Premises: 127 MERCER STREET MANHATTAN BIN: 1007627    Block: 499    Lot: 7501

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
11/15/2017 122646011 02 A2 P APPROVED 11/30/2017 FREEMAN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

11/14/2016 122902056 01 A2 X SIGNED OFF 04/24/2017 0048838 PE MERRITT NOT APPLICABLE
 FACADE RESTORATION AT REAR COURTYARD AS PER PLANS SUBMITTED HEREWITH. WORK
 Work on Floor(s): ROF 001 thru 006

11/07/2016 122723589 01 A2 D A/P ENTIRE 11/07/2016 0048838 PE MERRITT NOT APPLICABLE
 JOB WITHDRAWN 11/21/2016 FACADE RESTORATION AT REAR COURTYARD AS PER PLANS
 Work on Floor(s): ROF 001 thru 006

11/04/2016 140572057 01 A2 D A/P ENTIRE 11/04/2016 0048838 PE MERRITT NOT APPLICABLE
 JOB WITHDRAWN 11/04/2016 FACADE RESTORATION AT REAR COURTYARD AS PER PLANS
 Work on Floor(s): ROF 001 thru 006

09/20/2016 122646011 01 A2 R PERMIT-ENTIRE 09/26/2017 0010673 RA FREEMAN NOT APPLICABLE
 RENOVATION OF BUILDING LOBBY; DEMOLITION OF FINISHES;INSTALLATION OF COSME
 Work on Floor(s): 001

07/21/2016 122386079 03 A2 D A/P ENTIRE 07/25/2016 SHAPIRO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 RENOVATE APARTMENT 4B ON FOURTH FLOOR AND A
 Work on Floor(s): 004

07/07/2016 122386079 02 A2 P APPROVED 07/08/2016 SHAPIRO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 RENOVATE APARTMENT 4B ON FOURTH FLOOR AND A
 Work on Floor(s): 004

03/25/2016 140474948 01 A3 X SIGNED OFF 11/07/2018 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
 Work on Floor(s): OSP

03/24/2016 140474136 01 A3 X SIGNED OFF 11/07/2018 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
 Work on Floor(s): OSP

03/21/2016 122726648 01 A2 R PERMIT-ENTIRE 05/13/2016 0068464 PE RINI NOT APPLICABLE
 MECHANICAL AND SPRINKLER WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2
 Work on Floor(s): 004

02/01/2016 122153515 01 A2 X SIGNED OFF 04/24/2017 0048838 PE MERRITT NOT APPLICABLE
 EAST FACADE RESTORATION TO INCLUDE FACE BRICK REPLACEMENT, STONE
 Work on Floor(s): 002 thru 006

02/01/2016 122125155 01 A2 X SIGNED OFF 04/24/2017 0048838 PE MERRITT NOT APPLICABLE
 BOILER ROOM REPAIRS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EG
 Work on Floor(s): CEL

05/01/2015 122386079 01 A2 R PERMIT-ENTIRE 10/31/2018 0010331 RA SHAPIRO NOT APPLICABLE
 RENOVATE APARTMENT 4B ON FOURTH FLOOR AND ADD NEW BALCONY AT THE REAR.
 Work on Floor(s): 004

02/05/2015 122048079 02 A2 P APPROVED 03/18/2015 PARGANOS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001

06/25/2014 122049648 02 A2 X SIGNED OFF 01/15/2016 0081085 PE PARGANOS NOT APPLICABLE
 MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.
 Work on Floor(s): CEL,001

06/25/2014 122049648 01 A2 X SIGNED OFF 01/15/2016 0034845 RA MASON NOT APPLICABLE
 INTERIOR RENOVATION TO INCLUDE DEMOLITION OF EXISTING AND CONSTRUCTION OF
 Work on Floor(s): CEL,001

06/25/2014 122049648 03 A2 X SIGNED OFF 01/15/2016 0086233 PE TOCCI NOT APPLICABLE
 STRUCTURAL WORK AS SHOWN ON PLANS FILED HEREWITH.
 Work on Floor(s): CEL,001

06/24/2014 122048079 01 A2 X SIGNED OFF 02/03/2016 0081085 PE PARGANOS NOT APPLICABLE
 SPRINKLER WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,
 Work on Floor(s): CEL,001

06/09/2014 122023292 01 A2 X SIGNED OFF 07/10/2015 0026000 RA CLEARY NOT APPLICABLE
 FILING FOR KITCHEN RENOVATION ON LOWER FLOOR; CHANGING LAYOUT OF MIDDLE FL
 Work on Floor(s): 006,PT1

04/29/2014 140191619 01 A2 X SIGNED OFF 01/12/2016 0034845 RA MASON NOT APPLICABLE
 EXTERIOR RENOVATION TO INCLUDE GLAZING AND HARDWARE REPLACEMENT AND GENERA
 Work on Floor(s): CEL,001

06/15/2011 120719035 01 A3 R PERMIT-ENTIRE 07/01/2011 0033662 RA MAYNARD NOT APPLICABLE
 INSTALLATION OF A SCAFFOLD APPROXIMATELY 30'HIGH AS PER PLANS DURING EXTER
 Work on Floor(s): OSP

07/26/2010 120423158 01 A2 R PERMIT-ENTIRE 04/05/2011 0019567 RA HU NOT APPLICABLE
 FILING TO COMBINE ADJACENT APARTMENTS AS PER TPPN 3/97. REMOVE AND INSTAL
 Work on Floor(s): 3RD

04/06/2010 101702506 08 A1 P APPROVED 04/08/2010 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 6, PH1,PH2

03/30/2010 101702506 07 A1 P APPROVED 04/02/2010 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 6, PH1,PH2

03/04/2010 101702506 06 A1 P APPROVED 03/04/2010 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 6, PH1,PH2

11/23/2009 101702506 05 A1 P APPROVED 12/04/2009 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 6, PH1,PH2

02/10/2009 103595520 05 A2 P APPROVED 02/12/2009 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003

12/08/2008 103595520 04 A2 P APPROVED 12/10/2008 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003

11/21/2008 103595520 03 A2 P APPROVED 11/25/2008 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003

08/02/2007 104857763 01 A2 X SIGNED OFF 06/17/2008 0058090 PE Wai NOT APPLICABLE
 Replace existing boiler. No change in egress, occupancy or use is involve
 Work on Floor(s): CEL

06/01/2006 103595520 02 A2 P APPROVED 06/08/2006 0013798 RA PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 003

11/22/2005 101702506 04 A1 P APPROVED 01/27/2006 0013798 RA PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 RENOVATE PENTHOUSE APARTMENTS, CHANGE FR OM
 Work on Floor(s): 6, PH1,PH2

10/20/2003 103595520 01 A2 X SIGNED OFF 03/19/2009 0013798 RA PEACHY NOT APPLICABLE
 Interior renovation of an artist joint living and working quarter number 3
 Work on Floor(s): 003

07/22/1999 102245722 01 A2 X SIGNED OFF 10/01/2008 0013798 RA PEACHY NOT APPLICABLE
 partition work, kitchen cabinetry replacenent, replacement of plumbing fix
 Work on Floor(s): 005

07/21/1999 102245713 01 A3 X SIGNED OFF 11/01/2007 0013798 RA PEACHY NOT APPLICABLE
 damaged roofing material repair, erection of wood trellis, and repair of b
 Work on Floor(s): ROF

08/15/1997 101702506 03 A1 D A/P ENTIRE 08/22/1997 0022971 RA DENNER NOT APPLICABLE
 DOC WITHDRAWN 11/05/1997
 Work on Floor(s): 6, PEN,PT1

07/23/1997 101702506 02 A1 P APPROVED 07/25/1997 0013798 RA PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 6, PH1,PH2

07/03/1997 101702506 01 A1 X SIGNED OFF 04/16/2010 0013798 RA PEACHY NOT APPLICABLE
 RENOVATE PENTHOUSE APARTMENTS, CHANGE FR OM (3)APTS.TO(2)APTS.AT 6TH FL.
 Work on Floor(s): 6, PH1,PH2

07/01/1997 101705718 01 SC J P/E DISAPPROVED 07/08/1997 0022971 RA DENNER NOT APPLICABLE
 JOB WITHDRAWN 10/22/2007
 Work on Floor(s): 6, PE1,PEN

12/09/1996 101331514 03 A2 P APPROVED 12/18/1996 0046746 PE MARINO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 2