DURIN
|
|
Work on Floor(s): OSP
|
| 08/21/2009 |
120137912 |
01 |
A3 |
X SIGNED OFF |
11/04/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 33 L.F. AS PER PLAN AT
|
|
Work on Floor(s): OSP
|
| 08/14/2009 |
120080893 |
05 |
A2 |
P APPROVED |
09/11/2009 |
0064012 PE |
VALERIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 08/14/2009 |
120080893 |
07 |
A2 |
P APPROVED |
09/11/2009 |
|
OPPENHEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 08/14/2009 |
120080893 |
06 |
A2 |
P APPROVED |
09/11/2009 |
|
HUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 06/23/2009 |
120080893 |
04 |
A2 |
X SIGNED OFF |
08/22/2012 |
0064012 PE |
VALERIO |
|
NOT APPLICABLE
|
|
SHORING AND EXCAVATION WORK IN CONJUNCTION WITH THE RENOVATION OF AN EXIST
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
| 06/23/2009 |
120080893 |
03 |
A2 |
X SIGNED OFF |
08/22/2012 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH THE INTERIOR AND EXTERI
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 06/23/2009 |
120080893 |
02 |
A2 |
X SIGNED OFF |
08/22/2012 |
0063871 PE |
IRWIN |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR AND EXTERIOR
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 06/23/2009 |
120080893 |
01 |
A2 |
X SIGNED OFF |
08/22/2012 |
0017011 RA |
HUT |
|
NOT APPLICABLE
|
|
INTERIOR AND EXTERIOR RENOVATION OF AN EXISTING 2 FAMILY RESIDENCE.
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 003
|
| 11/17/2008 |
110392218 |
01 |
A2 |
X SIGNED OFF |
05/25/2011 |
0017011 RA |
HUT |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF AN EXISTING TWO FAMILY TOWNHOUSE. ARCHITECTURAL AND
|
|
Work on Floor(s): CEL,001,002,003,PEN
|
| 03/26/2001 |
102295785 |
01 |
A1 |
Q PERMIT-PARTIAL |
04/20/2001 |
0043307 PE |
CALL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/16/2011 CONVERT EXISTING TWO FAMILY DWELLING INT O A FAMI
|
|
Work on Floor(s): BSM,PEN,2
|