| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/23/2021 |
122555216 |
02 |
A2 |
P APPROVED |
07/01/2021 |
|
HOBSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND,CEL
|
| 12/23/2020 |
140994805 |
01 |
A2 |
H P/E IN PROCESS |
12/23/2020 |
0061833 PE |
LEVINE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/23/2021 HEREWITH FILING FOR THE REPLACEMENT OF THE SIDEWAL
|
|
Work on Floor(s): OSP
|
| 12/03/2019 |
123813418 |
02 |
A2 |
P APPROVED |
01/17/2020 |
|
MAASARAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 11/07/2019 |
123698070 |
01 |
A2 |
R PERMIT-ENTIRE |
12/16/2019 |
0019499 RA |
DUBOIS |
|
NOT APPLICABLE
|
|
FILING HEREWITH ARCHITECTURAL RENOVATIONS OF THE 8TH FLOOR AS PER PLANS.
|
|
Work on Floor(s): 008
|
| 08/06/2019 |
140863304 |
01 |
A2 |
X SIGNED OFF |
09/30/2020 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR
|
|
Work on Floor(s): CEL
|
| 06/24/2019 |
123813418 |
01 |
A2 |
X SIGNED OFF |
02/19/2020 |
0059908 PE |
MAASARAN |
|
NOT APPLICABLE
|
|
REPLACE EXISTING AC UNIT AT ROOF WITH NEW AC UNIT. OBTAIN EQUIPMENT USE PE
|
|
Work on Floor(s): ROF
|
| 04/23/2019 |
123738107 |
01 |
A2 |
X SIGNED OFF |
09/09/2020 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS PER PLAN
|
|
Work on Floor(s): 003
|
| 04/22/2019 |
123889961 |
01 |
A2 |
X SIGNED OFF |
07/13/2021 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS
|
|
Work on Floor(s): 003
|
| 04/22/2019 |
123889970 |
01 |
A2 |
X SIGNED OFF |
10/14/2020 |
0019499 RA |
DUBOIS |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INTERIOR RENOVATION WORK AS PER PLANS. NO CHANGE TO U
|
|
Work on Floor(s): 003
|
| 04/22/2019 |
123889970 |
02 |
A2 |
X SIGNED OFF |
10/14/2020 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.
|
|
Work on Floor(s): 003
|
| 12/28/2018 |
140824623 |
01 |
A3 |
H P/E IN PROCESS |
12/28/2018 |
0099416 PE |
MOSTAFA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/02/2019 REQUEST A TEMPORARY WOOD FENCE PERMIT
|
|
Work on Floor(s): OSP
|
| 12/14/2018 |
140823090 |
01 |
A3 |
H P/E IN PROCESS |
12/14/2018 |
0089728 PE |
KAMRUL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 02/12/2019 REQUEST A TEMPORARY WOOD FENCE PERMIT
|
|
Work on Floor(s): OSP
|
| 12/14/2018 |
123511743 |
01 |
A2 |
X SIGNED OFF |
01/28/2020 |
0089728 PE |
KAMRUL |
|
NOT APPLICABLE
|
|
RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION IN EXISTING BEAUTY PARLOR.
|
|
Work on Floor(s): 001
|
| 09/27/2018 |
123580801 |
01 |
A2 |
R PERMIT-ENTIRE |
09/30/2019 |
0061833 PE |
LEVINE |
|
NOT APPLICABLE
|
|
PROPOSED EXTERIOR REPAIRS AS PER PLANS FILED . THERE IS NO CHANGE IN OCCU
|
|
Work on Floor(s): EXT
|
| 06/25/2018 |
123444656 |
03 |
A2 |
P APPROVED |
06/27/2018 |
|
WIENER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 04/19/2018 |
123502174 |
01 |
A3 |
R PERMIT-ENTIRE |
04/19/2018 |
0065950 PE |
CLARKE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A BUSINESS AWNING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
|
|
Work on Floor(s): 001
|
| 04/16/2018 |
123444656 |
02 |
A2 |
P APPROVED |
05/09/2018 |
|
WIENER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 03/02/2018 |
123444656 |
01 |
A2 |
R PERMIT-ENTIRE |
03/06/2018 |
0029493 RA |
WIENER |
|
NOT APPLICABLE
|
|
PROPOSE RENOVATION OF EXISTING COMMERCIAL SPACE WITH NEW INTERIOR FINISH W
|
|
Work on Floor(s): CEL,001
|
| 01/26/2018 |
123151524 |
01 |
A2 |
R PERMIT-ENTIRE |
01/26/2018 |
0029493 RA |
WIENER |
|
NOT APPLICABLE
|
|
PROPOSE RENOVATION OF EXISTING COMMERCIAL SPACE WITH REMOVAL OF EXISTING N
|
|
Work on Floor(s): 001
|
| 09/29/2017 |
123297627 |
02 |
A2 |
P APPROVED |
10/10/2017 |
|
SAAVEDRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 09/12/2017 |
123337656 |
01 |
A1 |
H P/E IN PROCESS |
09/18/2017 |
0009114 RA |
NIEGO |
|
NOT APPLICABLE
|
|
PROPOSE TO OBTAIN BSA APPROVAL FOR PHYSICAL CULTURE ESTABLISHMENT FOR NEW
|
|
Work on Floor(s): 002
|
| 09/12/2017 |
123337291 |
01 |
A2 |
Q PERMIT-PARTIAL |
09/15/2017 |
0026432 RA |
ZABASAJJ |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING RETAIL SPACE. INSTALLATION OF NON LOAD BEA
|
|
Work on Floor(s): CEL,001
|
| 06/27/2017 |
123297627 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/2017 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
RENOVATION OF COMMERCIAL SPACE AT SECOND FLOOR; RE ARRANGEMENT OF LOCKER R
|
|
Work on Floor(s): 002
|
| 03/27/2017 |
122988080 |
01 |
A2 |
X SIGNED OFF |
08/20/2019 |
0083189 PE |
HUANG |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION PARTIAL AT 1ST FLOOR. CEILING, FLOORING, PART
|
|
Work on Floor(s): 001
|
| 02/15/2016 |
122405405 |
03 |
A2 |
P APPROVED |
03/08/2016 |
|
DUBOIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 11/02/2015 |
122555216 |
01 |
A2 |
X SIGNED OFF |
07/27/2021 |
0092050 PE |
HOBSON |
|
NOT APPLICABLE
|
|
SIDEWALK VAULT REPAIR PROGRAM ABOVE OIL TANK ROOM AND SOUTH HALF OF BOILER
|
|
Work on Floor(s): GND,CEL
|
| 09/23/2015 |
122405389 |
02 |
A2 |
P APPROVED |
10/05/2015 |
|
CHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 06/23/2015 |
122448002 |
02 |
A2 |
X SIGNED OFF |
07/25/2016 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
FILING HEREWITH INTERIOR MECHANICAL REMOVALS AS PER PLANS. NO CHANGE IN U
|
|
Work on Floor(s): 008
|
| 06/23/2015 |
122448002 |
01 |
A2 |
X SIGNED OFF |
07/25/2016 |
0019499 RA |
DUBOIS |
|
NOT APPLICABLE
|
|
FILING HEREWITH INTERIOR REMOVALS AS PER PLANS.NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 008
|
| 05/18/2015 |
122405405 |
02 |
A2 |
X SIGNED OFF |
05/10/2016 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
FILING HEREWITH MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR
|
|
Work on Floor(s): 008
|
| 05/18/2015 |
122405405 |
01 |
A2 |
X SIGNED OFF |
05/10/2016 |
0019499 RA |
DUBOIS |
|
NOT APPLICABLE
|
|
FILING HEREWITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE AS PER PLANS.
|
|
Work on Floor(s): 008
|
| 05/18/2015 |
122404950 |
01 |
A2 |
X SIGNED OFF |
12/07/2016 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
FILING HEREWITH MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS.
|
|
Work on Floor(s): 008
|
| 05/18/2015 |
122405389 |
01 |
A2 |
X SIGNED OFF |
12/07/2016 |
0089618 PE |
CHAN |
|
NOT APPLICABLE
|
|
FILING HEREWITH MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS. N
|
|
Work on Floor(s): 008
|
| 02/04/2015 |
100908485 |
05 |
A1 |
D A/P ENTIRE |
02/17/2015 |
|
NIEGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2
|
| 11/19/2014 |
122200698 |
01 |
A3 |
R PERMIT-ENTIRE |
11/19/2014 |
0771731 PE |
MANTRANA |
|
NOT APPLICABLE
|
|
FILING FOR PIPE SCAFFOLD ON ROOF FOR CHIMNEY INSTALLATION; NO CHANGE TO U
|
|
Work on Floor(s): ROF,OSP
|
| 10/30/2014 |
122181726 |
01 |
A2 |
X SIGNED OFF |
03/03/2015 |
0078958 PE |
COHEN |
|
NOT APPLICABLE
|
|
INSTALL REPLACEMENT STEEL CHIMNEY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
|
|
Work on Floor(s): OSP,ROF
|
| 07/17/2014 |
121462504 |
03 |
A2 |
P APPROVED |
10/31/2014 |
|
LEVINE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): EXT
|
| 03/04/2014 |
121785238 |
02 |
A2 |
P APPROVED |
03/24/2014 |
|
BOSCO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 01/30/2014 |
121910619 |
01 |
SG |
P APPROVED |
01/30/2014 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCU
|
|
Work on Floor(s): 001
|
| 10/07/2013 |
121803450 |
01 |
A2 |
X SIGNED OFF |
03/27/2014 |
0089081 PE |
KIM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR CAFE. DROP CEILING ON EXISTING CEILING,INSTALL TIL
|
|
Work on Floor(s): 001
|