 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/14/2021 |
140984567 |
02 |
A2 |
P APPROVED |
11/01/2021 |
|
LI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/27/2020 |
140984567 |
01 |
A2 |
R PERMIT-ENTIRE |
12/24/2020 |
0098295 PE |
LI |
|
NOT APPLICABLE
|
|
COMBINE APARTMENT UNITS 1 &2, 3& 4, REMOVE STOVE AND CAP GAS LINE IN APART
|
|
Work on Floor(s): 001
|
| 11/09/2015 |
140426162 |
01 |
A2 |
X SIGNED OFF |
12/10/2015 |
0054060 PE |
CAGAN |
|
NOT APPLICABLE
|
|
RENOVATIONS IN CELLAR AS PER PLANS FILED TO RESOLVE VIOLATIONS
|
|
Work on Floor(s): CEL
|
| 10/22/2015 |
122029786 |
02 |
A2 |
P APPROVED |
12/10/2015 |
|
CHOI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
| 10/22/2015 |
122252828 |
03 |
A2 |
P APPROVED |
04/26/2016 |
|
CHOI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION APT 1C IN 1ST FFLOOR, EXISTING C
|
|
Work on Floor(s): CEL,001
|
| 09/22/2015 |
122252819 |
03 |
A2 |
P APPROVED |
05/24/2016 |
|
CHOI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION APT 1B & APT 1D IN 1ST FLOOR, EX
|
|
Work on Floor(s): CEL,001
|
| 07/16/2015 |
122467589 |
01 |
A2 |
Q PERMIT-PARTIAL |
07/22/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT # 39 @ 5TH FLOOR, AS SHOWN ON PLANS. NO CHANGES
|
|
Work on Floor(s): 005
|
| 04/27/2015 |
122252828 |
02 |
A2 |
X SIGNED OFF |
07/19/2016 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
FILING FOR OT-STR FOR STRUCTURAL
|
|
Work on Floor(s): CEL,001
|
| 04/27/2015 |
122252819 |
02 |
A2 |
X SIGNED OFF |
08/04/2016 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
FILING FOR OT-STR FOR STRUCTURAL
|
|
Work on Floor(s): CEL,001
|
| 03/24/2015 |
122345104 |
01 |
A2 |
X SIGNED OFF |
09/23/2015 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
FILING TO RESOLVE THE ECB VIOLATIONS ISSUED TO APT:1C FOR WORK WITHOUT A P
|
|
Work on Floor(s): CEL,001
|
| 01/21/2015 |
122252819 |
01 |
A2 |
X SIGNED OFF |
08/04/2016 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
RENOVATION APT 1B & APT 1D IN 1ST FLOOR, EXISTING CELLAR TO REMAIN AS BOIL
|
|
Work on Floor(s): CEL,001
|
| 01/21/2015 |
122252828 |
01 |
A2 |
X SIGNED OFF |
07/19/2016 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
RENOVATION APT 1C IN 1ST FFLOOR, EXISTING CELLAR RO REMAIN AS BOILER ROOM
|
|
Work on Floor(s): CEL,001
|
| 06/04/2014 |
122029786 |
01 |
A2 |
X SIGNED OFF |
07/08/2016 |
0031839 RA |
CHOI |
|
NOT APPLICABLE
|
|
PROPOSE TO SUPERSEDE LAA 121672332,100021637 TO REPAIR THE GAS PIPING TO
|
|
Work on Floor(s): CEL 001 thru 006
|
| 03/27/2013 |
121573975 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/03/2013 |
0029465 RA |
TEHN-ADD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/30/2023 JOB FIELD TO DO RENOVATION IN EXISTING APT IN RE
|
|
Work on Floor(s): 001
|
| 12/27/2011 |
120880779 |
02 |
A2 |
P APPROVED |
02/09/2012 |
|
CHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 11/01/2011 |
120880779 |
01 |
A2 |
X SIGNED OFF |
04/20/2012 |
0065657 PE |
CHAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION IN APT #8 AT 2ND FLOOR. NO CHANGE OF USE, EGRESS, OR
|
|
Work on Floor(s): 002
|
| 12/21/2010 |
120559788 |
01 |
A2 |
X SIGNED OFF |
07/11/2011 |
0065657 PE |
CHAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION FOR LEVEL EXISTING FLOOR; REPLACE BATHROOM TILE; REPLA
|
|
Work on Floor(s): 001,004
|
| 06/16/2009 |
120072401 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/03/2010 |
0029465 RA |
TENHADDY |
|
NOT APPLICABLE
|
|
JOB FIELD TO DO GENERAL CONSTRUCTION IN EXISITING APARTMENT ALSO INSTALLIN
|
|
Work on Floor(s): 005
|
| 01/27/2003 |
103357145 |
01 |
A2 |
R PERMIT-ENTIRE |
02/10/2003 |
0015049 RA |
SCHWARTZ |
|
NOT APPLICABLE
|
|
PROPOSE TO REPLACE STUCCO/FIRE PROOF COATING ON FACADE AT FRONT OF
|
|
Work on Floor(s): 1
|
| 01/02/2003 |
103341910 |
01 |
A3 |
R PERMIT-ENTIRE |
01/07/2003 |
|
PIZZO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/03/2024 INSTALLATION OF A HEAVY DUTY SHED 50' DURING FACA
|
|
Work on Floor(s): GRD
|
| 08/16/2000 |
102741099 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/01/2001 |
0026782 RA |
WONG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/30/2023 MINOR INTERIOR RENOVATION ONLY NO CHANGE IN USE
|
|
Work on Floor(s): CEL,1
|
| 02/25/1999 |
102103581 |
01 |
A2 |
R PERMIT-ENTIRE |
04/21/1999 |
0024849 RA |
Kang |
|
NOT APPLICABLE
|
|
Minor interior renovation only.No Change to existing use, occupancy or egr
|
|
Work on Floor(s): CEL 001 CEL
|
| 11/06/1998 |
102233067 |
01 |
A2 |
R PERMIT-ENTIRE |
12/22/1998 |
0024849 RA |
Kang |
|
NOT APPLICABLE
|
|
Minor interior renovation only. And to legalize violation #: 34190759R.
|
|
Work on Floor(s): 002
|
| 06/05/1998 |
101768909 |
01 |
A2 |
R PERMIT-ENTIRE |
07/13/1998 |
0024849 RA |
KANG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/30/2023 MINOR INTERIOR RENOVATION ONLY.NO CHANGE TO EXIST
|
|
Work on Floor(s): 001,CEL
|
| 09/21/1995 |
101077237 |
01 |
A2 |
X SIGNED OFF |
04/18/1997 |
0007554 RA |
FEINGOLD |
|
NOT APPLICABLE
|
|
INSTALL TENANTS LAUNDRY IN CELLAR. NO CHANGE IN USE EGRESS OR OCCUP
|
|
Work on Floor(s): CEL
|
| 05/20/1992 |
100432505 |
01 |
A2 |
R PERMIT-ENTIRE |
06/17/1992 |
0016844 RA |
BARTA |
|
NOT APPLICABLE
|
|
PROPOSE TO RENOVATE APT #21 - NEW BATH ENCLOSURE PARTITION, NEW CLOSET,
|
|
Work on Floor(s): 4
|
| 12/16/1991 |
100354162 |
01 |
A2 |
X SIGNED OFF |
08/18/1992 |
0016844 RA |
BARTA |
|
NOT APPLICABLE
|
|
IN APT.#27 NEW W.C.& W.B. & TUB IN NEW ENCLOSURE NEW CL.NEW KIT.FIXT.
|
|
Work on Floor(s): 3
|
| 07/31/1991 |
100285889 |
01 |
A2 |
R PERMIT-ENTIRE |
08/07/1991 |
0016844 RA |
BARTA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/08/2023 PROPOSE TO RENOVATE APT #3. NEW BATH & KITCHEN FI
|
|
Work on Floor(s): 1ST
|
| 05/09/1990 |
100038291 |
01 |
A2 |
X SIGNED OFF |
08/26/1991 |
0016844 RA |
BARTA |
|
NOT APPLICABLE
|
|
PROPOSE TO RENOVATE WITH NEW FINISHES, B ATH & KIT. FIXTURES IN THE APT.
|
|
Work on Floor(s): 2, 1
|