| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/13/2014 |
121178894 |
03 |
A2 |
P APPROVED |
01/16/2014 |
|
DE PIPPA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 04/24/2013 |
121178894 |
02 |
A2 |
P APPROVED |
05/01/2013 |
0028136 PE |
DE PIPPA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 08/08/2012 |
121178894 |
01 |
A2 |
X SIGNED OFF |
03/31/2014 |
0028136 PE |
DE PIPPA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 10/12/2011 |
120786355 |
02 |
A3 |
P APPROVED |
10/13/2011 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 003
|
| 09/21/2011 |
104600433 |
03 |
A3 |
P APPROVED |
09/22/2011 |
|
Walsh |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/08/2011 |
120786355 |
01 |
A3 |
X SIGNED OFF |
02/25/2013 |
0064006 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL 15 LINEAR FEET LONG BY 8 FEET HEIGHT BY 3 FEET WIDE PLYWOOD
|
|
Work on Floor(s): 001 thru 003
|
| 06/29/2011 |
120743990 |
01 |
A2 |
X SIGNED OFF |
12/14/2012 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
REMOVAL OF FRONT FACADE PER ATTACHED DRAWINGS.
|
|
Work on Floor(s): 001 thru 003
|
| 06/28/2011 |
104600433 |
02 |
A3 |
P APPROVED |
06/29/2011 |
|
Walsh |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 ERECT A HIGH HEAVY DUTY SIDEWALK SHED, PER
|
|
Work on Floor(s): 001
|
| 05/12/2011 |
120684312 |
01 |
A2 |
X SIGNED OFF |
12/18/2012 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
REMOVE HVAC UNITS FROM ROOF AND ALL ASSOCIATED DUCT WORK, PIPING, UTILITIE
|
|
Work on Floor(s): ROF
|
| 04/28/2011 |
120661257 |
01 |
A2 |
X SIGNED OFF |
12/14/2012 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
FACADE REPAIRS TO SOUTH FACADE PER ATTACHED DRAWINGS.
|
|
Work on Floor(s): 001 thru 003
|
| 11/05/2010 |
120519885 |
01 |
A3 |
X SIGNED OFF |
12/06/2012 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 75 LINEAR FEET BY 35 FEET APPROXIMATE HEIGHT OF TUBULAR S
|
|
Work on Floor(s): OSP
|
| 11/20/2006 |
104600433 |
01 |
A3 |
X SIGNED OFF |
11/29/2012 |
0064004 PE |
Walsh |
|
NOT APPLICABLE
|
|
ERECT A HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS PE
|
|
Work on Floor(s): 001
|
| 09/13/2006 |
104543353 |
01 |
A2 |
P APPROVED |
12/19/2006 |
0052081 PE |
ZINGHER |
|
NOT APPLICABLE
|
|
FACADE RESTORATION NO CHANGE TO USE, EGRESS AND OCCUPANCY.
|
|
Work on Floor(s): ROF,001,002,003
|
| 09/21/2004 |
103925647 |
01 |
SG |
R PERMIT-ENTIRE |
11/18/2004 |
NT |
TORRANE |
|
NOT APPLICABLE
|
|
INSTALL INDIRECTLY ILLUMINATED WALL SIGN 10' X 1.50 READING:ACCESS
|
|
Work on Floor(s): 1
|
| 09/21/2004 |
103925638 |
01 |
A3 |
R PERMIT-ENTIRE |
10/20/2004 |
|
TORRONE |
|
NOT APPLICABLE
|
|
INSTALL NON-ILLUMINATED RETRACTABLE AWNING WITH LETTERING NO LARGER
|
|
Work on Floor(s): 1
|
| 05/17/2004 |
103481064 |
01 |
A2 |
P APPROVED |
07/12/2004 |
0027188 RA |
Matz |
|
NOT APPLICABLE
|
|
Renovation of a storefront of an existing commercial space on the first fl
|
|
Work on Floor(s): 001
|
| 09/25/2000 |
102754912 |
01 |
A2 |
R PERMIT-ENTIRE |
11/16/2000 |
0026272 RA |
Ishac |
|
NOT APPLICABLE
|
|
Replace existing awning fabric, no change in occupancy, use or egress
|
|
Work on Floor(s): 001
|
| 08/30/2000 |
102753316 |
01 |
A2 |
R PERMIT-ENTIRE |
11/16/2000 |
0026272 RA |
Ishac |
|
NOT APPLICABLE
|
|
REMOVAL OF NEW WOOD SIGN NO CHANGE IN USE OCCUPANCY OR EGRESS
|
|
Work on Floor(s): 001
|
| 07/07/2000 |
102637461 |
01 |
A2 |
R PERMIT-ENTIRE |
09/12/2000 |
0010287 RA |
Lombardi |
|
NOT APPLICABLE
|
|
LEGALIZATION OF GAS FURNACE INSTALLED UNDER ALT #101597602, INADVERTLY OMI
|
|
Work on Floor(s): CEL
|
| 03/01/2000 |
101597602 |
07 |
A1 |
P APPROVED |
04/19/2000 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 01/04/2000 |
101597602 |
06 |
A1 |
P APPROVED |
01/21/2000 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 08/17/1999 |
102564841 |
01 |
A3 |
R PERMIT-ENTIRE |
08/26/1999 |
|
SIWEC |
|
NOT APPLICABLE
|
|
INSTALLATION OF 15' SIDEWALK SHED FOR THE PURPOSE OF FACADE INSPECTION
|
|
Work on Floor(s): GRD
|
| 06/18/1998 |
101597602 |
05 |
A1 |
P APPROVED |
06/23/1998 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 001 thru 003
|
| 06/18/1998 |
101597602 |
04 |
A1 |
P APPROVED |
06/23/1998 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/30/1997 |
101597602 |
01 |
A1 |
X SIGNED OFF |
07/13/2000 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
CHANGE OF USE ON THE 2ND , 3RD FLOOR TO CREATE A ONE FAMILY DWELLING.
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/20/1997 |
101597602 |
03 |
A1 |
X SIGNED OFF |
07/13/2000 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
REMOVEL ANS INSTALLATION OF PLUMBING FIX TURES FOR 1ST FLOOR COMMERICAL
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/20/1997 |
101597602 |
02 |
A1 |
X SIGNED OFF |
07/13/2000 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW MECHANICAL VENTILATI ON SYSTEM AND HEATING SYSTEM.
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/09/1996 |
101457969 |
01 |
A2 |
P APPROVED |
10/18/1996 |
0025706 PE |
Kamholtz |
|
NOT APPLICABLE
|
|
Cosmetic repair and maintenance (pointing / Masonry) of facade as per plan
|
|
Work on Floor(s): 001,003
|
| 07/26/1996 |
101354482 |
01 |
A3 |
X SIGNED OFF |
11/15/2004 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 18'LONG AT 22 GREEN WICH STREET, TO DO MINOR REPAIR
|
|
Work on Floor(s): GRD
|