| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/29/2021 |
121182059 |
16 |
A1 |
P APPROVED |
01/31/2022 |
|
BOYLE |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 08/20/2021 |
121182059 |
15 |
A1 |
P APPROVED |
09/15/2021 |
|
BOYLE |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 05/12/2021 |
123043303 |
02 |
A2 |
P APPROVED |
06/15/2021 |
|
HANINGTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/05/2021 |
121182059 |
14 |
A1 |
P APPROVED |
03/17/2021 |
0095460 PE |
HURST |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 10/16/2020 |
121182059 |
13 |
A1 |
P APPROVED |
11/02/2020 |
0095460 PE |
HURST |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 01/31/2020 |
121182059 |
12 |
A1 |
P APPROVED |
02/13/2020 |
|
BOYLE |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 07/22/2019 |
121182059 |
11 |
A1 |
P APPROVED |
09/09/2019 |
0095460 PE |
HURST |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 05/26/2017 |
123043303 |
01 |
A2 |
X SIGNED OFF |
08/10/2021 |
0041708 PE |
HANINGTO |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS FOR THE INSTALLATION OF 2 BOILERS 399 CFH EACH; ALL RE
|
|
Work on Floor(s): CEL
|
| 02/09/2017 |
121331353 |
03 |
A2 |
P APPROVED |
02/13/2017 |
|
HANINGTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 09/19/2016 |
121182059 |
10 |
A1 |
P APPROVED |
03/26/2019 |
0018543 RA |
BOYLE |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 07/01/2016 |
121182059 |
09 |
A1 |
P APPROVED |
05/08/2017 |
0041708 PE |
HANINGTO |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 08/06/2015 |
140386874 |
01 |
A3 |
X SIGNED OFF |
01/30/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 08/03/2015 |
140385081 |
01 |
A3 |
X SIGNED OFF |
01/30/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 06/23/2015 |
121331353 |
02 |
A2 |
P APPROVED |
10/13/2015 |
|
HANINGTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 05/28/2015 |
121182059 |
08 |
A1 |
J P/E DISAPPROVED |
07/17/2015 |
0041708 PE |
HANINGTO |
|
AMENDED 03/26/2019
|
|
DOC WITHDRAWN 10/29/2015
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 12/30/2013 |
140145019 |
01 |
A2 |
X SIGNED OFF |
03/28/2017 |
0077015 PE |
BRONZINO |
|
NOT APPLICABLE
|
|
TEMPORARY BRACING PLANS FILED IN CONJUNCTION WITH APPLICATION 121182059.
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 10/29/2013 |
121182059 |
07 |
A1 |
P APPROVED |
11/04/2013 |
0041708 PE |
HANINGTO |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 10/28/2013 |
121182059 |
06 |
A1 |
P APPROVED |
11/06/2013 |
0067391 PE |
HAGE |
|
AMENDED 03/26/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 06/07/2013 |
121182059 |
05 |
A1 |
X SIGNED OFF |
03/07/2022 |
0091200 PE |
DYKSTRA |
|
AMENDED 03/26/2019
|
|
SOE WORK AS SHOWN ON PLANS
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 04/22/2013 |
121331353 |
01 |
A2 |
X SIGNED OFF |
04/14/2017 |
0041708 PE |
HANINGTO |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SPRINKLER SYSTEM.
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 04/22/2013 |
121182059 |
04 |
A1 |
X SIGNED OFF |
03/07/2022 |
0018543 RA |
BOYLE |
|
AMENDED 03/26/2019
|
|
ERECT TEMP CONSTRUCTION FENCE
|
|
Work on Floor(s): 001
|
| 04/15/2013 |
121182059 |
03 |
A1 |
X SIGNED OFF |
03/07/2022 |
0095460 PE |
HURST |
|
AMENDED 03/26/2019
|
|
MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 04/15/2013 |
121182059 |
02 |
A1 |
X SIGNED OFF |
03/07/2022 |
0067391 PE |
HAGE |
|
AMENDED 03/26/2019
|
|
STRUCTURAL WORK AS SHOWN ON PLANS FIELD HEREWITH.
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 02/24/2012 |
121182059 |
01 |
A1 |
X SIGNED OFF |
03/07/2022 |
0018543 RA |
BOYLE |
|
AMENDED 03/26/2019
|
|
THIS APPLICATION IS FILED FOR THE CONVERSION OF TWO-FAMILY TO A SINGLE FAM
|
|
Work on Floor(s): CEL,BAS 001 thru 004
|
| 02/16/2012 |
120883160 |
02 |
A2 |
X SIGNED OFF |
03/28/2017 |
0018543 RA |
BOYLE |
|
NOT APPLICABLE
|
|
TO ADD PLUMBING WORKTYPE (REMOVED/CAPPED ONLY) NO NEW PLUMBING WORK ON THI
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 01/03/2012 |
120883160 |
01 |
A2 |
X SIGNED OFF |
03/28/2017 |
0018543 RA |
BOYLE |
|
NOT APPLICABLE
|
|
INTERIOR DEMO ALL FLOORS. NON-STRUCTURAL ONLY AS PER PLAN.
|
|
Work on Floor(s): CEL,BAS,RF 001 thru 003
|
| 05/16/1996 |
101170992 |
02 |
A1 |
P APPROVED |
08/27/1996 |
0059515 PE |
LIEBERMA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 12/28/1995 |
101170992 |
01 |
A1 |
X SIGNED OFF |
10/22/1996 |
0059515 PE |
LIEBERMA |
|
NOT APPLICABLE
|
|
REARRANGEMENT OF PARTITIONS, BATHROOMS AND KITCHENS TO CREATE 2 DUPLEX
|
|
Work on Floor(s): 001 thru 004
|
| 11/12/1992 |
100506686 |
01 |
A2 |
R PERMIT-ENTIRE |
02/24/1993 |
0013954 RA |
PALINKAS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/13/2016 MINOR PARTITION CHANGES AND PLUMBING WORK. NO CHA
|
|
Work on Floor(s): 1, 2
|
| 09/25/1992 |
100479028 |
01 |
A1 |
J P/E DISAPPROVED |
09/29/1992 |
0013954 RA |
PALINKAS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/13/2016 COMBINING TWO APARTMENTS, REMOVE ON BATH ROOM ON
|
|
Work on Floor(s): 1, 2
|