 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/18/2018 |
123563063 |
PR |
E LAA FILED |
09/27/2018 |
MP 001895 |
RASOLE |
|
IN CELLAR, DIRECT REPLACEMENT ON EXISTING ROUGHING, 4 GAS DRYERS.ALL WORK
|
|
Work on Floor(s): CEL
|
| 06/19/2018 |
140776729 |
PR |
E LAA FILED |
06/19/2018 |
MP 000497 |
EHRLICH |
|
TO REMOVE AND CAP WATER & SANITARY WASTE PLUMBING FIXTURES AND GAS FIXTURE
|
|
Work on Floor(s): CEL
|
| 05/11/2018 |
123281215 |
PR |
I LAA SIGNED OFF |
09/07/2018 |
FSC 000219 |
TEWARI |
|
FURNISH& INSTALL(4)SPRINKLER HEADS WITH THE INSTALLATION OF 20 FEET OF 1"
|
|
Work on Floor(s): BAS
|
| 07/19/2017 |
122589564 |
PR |
I LAA SIGNED OFF |
08/28/2017 |
MP 001537 |
KORBL JR |
|
EWN#13752 CON EDISON CASE #MC-288177. TO PERFORM 3LB PRESSURE TEST OF ALL
|
|
Work on Floor(s): CEL
|
| 11/09/2010 |
110521007 |
PR |
I LAA SIGNED OFF |
03/15/2011 |
MP 001537 |
KORBL JR |
|
TO REMOVE 4 ILLEGAL FLEXIBLE GAS CONNECTIONS TO 4 EXISTING GAS DRYERS. FRO
|
|
Work on Floor(s): BAS
|