 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/25/2018 |
140806046 |
PR |
I LAA SIGNED OFF |
04/17/2019 |
MP 002252 |
DUMITRIU |
|
ON THE 9TH FLOOR IN APT#9J DIRECT REPLACEMENT OF 3PC BATHROOM
|
|
Work on Floor(s): 009
|
| 06/01/2018 |
140771378 |
PR |
I LAA SIGNED OFF |
12/13/2018 |
MP 000910 |
DEL CARR |
|
IN APARTMENT 8A ON 8TH FLOOR, IN THE BATHROOM WE WILL REPLACE TOILET, SINK
|
|
Work on Floor(s): 008
|
| 03/06/2018 |
140746058 |
PR |
I LAA SIGNED OFF |
05/03/2019 |
MP 002252 |
DUMITRIU |
|
ON THE 11TH FLOOR IN APT#11A DIRECT REPLACEMENT OF 2PC BATHROOM
|
|
Work on Floor(s): 011
|
| 06/27/2017 |
140661380 |
PR |
I LAA SIGNED OFF |
08/16/2017 |
MP 001524 |
CRITELLI |
|
IN CELLAR, REPLACE ONE (1) EXISTING METER BAR WITH ONE (1) BY-PASS METER B
|
|
Work on Floor(s): CEL,005
|
| 06/13/2017 |
140656029 |
PR |
E LAA FILED |
06/13/2017 |
MP 002371 |
BANJA |
|
IN APT #11N ON THE 11TH FLOOR REPLACE TO EXISTING ROUGHING (1) LAV, (1) TO
|
|
Work on Floor(s): 011
|
| 03/10/2017 |
122321772 |
PR |
I LAA SIGNED OFF |
04/19/2017 |
MP 001137 |
CASH |
|
FILING TO INSTALL APPROXIMATELY 10 FEET OF 1/2" COPPER PIPE AND CONNECT 1
|
|
Work on Floor(s): 006
|
| 10/28/2016 |
140568909 |
PR |
E LAA FILED |
10/28/2016 |
MP 001342 |
DISABATO |
|
IN APARTMENT 4L ON THE 4TH FLOOR RELOCATE KITCHEN SINK 1' USING APPROX 2'
|
|
Work on Floor(s): 004
|
| 05/20/2016 |
140498566 |
PR |
I LAA SIGNED OFF |
10/31/2016 |
MP 002072 |
GAVRIELA |
|
IN APT #14R ON THE 14TH FLOOR REPLACE TO EXISTING ROUGHING (2) TOILETS, (2
|
|
Work on Floor(s): 014
|
| 03/18/2015 |
140323246 |
PR |
E LAA FILED |
03/18/2015 |
MP 002252 |
DUMITRIU |
|
ON THE 7TH FLOOR IN APT#7W DIRECT REPLACEMENT OF 3PC BATHROOM
|
|
Work on Floor(s): 007
|
| 01/02/2013 |
140047072 |
PR |
I LAA SIGNED OFF |
07/01/2013 |
MP 002136 |
DIMICELI |
|
BATHROOM - REPLACE NEW FIXTURES ON EXISTING ROUGH, CHANGE OUT TUB AND INS
|
|
Work on Floor(s): 5TH
|
| 04/21/2009 |
110265230 |
PR |
I LAA SIGNED OFF |
02/11/2010 |
MP 001823 |
HOURIE |
|
1968-IN APT 4D ON THE 4TH FL REPLACE 1 BATHTUB, WATER CLOSET,LAV & RESIDEN
|
|
Work on Floor(s): 004
|
| 03/30/2009 |
110263928 |
PR |
E LAA FILED |
03/30/2009 |
MP 002127 |
NADILE |
|
1968 CODE IN APT#7J ON THE 7TH FL REPLACE KITCHEN SINK, DISHWASHER GAS LIN
|
|
Work on Floor(s): 007
|
| 08/21/2008 |
110235013 |
PR |
E LAA FILED |
08/21/2008 |
MP 002127 |
NADILE |
|
ON THE 8TH FLOOR, IN APT #8L REPLACE LAVATORY, W/C & KITCHEN SINK EXISTING
|
|
Work on Floor(s): 008
|
| 10/25/2006 |
102396649 |
PR |
I LAA SIGNED OFF |
12/12/2017 |
OBI 002693 |
SOLOMON |
|
INSTALLATION OF 2-NEW BOILERS & REMOUNTING OF THE 2-EXISTING INDUSTRIAL
|
|
Work on Floor(s): CEL
|
| 07/15/2003 |
102357227 |
PR |
I LAA SIGNED OFF |
08/07/2003 |
MP 001647 |
MARTIN, |
|
ON THE 11TH FLOOR IN APT 11K REPLACE KITCHEN SINK AND WATER CLOSET TO EXIS
|
|
Work on Floor(s): 011
|
| 01/23/2002 |
102156284 |
PR |
I LAA SIGNED OFF |
01/30/2002 |
MP 000620 |
KRAUS |
|
REPLACED EXISTING DEFECTIVE 3/4" GAS COCK WHICH
|
| 05/29/2001 |
102142003 |
PR |
I LAA SIGNED OFF |
06/05/2001 |
MP 000620 |
KRAUS |
|
EMERGENCY REPAIR: REPLACED EXISTING DEFECTIVE GAS COCK ON GAS STOVGE IN
|
|
Work on Floor(s): 003
|