BIS Menu  |  Marquee Query  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 5
Premises: 100 UNIVERSITY PLACE MANHATTAN BIN: 1009386    Block: 570    Lot: 7503

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
05/02/2024 121187241 22 NB P APPROVED 12/04/2024 0020204 RA GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,ROF 001 thru 022

06/06/2022 121187241 21 NB P APPROVED 07/19/2022 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,ROF 001 thru 022

01/24/2022 121187241 20 NB P APPROVED 03/28/2022 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01 FILING FOR CONSTRUCTION OF 22-STORY NEW BUI
 Work on Floor(s): SUB,CEL,ROF 001 thru 022

05/03/2021 121187241 19 NB P APPROVED 05/07/2021 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL 001 thru 023

11/24/2020 121187241 18 NB P APPROVED 12/04/2020 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

05/22/2020 140859863 02 A2 P APPROVED 09/30/2020 DEMETRY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,SUB

02/24/2020 140256041 03 A2 P APPROVED 03/04/2020 MASS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

01/21/2020 122117903 02 A2 P APPROVED 10/14/2020 MASS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,MEZ 001 thru 023

08/29/2019 121187241 17 NB P APPROVED 09/03/2019 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

07/25/2019 121187241 16 NB P APPROVED 07/26/2019 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

07/19/2019 121187241 15 NB P APPROVED 07/22/2019 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

07/15/2019 140859863 01 A2 X SIGNED OFF 09/30/2020 0038321 RA DEMETRY NOT APPLICABLE
 INSTALL PARKING DOUBLE STACKERS IN GARAGE ON CELLAR AND SUB-SECLLAR FLOOR
 Work on Floor(s): CEL,SUB

05/17/2019 123721375 01 A2 R PERMIT-ENTIRE 08/12/2019 0058375 PE MASS NOT APPLICABLE
 JOB WITHDRAWN 01/08/2020 SPRINKLER WORK AS SHOWN ON PLANS.
 Work on Floor(s): 001

05/17/2019 123807693 01 A2 R PERMIT-ENTIRE 07/11/2019 0015015 RA NICHOLSO NOT APPLICABLE
 JOB WITHDRAWN 01/08/2020 INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING A
 Work on Floor(s): 001

05/17/2019 123807693 02 A2 R PERMIT-ENTIRE 07/11/2019 0058375 PE MASS NOT APPLICABLE
 DOC WITHDRAWN 01/08/2020 MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS.
 Work on Floor(s): 001

05/04/2019 121187241 14 NB P APPROVED 05/06/2019 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL 001 thru 023

04/29/2019 121187241 13 NB P APPROVED 04/30/2019 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL 001 thru 023

04/04/2019 121187241 12 NB P APPROVED 04/10/2019 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL 001 thru 023

01/04/2019 123592521 01 A2 P APPROVED 01/08/2019 0020204 RA GLAS NOT APPLICABLE
 THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE FO
 Work on Floor(s): 008

11/27/2018 121187241 11 NB P APPROVED 11/28/2018 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

11/21/2018 123538207 01 A2 P APPROVED 11/21/2018 0042885 PE PRESSEL NOT APPLICABLE
 OCCUPANT PROTECTION PLAN FOR FIRST FLOOR ONLY. FILED IN CONJUNCTION WITH N
 Work on Floor(s): 001

10/09/2018 123495547 01 SC U COMPLETED 10/26/2018 0020204 RA GLAS NOT APPLICABLE
 FILING SUBDIVISION FOR 54 CONDO TAX LOT #'S 1101 THROUGH 1154. NO CHANGE T
08/14/2018 140256041 02 A2 P APPROVED 12/03/2018 MASS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

08/14/2018 123460995 01 A3 P APPROVED 05/16/2022 0020204 RA GLAS NOT APPLICABLE
 FIRE PROTECTION PLAN AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS
 Work on Floor(s): SUB,CEL 001 thru 023

06/14/2018 122882201 04 A3 P APPROVED 06/21/2018 0087583 PE HERNANDE NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

06/04/2018 121187241 10 NB P APPROVED 10/02/2018 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL 001 thru 023

05/31/2018 121187241 09 NB P APPROVED 09/13/2018 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

02/15/2018 122882201 03 A3 P APPROVED 02/16/2018 PERDEK NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

01/12/2018 140730831 01 A3 X SIGNED OFF 07/15/2022 0072184 PE STROH NOT APPLICABLE
 TEMPORARY INSTALLATION OF ADT LIFTING SYSTEM IN CONJUNCTION TO NB #1211872
 Work on Floor(s): 020

12/12/2017 121187241 08 NB P APPROVED 01/12/2018 GLAS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 01 FILING FOR CONSTRUCTION OF 23-STORY NEW BUI
 Work on Floor(s): SUB,CEL 001 thru 023

11/27/2017 140718560 01 A3 P APPROVED 11/27/2017 0072184 PE STROH NOT APPLICABLE
 JOB WITHDRAWN 03/09/2018 TEMPORARY INSTALLATION OF ADT LIFTING SYSTEM IN C
 Work on Floor(s): 020

09/27/2017 122932871 03 A3 P APPROVED 10/05/2017 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

09/12/2017 122932871 02 A3 P APPROVED 09/20/2017 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

08/22/2017 140684196 01 A2 X SIGNED OFF 01/28/2019 0058375 PE MASS NOT APPLICABLE
 INSTALLATION OF BOILER ON THE 22ND FLOOR & ROOF AS PER PLANS FILED HEREWIT
 Work on Floor(s): 022,ROF

08/22/2017 140684187 01 A2 X SIGNED OFF 04/29/2022 0058375 PE MASS NOT APPLICABLE
 INSTALLATION OF NATURAL GAS GENERATOR ON THE 22ND FLOOR AS PER PLANS FILED
 Work on Floor(s): 022

07/26/2017 140670511 01 A2 X SIGNED OFF 05/02/2022 0090287 PE LOMBARDO NOT APPLICABLE
 INSTALLATION OF LOADING PLATFORM AS PER PLAN FILED HEREWITH. NO CHANGE IN
 Work on Floor(s): SUB,CEL,ROF 001 thru 023

06/29/2017 121229223 01 A3 R PERMIT-ENTIRE 06/29/2017 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF A PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPL
 Work on Floor(s): 001

06/26/2017 121229205 01 A3 X SIGNED OFF 06/19/2019 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF ROOF PROTECTION AT THE ADJACENT BUILDING AS PER DRAWINGS D
 Work on Floor(s): OSP

02/15/2017 122932871 01 A3 X SIGNED OFF 06/19/2019 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF A DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOIST INCLUDIN
 Work on Floor(s): OSP

12/29/2016 121187241 07 NB P APPROVED 01/03/2017 0058375 PE MASS AMENDED 08/09/2018
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): SUB,CEL,ROF 001 thru 023



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Marquee Query  |  Applications  |  Back