| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/11/2025 |
124041143 |
02 |
A1 |
P APPROVED |
10/09/2025 |
|
BOURASSA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 09/09/2024 |
124041143 |
01 |
A1 |
R PERMIT-ENTIRE |
02/28/2025 |
0040943 RA |
BOURASSA |
|
NOT APPLICABLE
|
|
APPLICATION FOR CHANGE OF USE OF 4TH LEVEL IN EXISTING M BUILDING OCCUPANC
|
|
Work on Floor(s): 004
|
| 01/23/2024 |
122629003 |
13 |
A1 |
P APPROVED |
02/08/2024 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 07/26/2021 |
122629003 |
12 |
A1 |
P APPROVED |
12/07/2023 |
0024014 RA |
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERSION OF EXISTING BUILDING AND CHANGE
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/03/2020 |
123399349 |
06 |
A2 |
P APPROVED |
09/16/2020 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001
|
| 09/02/2020 |
123481758 |
04 |
A2 |
P APPROVED |
09/14/2020 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,ROF
|
| 07/24/2020 |
122629003 |
11 |
A1 |
P APPROVED |
08/10/2020 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01 SEE SECTION 24
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/30/2020 |
122629003 |
10 |
A1 |
P APPROVED |
02/21/2020 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/27/2019 |
122629003 |
09 |
A1 |
P APPROVED |
12/19/2019 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/18/2019 |
123742879 |
01 |
A2 |
X SIGNED OFF |
03/23/2020 |
0010287 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
INSTALLATION OF A TEMPORARY TENT ON THE ROOF AS PER PLANS. NO CHANGE OF US
|
|
Work on Floor(s): ROF
|
| 03/25/2019 |
123481847 |
02 |
A2 |
P APPROVED |
03/25/2019 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,ROF
|
| 03/21/2019 |
123399349 |
05 |
A2 |
P APPROVED |
03/22/2019 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001
|
| 03/21/2019 |
123545707 |
03 |
A2 |
P APPROVED |
03/22/2019 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 02/12/2019 |
122629003 |
08 |
A1 |
P APPROVED |
03/08/2019 |
0064829 PE |
GREEN |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/10/2019 |
123545707 |
02 |
A2 |
P APPROVED |
01/16/2019 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 11/26/2018 |
123399349 |
04 |
A2 |
P APPROVED |
11/28/2018 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001
|
| 10/11/2018 |
123481847 |
01 |
A2 |
X SIGNED OFF |
10/28/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. N
|
|
Work on Floor(s): 002,003,004,ROF
|
| 10/11/2018 |
123481758 |
03 |
A2 |
X SIGNED OFF |
10/27/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
INSTALL DUCTWORK AND UNITS.INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN O
|
|
Work on Floor(s): 002,003,004,ROF
|
| 10/11/2018 |
123481758 |
02 |
A2 |
X SIGNED OFF |
10/27/2020 |
0080957 PE |
CULLEN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AND ASSOCIATED FRAMING AS SHOWN ON DRAWINGS FILED HEREWITH
|
|
Work on Floor(s): 002,003,004,ROF
|
| 10/11/2018 |
123481758 |
01 |
A2 |
X SIGNED OFF |
10/27/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON
|
|
Work on Floor(s): 002,003,004,ROF
|
| 10/02/2018 |
122629003 |
07 |
A1 |
P APPROVED |
10/26/2018 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/28/2018 |
123545707 |
01 |
A2 |
X SIGNED OFF |
08/04/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. N
|
|
Work on Floor(s): CEL,001
|
| 08/22/2018 |
123008280 |
02 |
A2 |
P APPROVED |
12/13/2018 |
|
MARIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MANUAL & AUTOMATIC SMOKE DETECTION SPRINKLE
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/22/2018 |
123399349 |
03 |
A2 |
X SIGNED OFF |
09/17/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
INSTALL DUCTWORK AND UNITS.INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN O
|
|
Work on Floor(s): CEL,001
|
| 08/22/2018 |
123399349 |
02 |
A2 |
X SIGNED OFF |
09/17/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EG
|
|
Work on Floor(s): CEL,001
|
| 08/22/2018 |
123399349 |
01 |
A2 |
X SIGNED OFF |
09/17/2020 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON
|
|
Work on Floor(s): CEL,001
|
| 08/15/2018 |
123561396 |
01 |
A2 |
P APPROVED |
08/15/2018 |
0027948 RA |
MARIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/12/2018 INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DR
|
|
Work on Floor(s): CEL,001
|
| 06/22/2018 |
123565481 |
01 |
A2 |
X SIGNED OFF |
09/29/2020 |
0073080 PE |
EL-TOHAM |
|
NOT APPLICABLE
|
|
PROPOSE TO PROVIDE TEMPORARY SHORING AS SHOWN ON DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 05/11/2018 |
140765483 |
01 |
A3 |
H P/E IN PROCESS |
05/11/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 07/10/2018 INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO C
|
|
Work on Floor(s): OSP
|
| 04/23/2018 |
122629003 |
06 |
A1 |
P APPROVED |
05/14/2018 |
0064829 PE |
GREEN |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 04/16/2018 |
122629003 |
05 |
A1 |
P APPROVED |
04/19/2018 |
0064095 PE |
MURRAY |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 03 STRUCTURAL WORK TO LOWER GROUND FLOOR AND N
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 04/16/2018 |
122629003 |
04 |
A1 |
P APPROVED |
04/19/2018 |
|
SELLDORF |
|
AMENDED 11/29/2023
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERSION OF EXISTING COMMUNITY FACILITY T
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 04/26/2017 |
123061122 |
03 |
A2 |
X SIGNED OFF |
10/30/2020 |
0064829 PE |
GREEN |
|
NOT APPLICABLE
|
|
REMOVE PLUMBING FIXTURES AND CAP LINES AT SOURCE AS SHOWN ON DRAWINGS FILE
|
|
Work on Floor(s): BAS,001,MEZ,002,003,004
|
| 04/26/2017 |
123061122 |
02 |
A2 |
X SIGNED OFF |
10/30/2020 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
REMOVAL OF EXISTING MEZZANINE STRUCTURAL SLAB BETWEEN EXISTING BEAMS. THER
|
|
Work on Floor(s): BAS,001,MEZ,002,003,004
|
| 04/26/2017 |
123061122 |
01 |
A2 |
X SIGNED OFF |
10/30/2020 |
0024014 RA |
SELLDORF |
|
NOT APPLICABLE
|
|
DEMOLISH INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILE
|
|
Work on Floor(s): BAS,001,MEZ,002,003,004
|
| 02/23/2017 |
123028428 |
01 |
A2 |
X SIGNED OFF |
07/02/2019 |
0064829 PE |
GREEN |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY SPRINKLER LOOP HEADS AND PIPING AS SHOWN ON DRAWINGS FI
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/02/2017 |
123010534 |
01 |
A2 |
P APPROVED |
07/18/2018 |
0064829 PE |
GREEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/23/2019 INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/30/2017 |
123008280 |
01 |
A2 |
X SIGNED OFF |
08/21/2023 |
0027948 PE |
MARIN |
|
NOT APPLICABLE
|
|
MANUAL & AUTOMATIC SMOKE DETECTION SPRINKLER ALARM SYSTEM AS SHOWN ON
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/12/2017 |
122629003 |
03 |
A1 |
X SIGNED OFF |
08/19/2024 |
0064095 PE |
MURRAY |
|
AMENDED 11/29/2023
|
|
STRUCTURAL WORK TO LOWER GROUND FLOOR AND NEW ROOF FRAMING REDUCED TO EXIS
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/12/2017 |
122629003 |
02 |
A1 |
X SIGNED OFF |
08/19/2024 |
0064829 PE |
GREEN |
|
AMENDED 11/29/2023
|
|
INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNITS. INSTALL NEW PLUMBING
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|