| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/26/2016 |
122898597 |
01 |
A2 |
R PERMIT-ENTIRE |
11/07/2016 |
0031258 RA |
BRIGHT |
|
NOT APPLICABLE
|
|
RENOVATION TO EXISTING COMMERCIAL TENANT ON SECOND FLOOR. ARCHITECTURAL,
|
|
Work on Floor(s): 002
|
| 04/20/2010 |
103924719 |
03 |
A1 |
P APPROVED |
06/14/2010 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 11/20/2009 |
104032869 |
05 |
A2 |
P APPROVED |
12/04/2009 |
|
Chen |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|
| 04/21/2009 |
104032869 |
04 |
A2 |
P APPROVED |
05/08/2009 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|
| 04/08/2009 |
110341149 |
02 |
A2 |
P APPROVED |
04/10/2009 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/10/2008 |
103924719 |
02 |
A1 |
P APPROVED |
03/10/2009 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|
| 09/17/2008 |
110247199 |
01 |
A2 |
X SIGNED OFF |
05/06/2009 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
WORK FILED HEREIN TO INSTALL NEW A/C SYSTEMS AS PER PLANS, NO CHANGE IN US
|
|
Work on Floor(s): 001 thru 006
|
| 09/10/2008 |
110341149 |
01 |
A2 |
X SIGNED OFF |
08/18/2009 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
WORK FILED HEREIN FOR BOILER WORK TYPE ONLY AND IN CONJUNCTION WITH DOB
|
|
Work on Floor(s): CEL
|
| 01/12/2007 |
104639811 |
01 |
A3 |
X SIGNED OFF |
06/02/2010 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF 25 L.F.TEMPORARY HEAVY DUTY SIDEWALK SHED FOR FACADE REPAI
|
|
Work on Floor(s): 001
|
| 08/19/2005 |
104202266 |
01 |
A3 |
X SIGNED OFF |
07/12/2006 |
0081332 PE |
MALIK |
|
NOT APPLICABLE
|
|
Propose to install 25 linear feet of temp. pipe scaffold for facade repoin
|
|
Work on Floor(s): 001 thru 005
|
| 08/03/2005 |
104185301 |
01 |
A3 |
X SIGNED OFF |
07/12/2006 |
0081332 PE |
MALIK |
|
NOT APPLICABLE
|
|
Propose to install 25 linear feet of temp. sidewalk shed for facade repoin
|
|
Work on Floor(s): 001 thru 005
|
| 04/08/2005 |
104032869 |
03 |
A2 |
X SIGNED OFF |
01/28/2010 |
0074885 PE |
Chen |
|
NOT APPLICABLE
|
|
Filed herewith submitting PL work type for connection of sprinkler system
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|
| 02/18/2005 |
104032869 |
01 |
A2 |
X SIGNED OFF |
01/28/2010 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
PROPOSED SPRINKLER SYSTEM INSTALLATION, FILED TO CONJUNCTION WITH
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|
| 09/16/2004 |
103924719 |
01 |
A1 |
X SIGNED OFF |
08/03/2010 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
PROPOSED CHANGE USE ON 4TH FLOOR AND ADD 6TH FLOOR AS PER PLANS
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 08/10/1993 |
100668939 |
01 |
A3 |
R PERMIT-ENTIRE |
09/02/1993 |
0064159 PE |
HSU |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/14/2010 MAKE A OPENING 4'X 7' BETWEEN 270 & 272. INSTALL
|
|
Work on Floor(s): 1
|
|
104032869 |
02 |
A2 |
A PRE-FILED |
04/08/2005 |
0074885 PE |
CHEN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/08/2005
|
|
Work on Floor(s): CEL,001,002,003,004,005 001 thru 006
|