 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/21/2023 |
121287909 |
09 |
A1 |
D A/P ENTIRE |
12/04/2024 |
|
ROGOVE |
|
GRANTED 04/09/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 012
|
| 11/13/2019 |
121287909 |
08 |
A1 |
P APPROVED |
11/29/2019 |
|
ROGOVE |
|
GRANTED 04/09/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 012
|
| 07/12/2019 |
140859630 |
01 |
A2 |
X SIGNED OFF |
02/21/2020 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REMOVE FUEL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRE
|
|
Work on Floor(s): CEL
|
| 07/02/2019 |
121287909 |
06 |
A1 |
P APPROVED |
07/12/2019 |
0073548 PE |
GLICKMAN |
|
GRANTED 04/09/2019
|
|
SPRINKLER/STANDPIPE APPLICATION FILED IN CONJUNCTION WITH DOC 01.
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 012
|
| 05/03/2019 |
121287909 |
07 |
A1 |
P APPROVED |
05/20/2019 |
0089151 PE |
ABISAAB |
|
GRANTED 04/09/2019
|
|
SOE APPLICATIONS FILED IN CONJUNCTION WITH DOC 01
|
|
Work on Floor(s): OSP
|
| 02/08/2019 |
123253825 |
01 |
A3 |
J P/E DISAPPROVED |
02/11/2019 |
0032476 RA |
ROGOVE |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN BEING FILED IN CONJUNCTION WITH NEW BUILDING APPLICAT
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 01/28/2019 |
140825579 |
01 |
A2 |
P APPROVED |
05/20/2019 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
TEMPORARY SD APPLICATION FILED IN CONJUNCTION WITH ALT 1# 121287909. NO CH
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 012
|
| 12/20/2018 |
140823919 |
01 |
A3 |
J P/E DISAPPROVED |
01/31/2019 |
0032476 RA |
ROGOVE |
|
NOT APPLICABLE
|
|
PROVIDE BUILDERS PAVEMENT PLAN FOR A TOTAL FRONTAGE OF 103 LINEAR FT. AS P
|
|
Work on Floor(s): OSP
|
| 12/19/2018 |
121287909 |
05 |
A1 |
P APPROVED |
05/20/2019 |
0085531 PE |
HUGHES |
|
GRANTED 04/09/2019
|
|
FOUNDATION WORK AS PER PLANS FILED
|
|
Work on Floor(s): OSP
|
| 09/05/2018 |
121287909 |
04 |
A1 |
P APPROVED |
05/20/2019 |
0098231 PE |
MOORMANN |
|
GRANTED 04/09/2019
|
|
PARTIAL DEMOLITION FILED IN CONJUNCTION WITH DOC 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 11/15/2017 |
121287909 |
03 |
A1 |
P APPROVED |
07/12/2019 |
0085531 PE |
HUGHES |
|
GRANTED 04/09/2019
|
|
STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH BUILDINGS COMBINATION AND
|
|
Work on Floor(s): CEL 001 thru 008
|
| 11/15/2017 |
121287909 |
02 |
A1 |
P APPROVED |
07/12/2019 |
0073548 PE |
GLICKMAN |
|
GRANTED 04/09/2019
|
|
INSTILLATION OF HVAC, EMERGENCY GENERATOR AND FIXTURES IN CONJUNCTION WITH
|
|
Work on Floor(s): CEL,ROF,UDG 001 thru 012
|
| 11/15/2017 |
121287909 |
01 |
A1 |
P APPROVED |
07/12/2019 |
0032476 RA |
ROGOVE |
|
GRANTED 04/09/2019
|
|
FILING TO COMBINE THREE EXISTING BUILDINGS INTO BUILDING. VERTICAL AND HOR
|
|
Work on Floor(s): CEL 001 thru 012
|
| 02/28/2017 |
122943636 |
01 |
DM |
E AP-NPE |
02/28/2017 |
OT |
CALIENDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/18/2017 FULL DEMOLITION OF FOUR STORY STRUCTURE USING HAN
|
|
Work on Floor(s): CEL,MZ4 001 thru 004
|
| 05/19/2015 |
122407920 |
02 |
A2 |
Q PERMIT-PARTIAL |
11/02/2015 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
THIS IS FILED IN CONJUNCTION WITH DOC 01. DOC 02 IS FILED TO RELOCATE AC U
|
|
Work on Floor(s): 001,MEZ
|
| 05/19/2015 |
122407920 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/02/2015 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
CREATE TWO OFFICES AND ONE STOREFRONT ON FIRST FLOOR. NO CHANGE TO USE, EG
|
|
Work on Floor(s): 001,MEZ
|
| 08/30/2013 |
121764885 |
01 |
A2 |
R PERMIT-ENTIRE |
08/30/2013 |
0070920 PE |
D'ANTONI |
|
NOT APPLICABLE
|
|
REMOVE OIL FIRED STEAM BOILER.INSTALL PEERLESS 211A-06 GAS FIRED BOILER
|
|
Work on Floor(s): CEL
|
| 04/24/2007 |
104737180 |
02 |
A2 |
X SIGNED OFF |
05/13/2015 |
0602931 PE |
Ettinger |
|
NOT APPLICABLE
|
|
Plumbing work in conjunction with Alt type 2, which is being filed to remo
|
| 04/17/2007 |
104737180 |
01 |
A2 |
X SIGNED OFF |
05/13/2015 |
0015540 RA |
Taylor |
|
NOT APPLICABLE
|
|
Remodel office on the 1st floor, 1st floor mezzanine, and 2nd floor. Creat
|
|
Work on Floor(s): 001,MEZ,002
|
| 06/26/2006 |
102516948 |
08 |
A1 |
P APPROVED |
06/27/2006 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,004,MEZ
|
| 05/13/2005 |
102516948 |
07 |
A1 |
P APPROVED |
06/09/2005 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,004,MEZ
|
| 05/10/2004 |
102516948 |
06 |
A1 |
P APPROVED |
05/11/2004 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,004,MEZ
|
| 10/11/2002 |
102516948 |
04 |
A1 |
G PAA FEE DUE |
10/11/2002 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/11/2002
|
|
Work on Floor(s): 2ND,4TH,MEZ,ROF
|
| 10/11/2002 |
102516948 |
05 |
A1 |
D A/P ENTIRE |
10/15/2002 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/05/2004
|
|
Work on Floor(s): 2ND,4TH,MEZ,ROF
|
| 07/16/2002 |
102516948 |
03 |
A1 |
P APPROVED |
08/13/2002 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,004,MEZ
|
| 01/29/2002 |
102516948 |
02 |
A1 |
P APPROVED |
02/05/2002 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,MEZ
|
| 06/28/2001 |
102516948 |
01 |
A1 |
X SIGNED OFF |
07/07/2006 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
REMODEL 4TH FLOOR AND CHANGE USE OF SAME TO RESIDENTIAL USE.ADD HVAC
|
|
Work on Floor(s): 002,004,MEZ
|