 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/24/2020 |
140995813 |
01 |
A2 |
X SIGNED OFF |
10/06/2021 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH
|
|
Work on Floor(s): 002,005
|
| 12/24/2020 |
140995804 |
01 |
A2 |
X SIGNED OFF |
10/01/2021 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH
|
|
Work on Floor(s): BAS,001,002
|
| 12/24/2020 |
140995779 |
01 |
A2 |
D A/P ENTIRE |
12/24/2020 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/24/2020 INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREW
|
|
Work on Floor(s): BAS,001,002
|
| 09/08/2015 |
140396391 |
01 |
A3 |
X SIGNED OFF |
07/12/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 08/26/2015 |
140376215 |
01 |
A2 |
R PERMIT-ENTIRE |
09/23/2015 |
0083149 PE |
MOHAMMAD |
|
NOT APPLICABLE
|
|
FACADE REPAIR WHICH INCLUDES GRINDING AND POINTING, REPLACEMENT OF 11 WIND
|
|
Work on Floor(s): FAC
|
| 07/08/2015 |
140373094 |
01 |
A2 |
H P/E IN PROCESS |
07/08/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/15/2015 INSTALL SIDEWALK SHED AS PER PLANS FOR REMEDIAL R
|
|
Work on Floor(s): FAC
|
| 10/02/2003 |
103573946 |
01 |
A3 |
R PERMIT-ENTIRE |
10/14/2003 |
|
HAROON |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED 25' LONG AT 171 6TH AVENUE-DURING
|
|
Work on Floor(s): OSP
|
| 06/30/1993 |
100640834 |
01 |
A3 |
X SIGNED OFF |
09/23/1993 |
0017585 RA |
GATTER |
|
NOT APPLICABLE
|
|
REMOVAL OF (1) ONE NON BEARING PARTITION & ENLARGING CLOSET.
|
|
Work on Floor(s): 1
|
| 08/03/1992 |
100459102 |
01 |
A2 |
R PERMIT-ENTIRE |
08/20/1992 |
0006609 PE |
ARMSTRON |
|
NOT APPLICABLE
|
|
INSTALL H.B SMITH BOILER NO CHANGE IN USE EGRESS OR OCCUPANCY
|
|
Work on Floor(s): BMT
|