 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/31/2016 |
140569882 |
PR |
I LAA SIGNED OFF |
02/27/2017 |
MP 001822 |
WARSHAW |
|
REPLACE METER BAR & METER. REPLACE APPROX 150' OF 3/4" GAS PIPING FROM THE
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/24/2013 |
140128154 |
PR |
I LAA SIGNED OFF |
06/11/2014 |
MP 000837 |
SEMENTA |
|
OIL TO GAS CONVERSION USE EXISTING BURNHAM BOILER MODEL V-88 MEA 231-66-E
|
|
Work on Floor(s): CEL
|
| 05/23/2013 |
121233977 |
PR |
E LAA FILED |
05/24/2013 |
MP 001382 |
JENNINGS |
|
OIL TO GAS CONVERSION IN CELLAR. VENT THRU EXISTING CHIMNEY. RIELLO C85541
|
|
Work on Floor(s): CEL
|
| 12/28/2011 |
140005447 |
PR |
I LAA SIGNED OFF |
01/31/2012 |
MP 001382 |
JENNINGS |
|
INSTALL APPX 20 FT OF 1 INCH GAS PIPE ORIGINAL PIPE AND EQUIPEMENT FILED U
|
|
Work on Floor(s): CEL,001,002
|
| 10/19/2011 |
110559253 |
PR |
E LAA FILED |
10/21/2011 |
MP 001382 |
JENNINGS |
|
OIL TO GAS CONVERSION IN CELL VENT THRU EXISTING CHIMNEY. RIELLO C8554115
|
|
Work on Floor(s): CEL
|
| 03/25/2003 |
102273987 |
PR |
I LAA SIGNED OFF |
04/22/2003 |
OBI 005265 |
BRAUN |
|
TO REPLACE A BOILER AND AN OIL BURNER. TO CONNECT TO THE EXISTING MASONRY
|
|
Work on Floor(s): BAS
|