Premises: 36 GROVE STREET MANHATTAN BIN: 1010013    Block: 588    Lot: 15

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
08/09/2019 122822295 09 A1 P APPROVED 08/15/2019 SEIDMAN AMENDED 12/28/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003,PEN,ROF

01/14/2019 122822295 08 A1 P APPROVED 04/18/2019 0062869 PE DALLAND AMENDED 12/28/2018
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): 003,PEN,ROF

09/06/2018 122822295 07 A1 P APPROVED 09/10/2018 SEIDMAN AMENDED 12/28/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003,PEN,ROF

07/25/2018 122822295 06 A1 P APPROVED 09/13/2018 0692869 PE DALLAND AMENDED 12/28/2018
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): 003,PEN,ROF

07/25/2018 122822295 04 A1 L P/E PAA $ PENDIN 08/09/2018 SEIDMAN AMENDED 12/28/2018
 DOC WITHDRAWN 09/05/2018
 Work on Floor(s): 003,PEN,ROF

07/25/2018 122822295 05 A1 P APPROVED 08/17/2018 0071257 PE DENIS AMENDED 12/28/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): 003,PEN,ROF

10/03/2017 140701710 01 A3 X SIGNED OFF 01/25/2019 0094567 PE HAIDER NOT APPLICABLE
 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
 Work on Floor(s): OSP

08/24/2016 122822295 03 A1 X SIGNED OFF 08/26/2019 0062869 PE DALLAND AMENDED 12/28/2018
 STRUCTURAL WORK FOR 3RD FLOOR AND ROOF ADDITION.
 Work on Floor(s): 003,PEN,ROF

08/24/2016 122822295 02 A1 X SIGNED OFF 08/26/2019 0071257 PE DENIS AMENDED 12/28/2018
 MECHANICAL AND PLUMBING WORK FOR 3RD FLOOR AND ROOF ADDITION.
 Work on Floor(s): 003,PEN,ROF

08/08/2016 122822295 01 A1 X SIGNED OFF 08/26/2019 0016506 RA SEIDMAN AMENDED 12/28/2018
 RENOVATION OF 3RD FLOOR AND ROOF ADDITION OF THIS EXISTING BUILDING.
 Work on Floor(s): 003,PEN,ROF

08/11/2014 122004516 04 A2 P APPROVED 08/13/2014 VOLPE NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,OSP

07/09/2014 122004516 03 A2 X SIGNED OFF 03/26/2015 0081283 PE VOLPE NOT APPLICABLE
 FILING SOE FOR NEW LIGHT WELL AS PER PLANS FILED HEREWITH. NO CHANGE IN U
 Work on Floor(s): CEL,OSP

05/09/2014 122004516 01 A2 X SIGNED OFF 03/26/2015 0016506 RA SEIDMAN NOT APPLICABLE
 FILING TO EXCUVATE LIGHT WELL @ REAR YARD, INSTALL NEW WINDOW TO LIGHT WEL
 Work on Floor(s): CEL,OSP

05/09/2014 122004516 02 A2 X SIGNED OFF 03/26/2015 0062869 PE DALLAND NOT APPLICABLE
 FILING STRUCTURAL WORK AND EXCUVATION FOR WALLS AND FOUNDATION OF NEW LIGH
 Work on Floor(s): CEL,OSP

03/11/1999 101525333 04 A1 P APPROVED 03/16/1999 0019565 RA HOTTENRO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS 001 thru 003

12/23/1998 101971591 01 A2 X SIGNED OFF 03/25/1999 0019565 RA HOTTENRO NOT APPLICABLE
 INSTALLATION OF NON REQUIRED ROOFTOP A.C UNITS FOR SINGLE FAMILY
 Work on Floor(s): BAS,ROF 001 thru 003

08/19/1998 101525333 03 A1 P APPROVED 09/23/1998 0019565 RA HOTTENRO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS 001 thru 003

07/07/1997 101525333 01 A1 X SIGNED OFF 06/17/1999 0019565 RA HOTTENRO NOT APPLICABLE
 COMPLETE RENOVATION OF THREE STORY STRUC TURE TO INCLUDE NEW PARTITIONS,
 Work on Floor(s): CEL,BAS 001 thru 003

06/11/1997 101525333 02 A1 X SIGNED OFF 06/17/1999 0028125 RA NAKROSIS NOT APPLICABLE
 PHASED REPLACEMENT OF FLOOR JOISTS ON AL L FLOORS. REPLACE ROOF RAFTERS
 Work on Floor(s): CEL,BAS 001 thru 003